-
Engineering Management and Administration
001: What Doctrine is used to combat class “B” fires in propulsion spaces?
Ship’s Main Space Doctrine (MSFD).
-
Engineering Management and Administration
002: All environmental quality issues are contained in what instruction?
OPNAVINST 5090.1 series.
-
Engineering Management and Administration
003: If a hazardous material spill causes fatalities or excessive damage what Naval Message must be sent?
OPREP-3
-
Engineering Management and Administration
004: Where should a hazardous material spill be logged?
In the Engineering Log and Deck Log.
-
Engineering Management and Administration
005: Oil spill reporting procedures can be found in what instruction?
OPNAVINST 5090.1 series.
-
Engineering Management and Administration
006: During a ship’s phased maintenance availability an EOSS verification will be scheduled when?
Approximately 4 weeks prior to the ending of the availability .
-
Engineering Management and Administration
007: Where are emergent EOSS feedback reports sent?
To NAVWARCENSSES.
-
Engineering Management and Administration
008: Who authorizes preliminary pen and ink changes to EOSS?
Commanding Officer.
-
Engineering Management and Administration
009: Full power and economy trials are conducted IAW what instruction?
OPNAVINST 9094.1 series.
-
Engineering Management and Administration
010: All full power trials must be accomplished with what percentage of liquid load on board?
75%
-
Engineering Management and Administration
011: What detrimental effect s could occur to the propulsion plant if the full power trial is conducted in shallow water?
Excessive vibration, loss of speed and overloading of the propulsion plant.
-
Engineering Management and Administration
012: During a full power trial, propulsion plant readings are taken at what interval?
Every 15 minutes.
-
Engineering Management and Administration
013: What type of inspection is required when the propulsion plant has been idle for in excess of 120 days?
Light-Off Examination (LOE).
-
Engineering Management and Administration
014: Who normally conducts a Light-Off Examination?
Propulsion Examination Board (PEB).
-
Engineering Management and Administration
015: Who does the Board of Inspection and Survey report its finding to?
Chief Of Naval Operation (CNO)
-
Engineering Management and Administration
016: The INSERV material inspection is conducted on all ships at what interval?
Every three years.
-
Engineering Management and Administration
017: After INSERV conduct a survey ordered by the CNO to determine a vessel’s fitness for further duty an option of the findings is sent to whom?
The secretary of the Navy.
-
Engineering Management and Administration
018: EOSS was established by what directive?
OPNAVINST 9200.1 series.
-
Engineering Management and Administration
019: What pollution control act enacted in 1961 prohibits the discharge of oil or oily mixtures, such as ballast, within a prohibited zone established by any nation, and those zones range from 50 to 150 miles seaward to the nearest land?
The Oil Pollution Control Act of 1961.
-
Engineering Management and Administration
020: What pollution control act deals specifically with waters in the contiguous 12 miles zone?
The Water Quality Improvement Act of 1979.
-
Engineering Management and Administration
021: What NSTM specifically deals with pollution abatement?
NSTM 593.
-
Engineering Management and Administration
022: CHT is allowed to be discharged to the sea at what distance from land?
3 miles or more from land.
-
Engineering Management and Administration
023: what is the contiguous zone?
12 miles from the baseline from which the territorial sea is measured.
-
Engineering Management and Administration
024: All oil spills that produce a visible sheen in the Unite3d States navigable waters and the contiguous zone must be reported immediately to whom?
Commander of local Coast Guard District.
-
Engineering Management and Administration
025: What instruction outlines the provisions of the Federal law that deals with oil pollution?
OPNAVINST 5090.1 series.
-
Engineering Management and Administration
026: Who is responsible for coordinating the QA training program?
Quality Assurance Officer
-
Engineering Management and Administration
027: When dealing with quality assurance, what does the acronym CWP means?
Controlled Work Package.
-
Engineering Management and Administration
028: What publication is used for all QA matters?
Joint Fleet Maintenance Manual, CINCLANTFLT/CINCPACFLTINT 4790.3 series.
-
Engineering Management and Administration
029: What is a Formal Work Package (FWP)?
Written instruction prepared IAW JFMM 4790.3 for used in production and repair, delineating all essential elements and guidance necessary to produce acceptable and reliable results.
-
Engineering Management and Administration
030: How are pen and ink changes made to a Formal Work Package?
By drawing a single line through the portion to be changed and entering the necessary change adjacent to that portion.
-
Engineering Management and Administration
031: Who does the craftsman notify if rework is required?
The LPO or WCS.
-
Engineering Management and Administration
032: who authorizes all rework steps in a Formal Work Package?
The Responsible Officer.
-
Engineering Management and Administration
033: Who reviews the DFS for technical accuracy and signs the DFS?
The Engineer Officer.
-
Engineering Management and Administration
034: DFSs are classified in what two groups?
Minor and major.
-
Engineering Management and Administration
035: A major DFS requires approval from whom?
TYCOM or NAVSEA
-
Engineering Management and Administration
036: What is the function of a vertical QA audit?
To determine if a specific job or task has been completed in accordance with the required specifications.
-
Engineering Management and Administration
037: what is the function of a horizontal QA audit?
To receive one specific area or part of an area to ensure compliance with the governing requirements.
-
Engineering Management and Administration
038. what is the color of a QA non-nuclear ID/ control tag?
Green tag with black lettering.
-
Engineering Management and Administration
039. A QA controlled material rejection tag is what color?
Red tag with black lettering.
-
Engineering Management and Administration
040. who signs and dates the QA controlled material rejection tag?
Division Officer.
-
Engineering Management and Administration
041. who approves the QA controlled material rejection tag?
Quality assurance officer.
-
Engineering Management and Administration
042. what form is used to report a DFS?
QA form 42
-
Engineering Management and Administration
043. in the QA process, what must be submitted when there is a lack of compliance with an authoritative document, plan procedure or instruction?
A departure from specification (DFS)
-
Engineering Management and Administration
044. what volume of the Joint Fleet maintenance Manual pertains to formal work procedures (FWP)?
Volume V.
-
Engineering Management and Administration
045. what individual is assigned the responsibility for the organization, administration, and execution of the Quality Assurance Program?
Quality Assurance Officer (QAO)
-
Engineering Management and Administration
046. what is a Formal Work Procedure used for in the QA process?
Provides the craftsman with clear, concise, and technically correct instruction for performing assigned maintenance.
-
Engineering Management and Administration
047. Formal Work Procedures can be used as a cure for what type of work package?
Controlled Work Package (CWP)
-
Engineering Management and Administration
048. when is a Controlled Work Package required?
Dependent on the level of essentially of the system (level I) or when extensive and formal QA or test requirement exist.
-
Engineering Management and Administration
049. what type of QA package is required when troubleshooting and repairing diesel engine?
Formal Work Package (FWP)
-
Engineering Management and Administration
050. who is responsible for preparing a QA Formal Work Procedures?
Division Leading Petty Officer (LPO)
-
Engineering Management and Administration
051. who approves the Formal Work Procedures?
Department Head.
-
Engineering Management and Administration
052. Who approves pen and ink changes to the Formal Work Procedures?
LPO or Division Officer for the affected step in the FWP
-
Engineering Management and Administration
053. rework on a Formal Work Procedure is approved by whom?
Division Officer responsible for the work.
-
Engineering Management and Administration
054. Annual QA audits are conducted by whom?
Immediate Superior in Command (ISIC)
-
Engineering Management and Administration
055. Aboard ship who is responsible for maintaining the DFS file?
Quality Assurance Officer.
-
Engineering Management and Administration
056. what three systems and boundaries aboard conventional surface ship are designated Level I?
Gaseous oxygen system above 100 PSIG with the exception of diver’s surface supplied oxygen system and recompression. 2) Liquid Oxygen and liquid nitrogen (O2N2) piping. 3) Main steam and catapult steam system piping and all branch piping exceeding 775 degrees F.
-
Engineering Management and Administration
057. what are two types of QA audits?
Horizontal and vertical.
-
Engineering Management and Administration
058. What type of QA audit is concentrated on one specific area or part to ensure compliance?
Horizontal
-
Engineering Management and Administration
059. what type of QA audit is conducted to ensure a task was completed correctly IAW specifications?
Vertical.
-
Engineering Management and Administration
060. QA Form-14 is used for what?
Conducting QA audits.
-
Engineering Management and Administration
061. when conducting hydrostatic testing what QA form is used?
QA form-26
-
Engineering Management and Administration
062. what document is used to provide a report of testing and inspecting when not covered by other QA forms?
QA form -17
-
Engineering Management and Administration
063. who conducts final contract trials?
INSURV.
-
Engineering Management and Administration
064. Ship’s equipped with an automatic data/bell logger are required to maintain an Engineer’s bell book under what circumstances?
When the automatic bell logger is inoperable.
-
Engineering Management and Administration
065. legal records are disposed of IAW what Instruction?
SECNAVINST 5212.5 series.
-
Engineering Management and Administration
066. in machinery spaces where no EOOW is stationed, engineer’s bell book must be signed by whom?
Senior Petty Officer of the Watch.
-
Engineering Management and Administration
067. after a shipyard overhaul ships are normally allotted how much time before conducting full power and economy trials?
1 month.
-
Engineering Management and Administration
068. When can AFFF be discharged to the sea?
Upon reaching 12 miles from land
-
Engineering Management and Administration
069.what document is used as an information and management tool during a routine waste heat boiler inspection?
BIRMIS report
-
Engineering Management and Administration
070. the BIRMIS report contains how many sections?
Three
-
Engineering Management and Administration
071. when is the Steam Plant Water Treatment Log Package Compiled?
Monthly.
-
Engineering Management and Administration
072. The Steam Plant Water Treatment Log Package contains what enclosures?
Auxiliary boiler chemistry worked sheet log, fee water chemistry worksheet log, cover sheet, Data Sheet and Chemical Log.
-
Engineering Management and Administration
073. who reviews and initials the auxiliary boiler water chemistry worksheet log daily?
LCPO and MPA.
-
Engineering Management and Administration
074. who reviews and signs the auxiliary boiler water chemistry worksheet log?
-
-
Engineering Management and Administration
075. after the Engineering Officer signs the Steam Plant Water Treatment Log Package it is signed by whom?
Commanding Officer.
-
Engineering Management and Administration
076. on what log are chemical test and salinity indicator comparision result logged?
Auxiliary/waste heat fee water chemistry worksheet log.
-
Engineering Management and Administration
077. how long is the steam plant water treatment log package retained onboard?
2 years
-
Engineering Management and Administration
078. who initials and out of limits reading on the auxiliary feedwater chemistry worksheet log?
The EOOW and Engineering Officer
-
Engineering Management and Administration
079. the setting of the boiler safety valves is recorded on which log?
The Auxiliary Boiler Chemistry Worksheet Log.
-
Engineering Management and Administration
080. all diesel inspections are conducted IAW directives?
OPNAVINST 9233.1 and the U.S Navy Diesel Engine Inspector Hand Book part. 1
-
Engineering Management and Administration
081. how long are diesel inspection reports retained onboard?
10 years or until a major diesel engine overhaul.
-
Engineering Management and Administration
082. what program is used to determine optimum performance?
Diesel trend Analysis Program.
-
Engineering Management and Administration
083. what report is submitted daily to the Commanding Officer and indicates the amount of fuel oil and water on hand as of midnight?
Fuel And Water Report.
-
Engineering Management and Administration
084. how long is the Fuel and Water Report required to be retained on board?
30 days.
-
Engineering Management and Administration
085. Diesel generator trend analysis are conducted at what minimum generator load?
80 percent.
-
Engineering Management and Administration
086. what type of lube oil analysis allows you to determine the extent or wear in internal combustion engines?
Spectrometric oil analysis.
-
Engineering Management and Administration
087. The term CASREP means what?
Casualty report
-
Engineering Management and Administration
088. what category of CASREP would be sent when the ship can no longer complete its mission?
Category four (C-4)
-
Engineering Management and Administration
089. all CASREPs are drafted using what publication?
NWP-10
-
Engineering Management and Administration
090. what condition of readiness is Wartime steaming?
III
-
Engineering Management and Administration
091. What condition of readiness is peacetime steaming?
IV
-
Engineering Management and Administration
092. When a ship is inport and the engineering plant is in a cold iron status, what readiness condition will be set?
Condition V
-
Engineering Management and Administration
093. Condition of readiness V is normally set when?
Inport.
-
Engineering Management and Administration
094. what condition of readiness provides the ship with best survivality during battle?
Condition I.
-
Engineering Management and Administration
095. What material condition of readiness is set during Condition I?
Zebra.
-
Engineering Management and Administration
096. What is the highest readiness condition?
Condition 1 , General Quarters.
-
Engineering Management and Administration
097. What document is used by the Division Officer to track watchstation requirements at different condition of readiness?
Watch quarter and station (WQS) bill.
-
Engineering Management and Administration
098. Using Navy Standard DC symbology what does T mean?
Communication Lost.
-
Engineering Management and Administration
099.Using Navy Standard Symbology what does FB mean?
Fire Boundaries set.
-
Engineering Management and Administration
100. what sound powered phone circuit is used as the DC stability circuit?
2JZ
-
Engineering Management and Administration
101. what sound powered phone circuit is the Captains battle circuit?
JA
-
Engineering Management and Administration
102. During engineering casualty control drills, what sound powered phone circuit does the EOOW use to effectively control the engineering room?
2JV
-
Engineering Management and Administration
103. What MC is designated as machinery control?
26MC.
-
Engineering Management and Administration
104. What alarm overrides all other shipboard alarms?
General Alarm.
-
Engineering Management and Administration
105. What is the function of the @!MC?
To maintain communications between vital areas, OOD to EOOW, CIC, DCC.
-
Engineering Management and Administration
106. Special evolution’s and the Engineer’s orders for the night are contained in what document?
Night Orders.
-
Engineering Management and Administration
107. What publication gives instructions on preparing and use of the Engineering Log?
NSTM 090.
-
Engineering Management and Administration
108. Who reviews operating logs at the end of each watch and initials them?
The EOOW.
-
Engineering Management and Administration
109. Results of a tag-out audit are reported to whom?
Engineering Officer.
-
Engineering Management and Administration
110. why does the authorizing officer notify damage control central that a tag-out is in progress?
To ensure that Damage Control Central is fully cognizant of the extent of the tag-out and the status of the material condition of the unit to be tagged.
-
Engineering Management and Administration
111. How does the authorizing officer annotates that Damage Control Central was notified?
Annotates upper right hand corner with the word s “DCC NOTIFIED” followed by the authorizing officer’s initials.
-
Engineering Management and Administration
112. Instructions for the disposal of shipboard records are published in what reference?
Part III of Disposal of Navy and Marine Corps Records, SECNAVINST 5212.2 series
-
Engineering Management and Administration
113. What document lists divisional assignments such as Sea and Anchor Detail, Berthing, Rack assignments?
Watch Quarter And Station (WQS) bill.
-
Engineering Management and Administration
114. Who is responsible for monitoring the effectiveness of the watch quarter and station bill?
Division Officer.
- Engineering Management and Administration
- 001: What Doctrine is used to combat class “B” fires in propulsion spaces?
Ship’s Main Space Doctrine (MSFD).
-
Engineering Management and Administration
002: All environmental quality issues are contained in what instruction?
OPNAVINST 5090.1 series.
-
Engineering Management and Administration
003: If a hazardous material spill causes fatalities or excessive damage what Naval Message must be sent?
OPREP-3
-
Engineering Management and Administration
004: Where should a hazardous material spill be logged?
In the Engineering Log and Deck Log.
-
Engineering Management and Administration
005: Oil spill reporting procedures can be found in what instruction?
OPNAVINST 5090.1 series.
-
Engineering Management and Administration
006: During a ship’s phased maintenance availability an EOSS verification will be scheduled when?
Approximately 4 weeks prior to the ending of the availability .
-
Engineering Management and Administration
007: Where are emergent EOSS feedback reports sent?
To NAVWARCENSSES.
-
Engineering Management and Administration
008: Who authorizes preliminary pen and ink changes to EOSS?
Commanding Officer.
-
Engineering Management and Administration
009: Full power and economy trials are conducted IAW what instruction?
OPNAVINST 9094.1 series.
-
Engineering Management and Administration
010: All full power trials must be accomplished with what percentage of liquid load on board?
75%
-
Engineering Management and Administration
011: What detrimental effect s could occur to the propulsion plant if the full power trial is conducted in shallow water?
Excessive vibration, loss of speed and overloading of the propulsion plant.
-
Engineering Management and Administration
012: During a full power trial, propulsion plant readings are taken at what interval?
Every 15 minutes.
-
Engineering Management and Administration
013: What type of inspection is required when the propulsion plant has been idle for in excess of 120 days?
Light-Off Examination (LOE).
-
Engineering Management and Administration
014: Who normally conducts a Light-Off Examination?
Propulsion Examination Board (PEB).
-
Engineering Management and Administration
015: Who does the Board of Inspection and Survey report its finding to?
Chief Of Naval Operation (CNO)
-
Engineering Management and Administration
016: The INSERV material inspection is conducted on all ships at what interval?
Every three years.
-
Engineering Management and Administration
017: After INSERV conduct a survey ordered by the CNO to determine a vessel’s fitness for further duty an option of the findings is sent to whom?
The secretary of the Navy.
-
Engineering Management and Administration
018: EOSS was established by what directive?
OPNAVINST 9200.1 series.
-
Engineering Management and Administration
019: What pollution control act enacted in 1961 prohibits the discharge of oil or oily mixtures, such as ballast, within a prohibited zone established by any nation, and those zones range from 50 to 150 miles seaward to the nearest land?
The Oil Pollution Control Act of 1961.
-
Engineering Management and Administration
020: What pollution control act deals specifically with waters in the contiguous 12 miles zone?
The Water Quality Improvement Act of 1979.
-
Engineering Management and Administration
021: What NSTM specifically deals with pollution abatement?
NSTM 593.
-
Engineering Management and Administration
022: CHT is allowed to be discharged to the sea at what distance from land?
3 miles or more from land.
-
Engineering Management and Administration
023: what is the contiguous zone?
12 miles from the baseline from which the territorial sea is measured.
-
Engineering Management and Administration
024: All oil spills that produce a visible sheen in the Unite3d States navigable waters and the contiguous zone must be reported immediately to whom?
Commander of local Coast Guard District.
-
Engineering Management and Administration
025: What instruction outlines the provisions of the Federal law that deals with oil pollution?
OPNAVINST 5090.1 series.
-
Engineering Management and Administration
026: Who is responsible for coordinating the QA training program?
Quality Assurance Officer
-
Engineering Management and Administration
027: When dealing with quality assurance, what does the acronym CWP means?
Controlled Work Package.
-
Engineering Management and Administration
028: What publication is used for all QA matters?
Joint Fleet Maintenance Manual, CINCLANTFLT/CINCPACFLTINT 4790.3 series.
-
Engineering Management and Administration
029: What is a Formal Work Package (FWP)?
Written instruction prepared IAW JFMM 4790.3 for used in production and repair, delineating all essential elements and guidance necessary to produce acceptable and reliable results.
-
Engineering Management and Administration
030: How are pen and ink changes made to a Formal Work Package?
By drawing a single line through the portion to be changed and entering the necessary change adjacent to that portion.
-
Engineering Management and Administration
031: Who does the craftsman notify if rework is required?
The LPO or WCS.
-
Engineering Management and Administration
032: who authorizes all rework steps in a Formal Work Package?
The Responsible Officer.
-
Engineering Management and Administration
033: Who reviews the DFS for technical accuracy and signs the DFS?
The Engineer Officer.
-
Engineering Management and Administration
034: DFSs are classified in what two groups?
Minor and major.
-
Engineering Management and Administration
035: A major DFS requires approval from whom?
TYCOM or NAVSEA
-
Engineering Management and Administration
036: What is the function of a vertical QA audit?
To determine if a specific job or task has been completed in accordance with the required specifications.
-
Engineering Management and Administration
037: what is the function of a horizontal QA audit?
To receive one specific area or part of an area to ensure compliance with the governing requirements.
-
Engineering Management and Administration
038. what is the color of a QA non-nuclear ID/ control tag?
Green tag with black lettering.
-
Engineering Management and Administration
039. A QA controlled material rejection tag is what color?
Red tag with black lettering.
-
Engineering Management and Administration
040. who signs and dates the QA controlled material rejection tag?
Division Officer.
-
Engineering Management and Administration
041. who approves the QA controlled material rejection tag?
Quality assurance officer.
-
Engineering Management and Administration
042. what form is used to report a DFS?
QA form 42
-
Engineering Management and Administration
043. in the QA process, what must be submitted when there is a lack of compliance with an authoritative document, plan procedure or instruction?
A departure from specification (DFS)
-
Engineering Management and Administration
044. what volume of the Joint Fleet maintenance Manual pertains to formal work procedures (FWP)?
Volume V.
-
Engineering Management and Administration
045. what individual is assigned the responsibility for the organization, administration, and execution of the Quality Assurance Program?
Quality Assurance Officer (QAO)
-
Engineering Management and Administration
046. what is a Formal Work Procedure used for in the QA process?
Provides the craftsman with clear, concise, and technically correct instruction for performing assigned maintenance.
-
Engineering Management and Administration
047. Formal Work Procedures can be used as a cure for what type of work package?
Controlled Work Package (CWP)
-
Engineering Management and Administration
048. when is a Controlled Work Package required?
Dependent on the level of essentially of the system (level I) or when extensive and formal QA or test requirement exist.
-
Engineering Management and Administration
049. what type of QA package is required when troubleshooting and repairing diesel engine?
Formal Work Package (FWP)
-
Engineering Management and Administration
050. who is responsible for preparing a QA Formal Work Procedures?
Division Leading Petty Officer (LPO)
-
Engineering Management and Administration
051. who approves the Formal Work Procedures?
Department Head.
-
Engineering Management and Administration
052. Who approves pen and ink changes to the Formal Work Procedures?
LPO or Division Officer for the affected step in the FWP
-
Engineering Management and Administration
053. rework on a Formal Work Procedure is approved by whom?
Division Officer responsible for the work.
-
Engineering Management and Administration
054. Annual QA audits are conducted by whom?
Immediate Superior in Command (ISIC)
-
Engineering Management and Administration
055. Aboard ship who is responsible for maintaining the DFS file?
Quality Assurance Officer.
-
Engineering Management and Administration
056. what three systems and boundaries aboard conventional surface ship are designated Level I?
Gaseous oxygen system above 100 PSIG with the exception of diver’s surface supplied oxygen system and recompression. 2) Liquid Oxygen and liquid nitrogen (O2N2) piping. 3) Main steam and catapult steam system piping and all branch piping exceeding 775 degrees F.
-
Engineering Management and Administration
057. what are two types of QA audits?
Horizontal and vertical.
-
Engineering Management and Administration
058. What type of QA audit is concentrated on one specific area or part to ensure compliance?
Horizontal
-
Engineering Management and Administration
059. what type of QA audit is conducted to ensure a task was completed correctly IAW specifications?
Vertical.
-
Engineering Management and Administration
060. QA Form-14 is used for what?
Conducting QA audits.
-
Engineering Management and Administration
061. when conducting hydrostatic testing what QA form is used?
QA form-26
-
Engineering Management and Administration
062. what document is used to provide a report of testing and inspecting when not covered by other QA forms?
QA form -17
-
Engineering Management and Administration
063. who conducts final contract trials?
INSURV.
-
Engineering Management and Administration
064. Ship’s equipped with an automatic data/bell logger are required to maintain an Engineer’s bell book under what circumstances?
When the automatic bell logger is inoperable.
-
Engineering Management and Administration
065. legal records are disposed of IAW what Instruction?
SECNAVINST 5212.5 series.
-
Engineering Management and Administration
066. in machinery spaces where no EOOW is stationed, engineer’s bell book must be signed by whom?
Senior Petty Officer of the Watch.
-
Engineering Management and Administration
067. after a shipyard overhaul ships are normally allotted how much time before conducting full power and economy trials?
1 month.
-
Engineering Management and Administration
068. When can AFFF be discharged to the sea?
Upon reaching 12 miles from land
-
Engineering Management and Administration
069.what document is used as an information and management tool during a routine waste heat boiler inspection?
BIRMIS report
-
Engineering Management and Administration
070. the BIRMIS report contains how many sections?
Three
-
Engineering Management and Administration
071. when is the Steam Plant Water Treatment Log Package Compiled?
Monthly.
-
Engineering Management and Administration
072. The Steam Plant Water Treatment Log Package contains what enclosures?
Auxiliary boiler chemistry worked sheet log, fee water chemistry worksheet log, cover sheet, Data Sheet and Chemical Log.
-
Engineering Management and Administration
073. who reviews and initials the auxiliary boiler water chemistry worksheet log daily?
LCPO and MPA.
-
Engineering Management and Administration
074. who reviews and signs the auxiliary boiler water chemistry worksheet log?
-
-
Engineering Management and Administration
075. after the Engineering Officer signs the Steam Plant Water Treatment Log Package it is signed by whom?
Commanding Officer.
-
Engineering Management and Administration
076. on what log are chemical test and salinity indicator comparision result logged?
Auxiliary/waste heat fee water chemistry worksheet log.
-
Engineering Management and Administration
077. how long is the steam plant water treatment log package retained onboard?
2 years
-
Engineering Management and Administration
078. who initials and out of limits reading on the auxiliary feedwater chemistry worksheet log?
The EOOW and Engineering Officer
-
Engineering Management and Administration
079. the setting of the boiler safety valves is recorded on which log?
The Auxiliary Boiler Chemistry Worksheet Log.
-
Engineering Management and Administration
080. all diesel inspections are conducted IAW directives?
OPNAVINST 9233.1 and the U.S Navy Diesel Engine Inspector Hand Book part. 1
-
Engineering Management and Administration
081. how long are diesel inspection reports retained onboard?
10 years or until a major diesel engine overhaul.
-
Engineering Management and Administration
082. what program is used to determine optimum performance?
Diesel trend Analysis Program.
-
Engineering Management and Administration
083. what report is submitted daily to the Commanding Officer and indicates the amount of fuel oil and water on hand as of midnight?
Fuel And Water Report.
-
Engineering Management and Administration
084. how long is the Fuel and Water Report required to be retained on board?
30 days.
-
Engineering Management and Administration
085. Diesel generator trend analysis are conducted at what minimum generator load?
80 percent.
-
Engineering Management and Administration
086. what type of lube oil analysis allows you to determine the extent or wear in internal combustion engines?
Spectrometric oil analysis.
-
Engineering Management and Administration
087. The term CASREP means what?
Casualty report
-
Engineering Management and Administration
088. what category of CASREP would be sent when the ship can no longer complete its mission?
Category four (C-4)
-
Engineering Management and Administration
089. all CASREPs are drafted using what publication?
NWP-10
-
Engineering Management and Administration
090. what condition of readiness is Wartime steaming?
III
-
Engineering Management and Administration
091. What condition of readiness is peacetime steaming?
IV
-
Engineering Management and Administration
092. When a ship is inport and the engineering plant is in a cold iron status, what readiness condition will be set?
Condition V
-
Engineering Management and Administration
093. Condition of readiness V is normally set when?
Inport.
-
Engineering Management and Administration
094. what condition of readiness provides the ship with best survivality during battle?
Condition I.
-
Engineering Management and Administration
095. What material condition of readiness is set during Condition I?
Zebra.
-
Engineering Management and Administration
096. What is the highest readiness condition?
Condition 1 , General Quarters.
-
Engineering Management and Administration
097. What document is used by the Division Officer to track watchstation requirements at different condition of readiness?
Watch quarter and station (WQS) bill.
-
Engineering Management and Administration
098. Using Navy Standard DC symbology what does T mean?
Communication Lost.
-
Engineering Management and Administration
099.Using Navy Standard Symbology what does FB mean?
Fire Boundaries set.
-
Engineering Management and Administration
100. what sound powered phone circuit is used as the DC stability circuit?
2JZ
-
Engineering Management and Administration
101. what sound powered phone circuit is the Captains battle circuit?
JA
-
Engineering Management and Administration
102. During engineering casualty control drills, what sound powered phone circuit does the EOOW use to effectively control the engineering room?
2JV
-
Engineering Management and Administration
103. What MC is designated as machinery control?
26MC.
-
Engineering Management and Administration
104. What alarm overrides all other shipboard alarms?
General Alarm.
-
Engineering Management and Administration
105. What is the function of the @!MC?
To maintain communications between vital areas, OOD to EOOW, CIC, DCC.
-
Engineering Management and Administration
106. Special evolution’s and the Engineer’s orders for the night are contained in what document?
Night Orders.
-
Engineering Management and Administration
107. What publication gives instructions on preparing and use of the Engineering Log?
NSTM 090.
-
Engineering Management and Administration
108. Who reviews operating logs at the end of each watch and initials them?
The EOOW.
-
Engineering Management and Administration
109. Results of a tag-out audit are reported to whom?
Engineering Officer.
-
Engineering Management and Administration
110. why does the authorizing officer notify damage control central that a tag-out is in progress?
To ensure that Damage Control Central is fully cognizant of the extent of the tag-out and the status of the material condition of the unit to be tagged.
-
Engineering Management and Administration
111. How does the authorizing officer annotates that Damage Control Central was notified?
Annotates upper right hand corner with the word s “DCC NOTIFIED” followed by the authorizing officer’s initials.
-
Engineering Management and Administration
112. Instructions for the disposal of shipboard records are published in what reference?
Part III of Disposal of Navy and Marine Corps Records, SECNAVINST 5212.2 series
-
Engineering Management and Administration
113. What document lists divisional assignments such as Sea and Anchor Detail, Berthing, Rack assignments?
Watch Quarter And Station (WQS) bill.
-
Engineering Management and Administration
114. Who is responsible for monitoring the effectiveness of the watch quarter and station bill?
Division Officer.
|
|