LIQ EP Acronyms

  1. After Ditching
    1.P
    2.E
    3.E
    • 1. Pull liferaft release handles
    • 2. Ensure pax have exited
    • 3. Exit through aft/center escape hatch and inflate life vest
  2. Provide
    1.F
    2.F
    3.W
    • 1. Flashlight
    • 2.firstaid kit
    • 3. water
  3. Ditching Imminent (10 min left)
    1.T
    2. C
    3. E
    4. F
    5. N
    Two Cunts Eat Fuckin Newbies
    • 1. turn on all emerg exit lights
    • 2. Check pax (behind cargo if poss)
    • 3. Extend emerg escape rope to nearest pax
    • 4. Fasten safety belt
    • 5. Notify Pilot-- Cabin Secure
  4. First action
    1.
    2.
    3.
    4.
    5.
    6.
    Arkansas Bitches Just Can't Suck Cock.
    • 1. Acknowledge pilots order
    • 2. Brief Pax
    • 3. Jettison cargo as directed by pilot
    • 4. Cose all doors and hatches, remove and stow overhead hatches
    • 5. secure loose articles
    • 6. Don anti-exposure suit and life vest
  5. Ramp Pallet cargo jettison
    1.
    2.
    3.
    4.
    5.
    6.
    7.
    RO2LNPN "Roll Over 2 LPNs Now
    • 1. remove cargo restraint
    • 2. open aft cargo door from ramp control pannel
    • 3. station one crewmember at each ramp manual emerg release handles
    • 4. lower ramp from ramp control pannel
    • 5. notify pilot when ready
    • 6. pull left and right emerg release handles at command to jettison
    • 7. notify pilot when clear or condition
  6. Jettison on cargo floor
    1.
    2.
    3.
    4.
    5.
    6.
    7.
    RPN PUNS
    • 1. remove all cargo restraint from the floor
    • 2. procede to master controls
    • 3. notify pilot when ready
    • 4. pull RH to Emerg
    • 5. Unlock using SEQ lock on command
    • 6. Notify pilot when clear or condition
    • 7. Subsequent pallets may be jettisoned by repeating steps 5 and 6
  7. Ramp locks Fail (part 1)
    1. check
    2. Find
    off
    • 1. check fluid level in AUX pump
    • 2. If low, attempt to find and isolate leak
    • 3. if level is normal, turn off
  8. Ramp Locks fail (part 2)
    6.rotate
    7. on
    8.off
    9. rotate--on
    10. GTG- pos 6
    11. repeat
    12. last effort
    • 6. clockwise to pos 4
    • 7. on and ensure ramp is closed
    • 8. turn off
    • 9. rotate to 5 and turn on
    • 10. visually check locks, door warning light, aux pump off rotate to 6, continue
    • 11. 6-9 with 4100 PSI
    • 12. Still fails, Aux pump off, to pos 4, Aux pump on for remainder of flight
  9. Gear up Landing
    (SJFJC POT DE
    2.
    3.
    5.
    6.
    8.
    10.
    12.
    17.
    • 2. stow
    • 3. jettison flares
    • 5. Jettison Cargo
    • 6. Pax behind cargo
    • 8. Open hatches and paratroop doors
    • 10. Elec equip
    • 12. Don Helmet...
    • 17.Evac
  10. Landing with Nose gear retracted
    C JF SO EH
    2.
    3.
    4.
    6.
    8.
    10.
    17.
    • 2. Move cargo and PAX
    • 3. Jettison Flares
    • 4. Stow or secure loose equip
    • 6. Open hatches and paratroop doors
    • 8. Elec equipment
    • 10. Helmet
    • 17. Evac
  11. Compairing 2 landings
    Nose Gear up No gear at all
    2. 2.
    3. 3.
    4. 5.
    6. 6.
    8. 8.
    10 10.
    17 12.
    17.
    • 2.move cargo 2. secure equip
    • 3. Flares 3. Flares
    • 4. Secure equip 5. Jettison cargo
    • 6. Hatches 6. PAX behind cargo
    • 8. Elec equip 8. Hatches
    • 10. helmet 10.elec equip
    • 17. evac 12. helmet
    • 17. evac
Author
ian.nims
ID
74456
Card Set
LIQ EP Acronyms
Description
Acronyms to remember
Updated