Environmental Controls
Set (RS)
-
DC Generator Voltages
- Checked (LS)
- - should be 28.25 +- 0.8 V
-
Inverters
- ON (PF)
- - either inverter on: check all AC buses powered, respective INVERTER OUT and INST INV out extinguished
-
AC Voltages and Frequencies
- Checked (LS)
- Freq: 400 +- 6
- Voltage 114 +- 7
-
-
** HOLD THE CHECKLIST
"hold the checklist, keep right side clear during all ground operations"
- Pilot Brake Check
- CP call base on VHF
- "Montana base, Montana 4XX out of the chocks"
-
** CONTINUE THE CHECKLIST
-
Transfer Pumps
- Checked/Auto (LS)
- - Use transfer test switch L or R and move Transfer pump swith from OFF to AUTO
- - should see momentary flash of LH/RH no FX trans
-
Crossfeed
- Checked/Auto (LS)
- a. crossfeed auto
- b. left boost pump OFF
- c. left boost pump ON
- d. Crossfeed CLOSED, then AUTO
- e. Right Boost pump- OFF
- f. Right Boost pump - ON
- g. crossfeed Closed, then AUTO
-
Generator Load
- Checked (LS)
- - ensure N1 rpm is enough to support generator load
- - check load is <0.5
-
-
**HOLD THE CHECKLIST
Copy ATIS (UHF1), put cleearance on request, request taxi to run up
- Power levers into reverse to verify operation, back to Beta (ensure symmetric ENGINE spool up)
- - check CP brakes
-
-
Turn Indicators/Compasses
- Checked (PF, PM)
- - "check needle left, ball right, mark heading XXX"
- - "Needle Left, ball right, mark heading XXX"
-
|
|