  1. Test equipment calibration service is organizational-level maintenance and is funded with ______________ funds?
    AFC-30 (Page 14 in PDF)
  2. What list is used to identify SCAT coded test equipment required for maintenance not captured in the CG planned maintenance system (PMS) and this equipment is generally used for troubleshooting or corrective maintenance?
    Fleet Supplemental Test Equipment Requirements (FSTER) (Page 15 in PDF)
  3. What contains the established allowance of TMDE for the respective unit?
    The Ship/Shore Portable Electrical/Electronic Test Equipment Requirements List (SPETERL) (Page 16 in PDF)
  4. Which type of Test Equipment should be stored separately from GPETE and SPETE?
    FSTER (Page 16 in PDF)
  5. What is the only SPETE?
    UPM -155 IFF Test Set (Page 16 in PDF)
  6. The contents of a SPETERL contains what 5 sections?
    • Section 1 – SPETERL Reports
    • Section 2 – Prime System Summary
    • Section 3 – SCAT Inventory Summary
    • Section 4 – SPETE Requirements List
    • Section 5 – Prime Systems and FSTERs with Supporting SCAT Codes (Page 17 in PDF)
  7. Test equipment is classified in the SPETERL by what code used to identify a range of measurements by functional category of test equipment?
    A four-digit subcategory (SCAT) code (Page 17 in PDF)
  8. The ___________ code represents a service and support category of the test equipment.
    PRI code (Page 17 in PDF)
  9. When the TMDE program receives a validation report from a unit with a priority of _________ or __________ (obsolete or nearing the end of service life), the program will attempt to upgrade the equipment to a newer model if one is available within the test equipment loan pool.
    72 or 95 (Page 17 in PDF)
  10. True or False; Items not listed on a unit SPETERL will not receive any support services within the CGETEP until they add via update or approved ACR to the unit SPETERL in the FISTER list.
    True (Page 18 in PDF)
  11. Which type of test equipment shall have a label affixed stating “FOR TROUBLESHOOTING ONLY”?
    FSTER (Page 18 in PDF)
  12. GPETE and SPETE shall be stored separately from ___________ and ________ test equipment in order to eliminate the possibility of using unapproved test equipment to conduct CG planned maintenance.
    FSTER and NON-SCAT coded (Page 18 in PDF)
  13. Test Equipment calibration is organizational level maintenance and is _______ funded.
    AFC-30 (Page 18 in PDF)
  14. __________ have their funds for calibration provided by C4ITSC-FSD?
    ESD’s (Page 18 in PDF)
  15. All equipment found to be out of calibration must be removed from service, returned to the unit TEPO for re-calibration and tagged with a CG Form _____________, Serviceable/Unserviceable Material Tag.
    CG Form 5236 (Page 19 in PDF)
  16. True or False; The use of Out-of-Calibration electronics test equipment to conduct scheduled or unscheduled maintenance is prohibited without a waiver.
    True (Page 20 in PDF)
  17. All test equipment shall be tracked within __________?
    FLS (Page 20 in PDF)
  18. What is the form number for an Allowance Change Requests (ACR)?
    NAVSUP1220-2 (Page 21 in PDF)
  19. How long are Test Equipment Records retained for?
    One year or until after the applicable SPETERL validation or physical inventory count, whichever is longer (Page 21 in PDF)
  20. The field unit is responsible for reviewing the SPETERL validation package and verifying the contents within ________ weeks of receipt.
    2 weeks (Page 25 in PDF)
  21. How often shall the TEPO perform an inventory review of the SPETERL?
    At least twice annually for accuracy (The annual SPETERL Validation shall constitute one of those 2 reviews)(Page 25 in PDF)
  22. If the unit has test equipment not on the SPETERL or FSTER, the Non-SCAT coded item needs to have an approved ________ signed by the product line and CGETEP Manager on file.
    ACR (Page 26 in PDF)
  23. Who can restore and/or permanently delete a discrepancy?
    A maintenance Releaser (Page 40 in PDF)
  24. How are discrepancies for non-mission essential parts deferred on EAL/ALMIS?
    Deferred as Parts Pending (PP) (Page 49 in PDF)
  25. Discrepancies for mission essential parts are disabled and the status is changed to __________?
    NMCS (Page 49 in PDF)
  26. True or False; If an asset is disabled, the discrepancy cannot be deferred.
    True (Page 49 in PDF)
  27. True or False; The QA signoff must happen after the corrective action and prior to the Maintenance release signature.
    True (Page 63 in PDF)
  28. What are the 2 BRAVO statuses in ALMIS?
    • FMC- Fully Mission Capable
    • PMC – Partially Mission Capable (Page 66 in PDF)
  29. What are the 4 NMC statuses in ALMIS?
    • M – Unscheduled Maintenance outside of Charlie period
    • S – Supply
    • D- Charlie period is always NMCD (Patrol Boats, Cutters, Subsystems, and Cutter CBs)
    • D – Depot Maintenance (Small Boats and Patrol Boat CBs) (Page 66 in PDF)
  30. What is the status of an asset while in a Charlie period in ALMIS?
    NMCD – Not mission capable depot (Page 66 in PDF)
  31. What must be used whenever the execution of planned and scheduled maintenance renders a cutter “not mission capable”?
    NMCD (Page 71 in PDF)
  32. What are the 3 Deferred Maintenance Actions in ALMIS?
    • Parts Pending (PP)
    • Carried Forward (CF)
    • Carried Forward Depot (CFD) (Page 78 in PDF)
  33. When setting up preferences on Web Reports, on the Set preferences page, there are three tabs what are they?
    General, Personal, and Portal (Page 160 in PDF)
  34. When setting up preferences on Web Reports, which tab is able to change report formats to the default report format to HTML (default), PDF, Excel 2007, Excel 2002, Delimited text (CSV), or XML?
    General Tab (Page 160 in PDF)
  35. With what new system, tabs can be added, removed, and reordered on the Home page?
    Cognos 10 (Page 161 in PDF)
  36. On the Home Page what are the two default tabs?
    ALMIS tab and the My Folders tab (Page 161 in PDF)
  37. What is a collection of predetermined operational and engineering reports/cubes that display on the associated tab?
    Unit Dashboard (Page 161 in PDF)
  38. What can be viewed in HTML, PDF, XML, or any of three Excel formats?
    Web Reports (Page 174 in PDF)
  39. True or False; Web Reports can be scheduled to run at a later time or at a recurring date and time?
    True (Page 188 in PDF)
  40. What can be enabled on web reports that have been saved in HTML format, provides notification with a new version is available?
    An Alert (Page 200 in PDF)
  41. What rules control when users are notified about the availability of new report versions?
    Watch Rules (Page 204 in PDF)
  42. A ____________ is a file comprised of a specific data type that is displayed across multiple dimensions and levels.
    A PowerPlay Cube (Page 226 in PDF)
  43. The _______________ Cube contains data comprised of time dimensions (years) and unit dimensions (stations and assets).
    Asset Utilization Cube (Page 226 in PDF)
  44. The Asset Utilization Cube, when filtered, each dimension can be displayed at levels ranging from a __________ view (general information) to a __________ view (specific information)
    Macro; Micro (Page 226 in PDF)
  45. The Asset Utilization Cube at its __________ level will display the total number of resource hours, missions, sorties, etc., at each station for the period of time being displayed.
    Macro Level (Page 226 in PDF)
  46. The Asset Utilization Cube filtered to the ________ level could display the specific asset as a unit, the specific resource hours, missions, sorties, etc., for a specific period of time.
    Micro Level (Page 226 in PDF)
  47. The DSS __________ provides a visual display of how the PowerPlay Cubes are arranged in DSS.
    Site Map (Page 228 in PDF)
  48. Once the approved Engineering Change is received from ________________________, the TCTO process begins?
    Surface Forces Configuration Control Board (SFCCB) (Page 8 in PDF)
  49. The status of the Engineering Change in SFLC Central Projects shall be changed from Development to Deployment by who?
    PL Engineering Branch (Page 8 in PDF)
  50. Who will not use the TCTO process to release an EC until parts are available?
    Product Line Manager (PLM) (Page 8 in PDF)
  51. Once sufficient parts are on hand for field implementation, the TCTO shall undergo preparation for release in Asset Computerized Maintenance System (ACMS) for what type of unit?
    Modernized unit (Page 8 in PDF)
  52. Once sufficient parts are on hand for field implementation, the TCTO shall undergo preparation for field promulgation by message or population in Fleet Logistics System for what type of unit?
    Non-Modernized units (Page 8 in PDF)
  53. For modernized assets the TCTO is added to the Maintenance Requirements List (MRL) in ACMS, by who?
    SFLC PL (Page 9 in PDF)
  54. For a modernized asset, the TCTO shall become active and readily visible to field units when it’s added to what?
    MRL (Page 9 in PDF)
  55. When a TCTO is completed on a modernized asset the installing entity shall complete coversheet and submit it to who?
    Field Terminal Operator (FTO) (Page 9 in PDF)
  56. Once the TCTO has been completed on a NON-MODERNIZED asset, the installing activity shall ensure what 2 documents have to be submitted?
    TCTO coversheet and the OPNAV 4790/CK (Page 9 in PDF)
  57. Once the TCTO has been completed on a NON-MODERNIZED asset, the installing activity shall submit the coversheets to who?
    SFLC PL Configuration Data Manager (CDM)
  58. How do NON-MODERNIZED units track TCTO completion?
    SFLC Central and FLS (Page 9 in PDF)
  59. Who can add, void, cancel, or modify records at any point in the TCTO process?
    Only ESD and Survivability and Sustainment Branch (SSB) (Page 10 in PDF)
  60. How are TCTO’s tracked?
    TCTO’s are tracked by the Asset Computerized Maintenance System (ACMS) code (Page 10 in PDF)
  61. How many characters do a TCTO ACMS code contain?
    6 characters (Page 10 in PDF)
  62. A TCTO is tracked by the ACMS code; the first character of the code is _____________ for TCTO’s?
    “T” (Page 10 in PDF)
  63. For TCTO “UTB-41 TB1003” what does the B1 indicate?
    These characters indicate the applicable S1000D chapter based on the equipment affected (Page 10 in PDF)
  64. What is the 6th character of the TCTO ACMS code?
    Revision number (Page 10 in PDF)
  65. What is the third revision of the TCTO UTB-41 TB1000?
    Its TCTO UTB-41 TB1003 (Page 10 in PDF)
  66. If a unit fails to complete the maintenance within the deadline issued within the TCTO, the item shall show up on what web report?
    Unit’s Overdue Maintenance List (page 10 in PDF)
  67. What are used for rapid dissemination of time-critical maintenance actions, time-critical inspections and operational configuration changes that are of an urgent nature due to safety or immediate operational needs and are not appropriate for complex changes with many design and logistics elements since this process bypasses key portions of the EC development process that are intended to address these elements?
    Message TCTOs (page 12 in PDF)
  68. Assets shall complete the Message TCTO and forward the TCTO cover sheet to who?
    SFLC PL (Page 13 in PDF)
  69. For Modernized Units, Message TCTO completion is automatically tracked through what?
    ACMS (Page 13 in PDF)
  70. Once the unit completes the change, the TCTO cover sheet shall be forwarded to who for close out and removed from the MDL?
    FTO (page 13 in PDF)
  71. What Process Guide standardizes the process of preparing for and executing C4IT depot-level maintenance work during dry-dock and dock-side availabilities of Coast Guard cutters and boats, and ensures alignment with the naval engineering processes that drive the majority of the work during such availabilities?
    C4IT Depot Level Maintenance During Dry-dock/Dock-side Availabilities (Page 7 in PDF)
  72. What are asset depot maintenance projects?
    Dry-dock/Dock-side Availabilities (Page 7 in PDF)
  73. Who manages and coordinated all C4IT-related depot-level maintenance actions?
    The Command, Control, Communications, Computers and Information Technology Service Center, Field Service Division (C4IT-FSD) (Page 7 in PDF)
  74. Who controls and allocates AFC-42 funds for depot-level maintenance work during cutter and boat availabilities?
    Chief of the Field Services Division of the C4IT (Page 9 in PDF)
  75. Who shall complete cutter and boat C4IT technical assessments prior to the respective Long Range Maintenance Plan (LRMP) reviews?
    Commanding Officers of ESUs (Page 9 in PDF)
  76. Who shall participate in the first and second A-Team meetings, representing all appropriate C4IT depot-level maintenance issues?
    Commanding Officers of ESUs (Page 9 in PDF)
  77. Who shall review MPCs, CFs, CSMPs, and TCTOs for cutters without assigned ETs in order to document the possible C4IT depot-level maintenance work during cutter and boat availabilities?
    ESD Supervisors (Page 10 in PDF)
  78. Timely and proper completion of the ____________ _____________ sets the stage for compiling the complete picture of the required depot-level maintenance actions for assets.
    Technical Assessments (Page 11 in PDF)
  79. A key part of what process is the collection and dissemination of information, along with active discussion, participation and contribution during the Availability?
    Planning Process (Page 11 in PDF)
  80. Planned electronics depot-level maintenance work beyond the capabilities of asset crew and supporting ESU is often performed dockside via the _________________ Task.
    Topside Maintenance Contract Task (Page 13 in PDF)
  81. C4IT FSD drafts and awards the Topside Maintenance contract task ______________?
    Annually (Page 13 in PDF)
  82. C4ITSC FSD funds ESU’s yearly for industrial work items via ________________________?
    Funds Transfer Authorization (FTA) (Page 13 in PDF)
  83. C4ITSC FSD funds labor and Government Furnished Equipment (GFE) for CG Yard availabilities via a ___________ form?
    CGY-75 Form (Page 14 in PDF)
  84. What is 110-WPB High Tempo High Maintenance (HTHM) dockside interval and dry-dock interval?
    • Dockside- 9 months
    • Dry-dock – 18 months (Page 15 in PDF)
  85. C4ITSC FSD transfers funds directly to what account of the HTHM product line (at SFLC PDM) via FTA?
    AFC-42 (Page 15 in PDF)
  86. What schedules and tracks asset preventive maintenance? It is a component of ALMIS and it is used for modernized unit maintenance.
    Asset Computerized Maintenance System (ACMS) (Page 16 in PDF)
  87. What database manages availability data from planning to closeout? It also contains all availability documents, timelines, milestones and financial information.
    Contract Workbook (Page 17 in PDF)
  88. What also contains all availability documents, timelines, milestones and financial information? It is used by SFLC PDM to manage commercial availabilities.
    Fleet Logistics System (FLS) (Page 17 in PDF)
  89. What database contains the maintenance requirements and associated funding specified for each type of asset work item? It provides details regarding scheduled work normally conducted during such availabilities for non-modernized units.
    Class Maintenance Plan (CMP) (Page 17 in PDF)
  90. What contains the maintenance requirements and associated funding specified for each type of asset work item for modernized units? It is contained in ALMIS.
    Maintenance Requirements List (MRL) (Page 17 in PDF)
  91. What plan contains cutter names and dates for planned availability maintenance? This plan shall be used by ESUs to trigger Technical Assessments, forecast travel expenditures, plan workloads, and create budget requests.
    The Five Year Maintenance Plan (Page 17 in PDF)
  92. What program is a Consolidated Support Function (CSF) and receives funds each year via the AFC-42 budget board process?
    The Dry-Dock/Dock-Side Availability Program (Page 18 in PDF)
  93. Each ESU shall submit an annual budget estimate to C4ITSC FSD that includes all of their anticipated ____________ funding needs to both manage their duties and responsibilities, and to perform the required depot-level maintenance actions.
    AFC-42 (page 18 in PDF)
  94. ESUs shall use what plan and all historic maintenance data to prepare budget estimates for the AFC-42 budget board?
    The Five-Year Maintenance Plan (Page 18 in PDF)
  95. What items are recurring maintenance work items that have been placed on a specific schedule and are the basis for the availability budget process?
    Base Items (Page 18 in PDF)
  96. What allow operations when the budget appropriation us not approved by the beginning of the fiscal year? They authorize expenditure at a percentage of previous fiscal year appropriation.
    Continuing Resolutions (Page 19 in PDF)
  97. What are normally distributed at the start of the fiscal year?
    Funds (Page 19 in PDF)
  98. Who shall fund travel related expenses for A-Team meetings?
    ESUs (Page 19 in PDF)
  99. For Inspectors during availabilities using funds provided by who?
    C4ITSC FSD (page 19 in PDF)
  100. The following CG Yard projects receive yearly from the C4IT-ALD line of accounting via what form?
    CGY-75 (Page 19 in PDF)