What is the primary distribution voltage of the basic expeditionary airfield resources (BEAR) electrical system?
B) 4,160 VAC.
What is the output of the 750-kW, mission essential power (MEP)-12 generator in a basic expeditionary airfield resources (BEAR) package?
D) Three-phase, 4,160 volts.
What type of cable termination is used for the primary switching center (PSC) connections?
B) Load-break elbows.
Which way point is used to tie two primary switching centers (PSC) together?
C) 6.
When connecting two primary switching centers (PCS) together using 500 MCM copper cable, what is required to make the connection?
B) 600 amp deadbreak.
What is used to compensate for voltage drop in a secondary distribution center (SDC)?
B) Tap changes.
What is the conductor size and insulation value of the basic expeditionary airfield resources (BEAR) high-voltage electrical cable?
A) #1/0, 5 kV.
You should bury primary cables to a depth of at least...
D) 18 inches.
How many ways on the primary switching center (PSC) have load interrupter switches?
D) 2.
Before performing maintenance on the secondary distribution center (SDC) you...
D) ensure all power is removed.
What is the mostly likely problem when there is no power to any of the outbound primary distribution center feeders?
C) Power source failure.
The recommended distance for secondary runs from the secondary distribution center (SDC) is not to exceed...
D) 800 feet.
What basic expeditionary airfield resources (BEAR) asset is used as the main distribution point for secondary circuits?
D) Secondary distribution center (SDC).
How many 120/208 volts alternating current output circuits can the secondary distribution center (SDC) provide?
A) 16.
Which power distribution panel is associated with the tent extendible modular personnel (TEMPER) tent?
B) 25 kW.
What cable size is used to connect the low-voltage mission essential power generator to the secondary distribution center (SDC)?
C) 25-foot, 200-amp.
How do you deenergize the transformer windings of one secondary distribution center (SDC) without deenergizing any of the interconnected SDCs?
B) Pull the three fused disconnects in the high-voltage compartment.
What can you do to ground the system if the ground rod cannot be driven into the earth during deployments to locations where low voltage will be used for a short time?
B) Bury the ground rod in a horizontal trench that is 18 inches deep.
What mixture of salt and water normally increases the conductivity of the soil that is in contact with a ground rod?
D) 3 pounds of salt per 1 gallon of water.
How many light streamers are installed in each tent?
A) 1.
When dissembling the tent lighting assets, where do you store the components?
D) In the proper storage containers.
What is the next step in installing strobe lights after you ground the series circuit adapter and master strobe?
C) Discharge the capacitors.
What is the TAG's first step in installing the strobe units?
C) Position the strobe master unit so that its window faces away from the runway.
What is the next step after the TAG installs the 1000 foot crossbar?
C) Install the approach lights.
What is the final step in installing the runway edge lights?
B) Anchor each light fixture with two ballast rings or one stake.
What do you do first when leveling and aiming a precision approach path indicator (PAPI) unit?
A) Level the unit from side to side by adjusting the unit's two front knobs.
What is the final step in installation of the precision approach path indicator (PAPI) units?
A) Adjust the tilt switch so that the bubble is in the middle.
How do you begin the procedure for installing the emergency airfield lighting system obstruction lights?
C) Install the batteries into the fixture.
What generator is used for emergency backup of facilities that are mission essential, such as communications centers and command posts?
D) MEP 806A.
Besides conductor size, what is another important factor to consider when reducing voltage drop in an electrical circuit?
A) Circuit distance.
You have a #8 AWG stranded copper conductor with 0.778 ohms of resistance for each 1,000 feet of length. If you run that cabling 100 feet between the power plant and the load, the total resistance would be...