-
10-75 (Peaked Roof) "Can" Responsibilities
- On Fire Floor
- Monitor fire floor conditions and ensure continuous operation and advancement of the line.
-
10-75 (Peaked Roof) "Irons" Responsibilities
- Floor Above Team
- Tool = May bring 6' Hook
- Ladder if necessary, Floor above via exterior
-
10-75 (Peaked Roof PD) "Hook" Responsibilities
- Floor Above Team
- Ladder if necessary, Floor above via exterior
-
10-75 (Peaked Roof) "Roof" Responsibilities
- Attic or Floor Above Team
- Tool = LSR or PD Rope
- LSR or PD Rope
-
10-75 (Peaked Roof) "Chauffeur" Responsibilities
- Fire Floor
- Check rear and rear entry, ladder if necessary, Proceed to Fire Floor
-
10-75 (Flat Roof PD) "Can" Responsibilities
Monitor fire floor conditions and ensure continuous operation and advancement of line.
-
10-75 (Peaked Roof PD) "Irons" Responsibilities
- Floor Above Team
- Ladder if necessary Floor above via exterior
-
10-75 (Peaked Roof PD) "Hook" Responsibilities
- Floor Above Team
- Ladder if necessary Floor Above via exterior
-
10-75 (Peaked Roof) "Roof" Responsibilities
- Go to Roof
- Tool = Saw to the Roof. If top floor
- Assist first due companies on roof, any necessary roof communications, possibly operate on exposures.
-
10-75 (Peaked Roof) "Chauffeur" Responsibilities
- Fire Floor unless top floor fire, then to the roof
- Tool = LSR or PD Rope to the roof if top floor
- Check rear, Proceed to Fire Floor. If top floor then saw to Roof and assist Roofman. Ladder if necessary.
-
10-75 H-Type/OLT/NLT "Can" Responsibilities
- Fire Floor
- Tool = Hydra Ram
- Monitor fire floor conditions and ensure continuous operation and advancement of line
-
10-75 H-Type/OLT/NLT "Irons" Responsibilities
- Floor Above Team
- Tool = Hydra Ram
- Searches floor and fire extension on floor above.
-
10-75 H-Type/OLT/NLT "Hook" Responsibilities
- Floor Above Team
- Tool = Thermal Imaging Camera
- Searches and fire extensions on floor above
-
10-75 H-Type/OLT/NLT "Roof" Responsibilities
- Tool = LSR
- Assist 1 st Due Units with Roof ops, Make any necessary communications, May Drop down after duties complete* Top floor; coordinate with chauffeur (May bring saw)
-
10-75 H-Type/OLT/NLT "Chauffeur" Responsibilities
- Stairwells to Roof
- Tool = Saw if necessary
- Fire Floor unless needed elsewhere, For top floor fires- saw to the roof (Coordinate with Roofman)
-
10-75 (Mixed Occupancy - Dwelling above) "Can" Responsibilities
- Fire Floor with nozzel
- Tool = Search Rope if in store or cellar Consider 10' Hook
- Monitor fire floor conditions and ensure continuous operation and advancement of line
-
10-75 (Mixed Occupancy - Dwelling above) "Irons" Responsibilities
- Floor Above or Exposures
- Tool = Hydra Ram, FE Saw
- For fire in store - Floor above. Otherwise Exposures.
-
10-75 (Mixed Occupancy - Dwelling above) "Hook" Responsibilities
- Floor Above or Exposures
- Consider 10' Hook if in store
- For fire in store - Floor Above or Exposures (Depending on size-up or orders)
-
10-75 (Mixed Occupancy - Dwelling above) "Roof" Responsibilities
- Tool = LSR
- For fire in store - Floor Above or Exposures (Depending on size-up or orders)
-
10-75 (Mixed Occupancy - Dwelling above) "Chauffeur" Responsibilities
- Fire Floor
- Tool = Saw
- Saw to Roof if top floor, Check Rear, Possibly back up Can.
-
10-75 Taxpayers/ Commercial "Can" Responsibilities
- Fire Floor to the line
- Tool = Search Rope
- Monitor conditions on the fire floor, Ensure continuous operation and advancement of line
-
10-75 Taxpayers/ Commercial "Irons" Responsibilities
- Exposures and Rear
- Tool = FE Saw, Maul,Halligan
-
10-75 Taxpayers/ Commercial "Hook" Responsibilities
- Exposures and Rear
- Tool = Search Rope,Consider 2nd FE Saw
-
10-75 Taxpayers/ Commercial "Roof" Responsibilities
- Tool = Saw
- Assist first due companies, Check Rear from Roof, give any necessary Roof reports
-
10-75 Taxpayers/ Commercial "chauffeur" Responsibilities
- Area where most needed; ie Rear exposure or assist Roof ops
- Tool = LSR to front of building
- Assist where most needed
-
10-77 (High Rise MD's) "Can" Responsibilities
- Fire Floor
- Hydra Ram
- Monitor fire floor conditions and ensure continuous operation and advancement of line, If deploying blanket, Floor below
-
10-77 (High Rise MD's) "Irons" Responsibilities
- Floor Above Team
- Tool = Hydra Ram
- Searches on floor above, Bring blanket to floor above and deploy if ordered
-
10-77 (High Rise MD's) "Hook" Responsibilities
- Floor Above Team
- Tool = Search Rope
- Searches on floor above, Bring blanket to floor above and deploy if ordered
-
10-77 (High Rise MD's) "Roof" Responsibilities
- Floor Above Team
- Tool = LSR
- Rope Rescues if necessary, Searches on floor above. Team up with Hook and Irons to deploy blanket if necessary.
-
10-77 (High Rise MD's) "Chauffeur" Responsibilities
- Stairwells to Roof
- Tool = Fire Blanket to Command Post
- Stairwells and Bulkhead enroute to the roof via evacuation stairwell, Check Attack stairway bulkhead, Check elevators, Proceed to Fire Floor, If deploying blanket, floor below.
-
10-76 (Highrise Commercial) "Can" Responsibilities
- Tool = Search Rope, Hydra Ram.
- Monitor fire floor conditions and ensure continuous operation and advancement of line.
-
10-76 (Highrise Commercial) "Irons" Responsibilities
- Tool = Hydra Ram
- Searches on floor above, Bring blanket to floor above and deploy if ordered
-
10-76 (Highrise Commercial) "Hook" Responsibilities
- Floor Above Team
- Tool = Search Rope
- Searches on floor above, Bring blanket to floor above and deploy if ordered
-
10-76 (Highrise Commercial) "Roof" Responsibilities
- Floor Above Team
- Tool = LSR
- Rope Rescue if necessary, Searches on floor above
-
10-76 (Highrise Commercial) "Chauffeur" Responsibilities
- Stairwells to Roof
- Stairwells and Bulkhead enroute to the roof via evacuation stairwell, Check Attack stairway bulkhead, Check elevators, Proceed to Fire Floor.
-
High Angle "Can" Responsibilities
- Entry 1
- High Angle Harness, Helmet, Trauma Bag
- Victim Access, Assessment and Packaging for Removal.
-
High Angle "Irons" Responsibilities
- Entry 2
- High Angle Harness, Helmet, Main Line
- Victim Disentanglement and Packaging
-
High Angle "Hook" Responsibilities
- Rigger
- 4:1 M/A Bag
- Rigging Access/Egress with ropes, Set up and if necessary, Operate Main Line
-
High Angle "Roof" Responsibilities
- Safety
- Tool = Safety Bag
- Assist Rigger in Set-up of Safety line, Double check edge protection, carabiners, high points, Operate safety line
-
High Angle "Chauffeur" Responsibilities
- Edgeman
- Gear Bag, Stokes, Backboard
- Additional tools and augment operation as necessary.
-
Collapse "Can" Responsibilities
- Entry 1
- Trauma Bag if needed, Hook Halligan
- Victim care if needed, If none then assist entry 2
-
Collapse "Irons" Responsibilities
- Entry 2
- Collapse Bag, Halligan, Sawzall
- Assess structural damage, Determine and measure for necessary shoring
-
Collapse "Hook" Responsibilities
- Collapse scene/cut station
- Air Nailer, Nails, Trim Saw, Air Source to Entry Team
-
Collapse "Roof" Responsibilities
- Cut Station
- Saw Horses, Lumber
- Establish cut station
-
Collapse "Chauffeur" Responsibilities
- Cut Station
- Carpentry bag, 10" Circular saw, Extension cord
- Establish cut station, Access Electricity source as necessary.
-
Confined Space "Can" Responsibilities
- Entry 1
- High Angle Harness, Helmet, Trauma Bag, SCBA (Confined Space) Sirius Meter
- Victim Access, Assessment and Packaging for Removal
-
Confined Space "Irons" Responsibilities
- Entry 2
- High Angle Harness, Helmet, SCBA (Confined Space) Main Line
- Back up Entry 1, Victim Disengagement, Packaging and Removal
-
Confined Space "Hook" Responsibilities
- Rigger
- 4:1 M/A Bag, Stokes Basket, 2 Lengths of Air Hose
- Load up Stokes Basket with equipment and bring to within close proximity of entry to confined space
-
Confined Space "Roof" Responsibilities
- Safety
- Safety, Sked/Reeves, 2 Lengths of Air Hose
- Load up Stokes Basket with equipment and bring to within close proximity of Entry to confine space.
-
Confined Space "Chauffeur" Responsibilities
- Air Cart, (Tripod, Gear Bag, 2 Lengths of hose as needed)
- Set up, connect and monitor air cart (Time on air etc) Confirm lockout tagout
-
Pin Job "Can" Responsibilities
- Inside vehicle with victim
- Trauma Bag, Collar/Head bed bag
- Hand on Patient, Assess degree of entrapment and control of in-vehicle ops
-
Pin Job "Irons" Responsibilities
- At vehicle
- Halligan, Sawzall 1 st Tool
- Operate 1 st Tool, Victim Disengagement
-
Pin Job "Hook" Responsibilities
- At Vehicle
- 2nd Tool
- Power unit, spreader, Cutter & Chocks to Vehicle, start power unit, connect tool, Operate 2nd tool
-
Pin Job "Roof" Responsibilities
Power unit, spreader, cutter & chocks to Vehicle, start power unit, connect tools, Stabilize vehicle, Operate line as necessary, Add'l tool as needed
-
Pin Job "Chauffeur" Responsibilities
Stretch line if first due or if needed, Additional tools as needed.
-
Trench "Can" Responsibilities
- Entry 1
- High Angle Harness, Helmet, Trauma Bag
- Victim Access, Assessment and Packaging for Removal
-
Trench "Irons" Responsibilities
- Entry 2
- High Angle Harness, Helmet, Main Line, Air Source
- Back up Entry 1, Victim Disengagement and Packaging
-
Trench "Hook" Responsibilities
- 2nd Piece
- Get Trench Panels to trench
-
Trench "Roof" Responsibilities
- 2nd Piece
- Get Trench Pannels to trench
-
Trench "Chauffeur" Responsibilities
- Struts, Strut Regulator, Strut Bag
- Get Strut, Strut Bag and Regulator to scene and connect to air source.
-
Man Under "Can" Responsibilities
- Under Train
- Trauma Bag
- Patient care and extrication
-
Man Under "Irons" Responsibilities
- Under Train
- Paddles, Slippers & Pneumatic Bottle Jack (Space case stuff in case of space case)
- Make Train car safe (Boots, Paddles), Set up tools/cribbing for lift it necessary, Assist in patient care and extraction
-
Man Under "Hook" Responsibilities
- Train Platform near
- Air Source, Cribbing
- Prepare air source for lift, drop hose to Irons man, Platform Safety during lift
-
Man Under "Roof" Responsibilities
- Train Platform near victim
- "Man Under" Backboard, call for orange stokes from on-scene company
- Ensure orange stokes arrives at scene, Check for train safety (engage brakes on neighborhood cars) Check for placement of paddles and slippers
-
Man Under "Chauffeur" Responsibilities
- At Rig
- Assist in getting orange stokes if needed, Additional tools as needed
- Entry Entry as needed
-
Man In Machine "Can" Responsibilities
- To machine/Scene
- Trauma Bag, Halligan
- Victim Access and care
-
Man In Machine "Irons" Responsibilities
- Sawzall, Halligan
- Victim Disengagement
-
Man In Machine "Hook" Responsibilities
- Man In Machine kit
- Set up and pass in tools
-
Man In Machine "Roof" Responsibilities
- Air Source
- Run Air Source
-
Man In Machine "Chauffeur" Responsibilities
- At Apparatus
- As Necessary
- Bring up additional tools and augment operation as necessary
|
|