2023 02 Feb

  1. Dela Tekpor
    Logistics Mgr in Jabal Ali

    Image Upload 2
  2. Logistics Mgr in Jabal Ali

    Image Upload 4
    Dela Tekpor
  3. GM of SIML
    Ben Bianchi
  4. SRP plant #
    9512
  5. What do we need from OSC to import?
    A shipping invoice.  Not fiscal.
  6. why do we have to watch the re-import of LH parts so closely.
    • 1. So we don't create false demand to other suppliers.
    • 2. So other locations can't order the parts put into stock.
  7. 3 things about EZ type Liner Hanger
    • 1.  Welded.
    • 2.  No FAT.
    • 3.  Mayank suggests not to disassemble.
  8. PML
    Parametric Material Library (3MT's one stop shop)

    Emrah runs
  9. Web page that Emrah runs for 3MT
    PML
  10. Who is Nishalie?

    Image Upload 6
    Materials Manager (peer to Mona and Dela)
  11. Image Upload 8
    EZ Hanger (no seals)
  12. Image Upload 10
    Cone pads (welded on)
  13. Image Upload 12
    lower cage
  14. Image Upload 14
    Mandrel (welded cones)
  15. Image Upload 16
    Stop ring
  16. Image Upload 18
    Upper cage
  17. Deviation vs Concession
    • Deviation = planned
    • Concession = unplanned
  18. 8Ds
    • 1. Team
    • 2. Document
    • 3. Contain
    • 4. Root Cause
    • 5. Corrective actions (Identify)
    • 6. Corrective actions (Implement)
    • 7. Recurrence
    • 8. Recognize team
Author
Jared023
ID
360474
Card Set
2023 02 Feb
Description
Work
Updated