2023 01 Jan

  1. CMPU's 2 API audit findings
    • 1.  API 5CT, monogram date is only 3 digits, needs to be 4.
    • 2.  Phosphate concentration was 3.9%, needed to be 6-10%
  2. Doc guy on Mike H's team.
    Mark Lochridge
  3. Image Upload 2
    Siddharth Ramanathan, Packer PLM, CPU
  4. Packers PLM in CPU
    Siddharth Ramanathan
  5. Image Upload 4
    Sathish V.  SV Team Leader, CHPC
  6. SV Engineering team leader at CHPC
    Sathish V
  7. Image Upload 6
    Harry Minocha.  SV Engineer.
  8. Tall SV Engineer
    Harry Minocha
  9. Image Upload 8
    Charles Foster.  IV Sustaining Mgr
  10. IV Sustaining Manager
    Charles Foster
  11. AFIV
    Annulus controlled Formation Isolation Valve
  12. What about Beacon's QCP requirements at CPU?
    • SGMs.  Only review databook. 
    • Waive:
    • 1. Set out Inspection
    • 2. Test witness
  13. Control of Engineering Records
    EN-1
  14. EN-1
    Control of Engineering Records
  15. Voice of the Nation
    HR App to ask questions
  16. 3 levels of document security
    • Secret - Only project members (ie. shape charge recipe)
    • Confidential - Default.  Only GeMS
    • Private - Can be shared outside GeMS
  17. Why did CPU need a concession from Beacon? (bead blasting)
    • They bead blasted before surface NDE.
    • Small force, will not mask nonconformities.
  18. Image Upload 10
    • Elyse McKinnon
    • Reports to Mike Briggs
    • Made yammer post about internal audits.
  19. Image Upload 12
    Brandon Keith.  Inspection Supervisor.
  20. Image Upload 14
    Ball Catch Landing Collar
  21. Image Upload 16
    Ball seat
  22. Image Upload 18
    Ball
  23. Image Upload 20
    Housing
  24. Image Upload 22
    Insert
  25. Image Upload 24
    Nose
Author
Jared023
ID
360319