2022 08 August (2)

  1. Vasavi's replacment
    Frank Fang

    Image Upload 2
  2. Ramiro's replacment
    • Mayra
    • Image Upload 4
  3. PQI Procedure
    100657777
  4. PQIN in SAP
    • -QN
    • -Customer Complaint, ZC
  5. If you find about a SQ not from QUEST
    Still create PQIN
  6. How long without reply from SQ reporter until you can close?
    90 days
  7. TRL
    Technology Readiness Level
  8. SCSSV
    Surface Controlled Sub Surface Safety Valve
  9. CWS-2
    • Qualification of Welders
    • "I can weld too."
  10. CWS-1
    Weld Procedure Qualification
  11. NDE-7
    • Round/Oval Side Pocket Mandrels
    • (7 ball, side pocket)
  12. Qualification of Welders
    • CWS-2
    • "I can weld too."
  13. Weld Procedure Qualification
    CWS-1
  14. PQR
    • -Procedure Qualification Record
    • -Has to be done for WPSs
  15. TRC-3 is called...
    Geoguard
  16. Geoguard is....
    TRC-3
  17. NDE-12
    • Visible Penetrant
    • (Rodgers visibly penetrants defenses)
  18. Visible Penetrant procedure
    • NDE-12
    • (Rodgers visibly penetrants defenses)
  19. 2 Types of internal QNs
    • ZS - Supply
    • ZM - Manufacture
  20. GRDP (training)
    • Global Rotational Development Plan
    • Cameron Hi-Po
  21. Std 002
    • SQ/PQ Reporting
    • (2 things)
  22. Image Upload 6
    • Ahed.
    • Reliability Metier Mgr
  23. UEHM
    Universal Electro-Hydraulic Module
  24. What does the UEHM do?
    Take 2 hydraulic lines and 1 electrical line, control many zones.
  25. What does Lisk make?
    Solenoid valves in UEHM
Author
Jared023
ID
359134
Card Set
2022 08 August (2)
Description
work
Updated