Surface Force 3M Program - Program Guidance

  1. Damage Control Petty Officer (DCPO) will complete which DCPO PQS series and prerequisites prior to being assigned any DCPO maintenance?
    43119-4
  2. Weekly 3-M report cover page in enclosure 8 will be used for command level 3-M weekly PMS reports. This will be maintained by the 3MC for the current and previous quarter, how many weeks minimum?
    26
  3. Up-line reporting via revised alternative data flow website (RADWEB) is required at a minimum of how many times per calendar week?
    2
  4. Automated Shore Interface download and processing is required when the Automated Shore Interface record count in RADWEB is how many records for shore facilities?
    3,000
  5. Ship’s ASIs available in RADWEB will be downloaded and processed into the ship’s MDS within how many days of ASI creation?
    7
  6. How often at a minimum will Littoral Combat Ship (LCS) class ships download and process ASI?
    Monthly
  7. For Amphibious Assault Ships (LHA), Landing Helicopter Dock (LHD) and Amphibious Command Ships (LCC) class Additional Skill Identifier (ASI) download and processing is required when the ASI record count in RADWEB is how many records?
    10,000
  8. Who/what is the only authorizing activity for bulk load reviews?
    COMNAVSURFPAC/COMNAVSURFLANT N43 3-M
  9. How often at a minimum must the Planning Board for Maintenance (PB4M) meet to plan, prioritize, and coordinate the execution of all maintenance?
    Monthly
  10. MDS pre-transmittal reviews will be configured from WCS to LCPO/DIVO to DH then to the 3MC. LCPO and who else will have the same level of review?
    DIVO
Author
Coreyk58
ID
359037
Card Set
Surface Force 3M Program - Program Guidance
Description
Updated