-
Who exercises primary responsibility for the effective operation and support of the 3-M program?
TYCOM
-
Type Desk will assess unit’s Current Ship's Management Project (CSMP) at the alpha minus 180 (A-180) timeframe and what percent lock timeframe for availabilities? (
80%
-
The TYCOM Material Readiness (N43) staff shall process 3-M technical feedback reports within how many weeks of receipt?
1
-
The ISIC must ensure 3-M certifications, PVs, and 3-M re-assessments are current and scheduled. ISICs must request permission to change certification, recertification and PV dates at least how many days in advance?
30
-
The ISIC must validate subordinate commands are conducting which type of rigorous 3-M self-assessments?
Quarterly
-
ATG will provide to COMNAVSURFPAC/COMNAVSURFLANT N43 3-M a 30-day event schedule updated how often?
Weekly
-
ATG will conduct 3-M training and certifications on ships at least how many times per Operational Fleet Response Plan (OFRP) cycle?
1
-
How often should the maintenance team meet at a minimum to plan, prioritize, and coordinate the maintenance at the command?
Monthly
-
Who is the Chair for the Planning Board for Maintenance (PB4M)?
Commanding Officer
-
The TYCOM exercises primary responsibility for the effective operation and support of the 3-M program. The TYCOM Material Readiness (N43) staff shall have how many primary responsibilities?
8
-
Damage Control Petty Officer (DCPO) will complete which DCPO PQS series and prerequisites prior to being assigned any DCPO maintenance?
43119-4
-
Weekly 3-M report cover page in enclosure 8 will be used for command level 3-M weekly PMS reports. This will be maintained by the 3MC for the current and previous quarter, how many weeks minimum?
26
-
Up-line reporting via revised alternative data flow website (RADWEB) is required at a minimum of how many times per calendar week?
2
-
Automated Shore Interface download and processing is required when the Automated Shore Interface record count in RADWEB is how many records for shore facilities?
3,000
-
Ship’s ASIs available in RADWEB will be downloaded and processed into the ship’s MDS within how many days of ASI creation?
7
-
How often at a minimum will Littoral Combat Ship (LCS) class ships download and process ASI?
Monthly
-
For Amphibious Assault Ships (LHA), Landing Helicopter Dock (LHD) and Amphibious Command Ships (LCC) class Additional Skill Identifier (ASI) download and processing is required when the ASI record count in RADWEB is how many records?
10,000
-
Who/what is the only authorizing activity for bulk load reviews?
COMNAVSURFPAC/COMNAVSURFLANT N43 3-M
-
How often at a minimum must the Planning Board for Maintenance (PB4M) meet to plan, prioritize, and coordinate the execution of all maintenance?
Monthly
-
MDS pre-transmittal reviews will be configured from WCS to LCPO/DIVO to DH then to the 3MC. LCPO and who else will have the same level of review?
DIVO
-
Command and ISIC will ensure that the 3-M Certification is completed prior to the end of which phase and maintained throughout Optimized Fleet Response Plan (OFRP)?
Basic Training
-
3-M certification will be conducted at least how many times every Optimized Fleet Response Plan (OFRP) cycle?
1
-
What is a no-notice one day event conducted by TYCOM with ATG 3-M team trainer representative and ISIC to validate 3-M program health?
3-M Snap-Shot
-
A 3-M PV is conducted to evaluate the unit’s 3-M Program health by assessing what percent of each department’s work centers?
25%
-
3-M certification will be suspended until successful completion of the phase 4 event if required PV is not completed within how many days after being triggered?
120
-
Forward Deployed Naval Forces (FDNF) units will remain on a how many-month 3-M cycle?
24
-
Forward Deployed Naval Forces (FDNF)- Europe units are on a how many-month 3-M cycle?
32
-
Who schedules the 3-M Snap-Shot?
TYCOM
-
Who is responsible for scheduling all 3-M certifications, PV, or re-certifications with ATG?
ISIC
-
FDNF and FDNF-E ships are forward and continuously deployed with no clear definition of deployment. Who will trigger the Pre-Deployment global trigger after successful completion of a TYCOM LOA?
3MC
-
The Snap-Shot is a one day event that will provide COs, ISICs, and TYCOM an objective appraisal of a unit’s 3-M program health. This is accomplished by a review of how many of the previous weeks of PMS, CSMP performance, and space inspection?
4
-
Who provides the last four quarters of unit’s self-assessments?
ISIC
-
How many events are there in the Snap-shot schedule of events?
7
-
Snap-Shot will not be conducted during how many different situations?
3
-
The Snap-Shot out brief will include how many items?
3
-
Snap-Shot will not be conducted how many weeks prior to a scheduled 3-M CA or PV?
13
-
What is a one day event that will provide COs, ISICs, and TYCOM an objective appraisal of a unit’s 3-M program health?
Snap-Shot
-
Snap-Shot Spot checks will be based on the maintenance completed within previous how many weeks?
4
-
3-M Program Validation (PV) is conducted to evaluate the unit’s 3-M program health by assessing what percent of each department’s work centers to include ER09 and command level of participation?
25%
-
3-M Program Validation (PV) is triggered for units that have how many unsuccessful TYCOM Snap-Shots during the same OFRP?
2
-
ISIC and unit not completing the Program Validation (PV) within how many days of notification will lose 3-M certification?
120
-
A Program Validation (PV) with CTS less than what percent will cause a loss of command 3-M certification?
80%
-
The POA&M will be submitted to COMNAVSURFPAC/COMNAVSURFLANT N43 and N7 within how many days of completion of Program Validation (PV)?
30
-
ISIC and unit will schedule the Program Validation (PV) within how many days of notification?
90
-
A Program Validation (PV) with DTS less than what percent will cause a loss of departmental 3-M certification?
80%
-
A PV with CTS less than 80 percent will cause a loss of command 3-M certification and will required full recertification by ATG within how many months?
4-6
|
|