Administration - Comprehensive

  1. Which series provides general shipboard safety precautions and specific occupational health program guidance?
    OPNAVINST 5100.19
  2. How many general types do Technical Work Documents (TWDs) consist of?
    3
  3. What coordinates the materials required, initial conditions, Maintenance Procedure (MP), test and inspections, and system restoration for the selected maintenance task?
    FWP
  4. Which type of work package is required when higher authorities require a record of repairs/maintenance for fabrication, repair, installation, inspection and testing process for specific systems/components?
    CWP
  5. What is used to tie two or more Technical Work Documents (TWDs) together when a single Technical Work Document (TWD) is insufficient to complete a maintenance task?
    Sequencing document
  6. What are defined as any technical documents which are not readily available to the craftsman and are used to provide information, direct or document work, or direct contingency work?
    Enclosures
  7. What is defined as the unplanned repetition of a step, or series of steps in a Controlled Work Package (CWP)/Formal Work Package (FWP)?
    Rework
  8. How often do CVN’s receive Casualty Report (CASREP) status updates from CNAF N411?
    Daily
  9. What are requisitions submitted for a casualty report (CASREP) requirement?
    NORS
  10. Which type of requisition is submitted for a Casualty Report (CASREP) requirement?
    NORS
  11. Which publication promulgates the message format which must be utilized in the submission of a Casualty Report (CASREP)?
    NWP 1-03.1
  12. The CASREP system contains four types of reports: initial, update, correct, and what else?
    Cancel
  13. CASREPs are submitted to report the occurrence of a significant equipment casualty or malfunction which cannot be corrected within how many hours and which reduces the ship’s ability to perform its mission?
    48
  14. There are three equipment reports used in damage control administration. These reports are the CASREP, DC Equipment Test and Inspection, and what other reports?
    CASCOR
  15. Which type of message reports support the CNO and the fleet commanders in the management of assigned forces?
    CASREPs
  16. How many types of reports does the Casualty Report (CASREP) system contain?
    4
  17. How many types of reports does the Casualty Report (CASREP) system contain?
    4
  18. Which type of reports are used to communicate in a written message format your ship’s need for outside assistance to fix a broken piece of equipment?
    CASREPs
  19. Which publication contains information on the preparation and submission of Casualty Reports (CASREPs)?
    NWP 1.03-1
  20. Which type of message should be sent by the ship for urgent Navy Cash maintenance problems beyond shipboard capabilities?
    CASREP
  21. Which type of message should be provided by the ship for urgent Navy Cash maintenance problems beyond shipboard capabilities?
    CASREP
  22. Which type of message should be provided by the ship for urgent Navy Cash maintenance problems beyond shipboard capabilities?
    CASREP
  23. Which program promotes a command culture that leverages the fundamentals of ORM to identify hazards and mitigate risks, enabling safe and effective mission execution while preserving valuable human and material resources?
    Safety
  24. For what sole purpose are all mishap investigations conducted?
    Safety
  25. Who is ultimately responsible and accountable for command safety?
    CO
  26. The ultimate goal of an effective safety program is to deliver what?
    Enhanced combat readiness
  27. Which instruction extensively covers safety program specifics?
    OPNAVINST 5100.19
  28. Which tool is used at every level of a command to identify and control risks?
    Risk management
  29. The risk management stages are: identify hazards, assess hazards, make risk decisions, implement controls, and what else?
    Supervise
  30. How many different safety practices should always be observed by personnel?
    7
  31. Which series outlines the safety program and the safety organization?
    OPNAVINST 3120.32
  32. Which publication provides general welding safety precautions?
    NSTM 074
  33. Which magazine contains the most accurate information on the design, construction, conversion, operation, maintenance, and repair of naval vessels and their equipment?
    Sea and Shore
  34. Which publication provides a summary of research from selected reports of submarine hazards to assist in the prevention program?
    Flash
  35. Warning plates for electronic equipment are installed in small craft to warn against the energizing of electronic equipment until ventilation blowers have been operating a minimum of how many minutes to expel explosive vapors?
    5
  36. Shock Hazard warning signs are required near the entrance areas of compartments and walk-in enclosures that have equipment with voltages in excess of how many volts?
    30
  37. Gyro and magnetic steering courses shall be recorded for every course change over how many-degrees or at least half hourly?
    10
  38. How many minutes before the hour are watch members relieved?
    15
  39. Who is responsible for the safe and effective operation, care and maintenance of the reactor electrical, control and instrumentation systems?
    RCA
  40. Who is designated in writing by the commanding officer as the focal point of the integration of people and processes, enabled by technology, to facilitate the exchange of operationally relevant information and expertise to increase organizational performance?
    KMO
  41. What is a complete daily record, by watches, which describes every occurrence of importance concerning the crew and the operation and safety of the ship or items of historical value?
    Deck log
  42. What is a chronological record of orders pertaining to the speed of the propulsion engines or motors?
    NAVSEA 3210/1
  43. Records of classified visits by foreign nationals shall be reported to CNO as required by which instruction?
    SECNAVINST 5510.34
  44. What is maintained in a loose-leaf or bound ledger and contains the orders of the commanding officer for the operation and safe navigation of a ship underway during the night?
    Night Order Book
  45. Which series encompasses all safety disciplines, such as systems safety, aviation safety, weapons/explosives safety, off-duty safety (recreation, public, and traffic), and occupational safety and occupational health?
    OPNAVINST 5100.23
  46. Ships’ Safety Bulletin is published how often by the Naval Safety Center?
    Monthly
  47. Gyro and standard magnetic compass courses shall be recorded at least how often and before entering restricted waters
    Daily
  48. What provides an integrated system for performing aeronautical equipment maintenance and all related support functions?
    NAMP
  49. What is the record containing both the routine, test, etc., along with the scheduling and planning information called?
    PMR
  50. Personnel are responsible for performing maintenance tasks that are assigned to them and can determine assignments from which view in SKED 3.2?
    MY TASKS
  51. Which block of the OPNAV 4790/CK would the EIC be entered into?
    Block 5
  52. The PMS Cycle will be determined at the discretion of the Type Commander (TYCOM) but will not exceed how many Quarters?
    24
  53. A shore command’s PMS Cycle shall be how many quarters?
    20
  54. What provide for the management of configuration and scheduling information for each equipment requiring periodic maintenance?
    PMR's
  55. Who is responsible for rescheduling MRs that are still within periodicity?
    WCS
  56. Which section of the OPNAV 4790/CK is the special purpose section?
    Section IV
  57. Who is the command’s 3-M System Manager?
    Executive Officer
  58. The 3M System Coordinator must supervise the command’s 3-M system Self-assessment Program. How often must they provide status report to the System Manager?
    Weekly
  59. Which block of the OPNAV 4790/CK would alterations be entered into?
    Block 4
  60. Who is responsible for ensuring that backups of the SKED database are produced and maintained according to Type Commander (TYCOM) directives?
    3MC
  61. Who is responsible for the final approval of the Quarterly Schedule?
    Department Head
  62. Who must the Department Head coordinate with to ensure command allowances, including tools, parts, materials, and test equipment needed for PMS are updated
    Supply Officer
  63. Equipment Alterations are initiated by which approved class of Engineering Change Proposals (ECPs)?
    Class I
  64. Who shall approve the Cycle Schedule in SKED?
    Department Head
  65. Intermediate Maintenance Activities (IMAs) require the capability to generate work requests for periodic maintenance. What provide that capability?
    PMR's
  66. What is a collection of recurring jobs applicable to multiple supported units?
    MJC
  67. What describes mandatory maintenance requirements, CMP periodic requirements, IMA support routines, alterations, Hazardous Material (HAZMAT) procedures, calibration routines and other SYSCOM and TYCOM directed maintenance requirements applicable to one or more ship classes
    MJC
  68. Which symbol is the mark used to indicate completion of a MR?
    X
  69. Which type of schedules does SKED 3.2 have?
    Equipment-based
  70. What is a list of MIP’s identified in the shore distribution database for the Work Centers?
    LOEP
  71. Which action code can be used for maintenance action reporting and means “Maintenance Requirement Should Have Been Done Sooner”
    C
  72. Which system has been developed to provide the Command’s Maintenance Team with the tools to plan, schedule, and control planned maintenance effectively?
    PMS
  73. Mandatory related maintenance checks, which are to be completed during the quarter, are indicated by which symbol?
    #
  74. How many copies of the PMS Master File does each PMS installation package include?
    1
  75. Who has overall responsibility for ensuring maintenance is accomplished following 3-M System?
    Commanding Officer
  76. Which program provides the policy and procedures used to manage alterations for individual hulls based on scheduled ship availabilities?
    FMP
  77. Which PMS Manual reflects that portion of the PMS Master File that contains only the planned maintenance requirements applicable to a particular Work Center?
    Work Center
  78. What provides a listing of the Maintenance Index Pages (MIP’s) for systems and equipment assigned to each Work Center, and systems and equipment not requiring PMS or currently being evaluated for PMS?
    LOEP
  79. What is defined as any activity that has the capability to perform all aspects of work on ships?
    Industrial
  80. How many items are contained in the List of Effective Pages (LOEP)?
    13
  81. The Quarterly PMS schedule, updated how often, provides a ready reference to the current status of PMS for each Work Center?
    Weekly
  82. Which type of PMS schedules are used to plan and schedule MR’s to be conducted during each calendar quarter?
    Cycle
  83. What are defined as any piece of equipment, sub-equipment, system, or subsystem requiring maintenance?
    Maintenance Items
  84. Which block of the OPNAV 4790/CK would the ship’s UIC be entered?
    Block 1
  85. Which section of the OPNAV 4790/CK contains information on the component(s) affected by the maintenance (configuration change) action?
    Section III
  86. Which block of the OPNAV 4790/CK would the four-character JSN assigned by the Work Center supervisor be entered in? (Page B-2)?
    Block 3
  87. Once the Cycle Schedule has been finalized, SKED 3.1 automatically generates the first how many quarters of maintenance for the Work Center
    3
  88. How many types of Equipment Alteration are there?
    4
  89. Which type of equipment alteration is a mechanical, electronic or electrical change, modification or alteration made to electronic equipment after delivery to the government or installation on board ship, including software changes, which does not impact interfaces to other equipment within the ship, change the footprint, form or fit, change power, weight, or air conditioning requirements?
    Field Change (FC)
  90. How many copies of List of Effective Pages (LOEP) does each PMS installation package include?
    2
  91. Which action code can be used for maintenance action reporting to describe Maintenance Action Completed; No Parts Required?
    3
  92. Who will establish joint instructions to identify common Master Job Catalog (MJC) requirements and standard procedures for its distribution and maintenance?
    TYCOM’s
  93. The automated Periodic Maintenance Program (PMP) adds all Test and Monitoring System (TAMS) installed equipment records into which system of the Class CDM?
    SCLSIS
  94. Which view in SKED 3.2 consists of functional displays for scheduling, forecasting, planning around situational events, looking up PMS history, checking on inactive equipment, performing review and omit line-outs, etc.?
    WORK CENTER
  95. Which program was established to assist maintenance and material managers in executing Class Maintenance Plans (CMP) and Life Cycle Manager (LCM) requirements to sustain the operability of weapons systems
    PMP
  96. What organize Maintenance Items under like categories?
    Maintenance Groups
  97. What are the broadest unit of organization of PMS documents?
    MIP’s
  98. Which section of the OPNAV 4790/CK contains remarks relating to the accomplishment of the action?
    Section II
  99. Which PMS schedule provides the Work Center Supervisor a management tool for planning MR’s?
    Weekly
  100. The Fleet Modernization Program (FMP) is supported by which database?
    NDE-NM
  101. Which action code can be used for maintenance action reporting and means “Maintenance Requirement Was Necessary”
    B
  102. Which level of maintenance is the responsibility of ship’s force for accomplishment?
    Organizational
  103. The 3M System Coordinator must ensure all routing review signatures have been applied prior to forwarding 3-M documents to the designated data processing activity within how many working days of document origination or as operationally feasible?
    7
  104. Which type of equipment alteration is a modification, usually to Under-Sea Warfare (USW) equipment or systems, or other equipment groups as designated by the cognizant Systems Command, Program Manager (PM), Participating Acquisition Resource Manager (PARM), and Configuration Control Boards (CCBs)?
    Engineering Change (EC)
  105. Which level of maintenance requires major overhaul or a complete rebuilding of parts, assemblies, subassemblies, and end items, including the manufacturing of parts, modifications, testing, and reclamation?
    Depot
  106. Which action code can be used for maintenance action reporting to describe Maintenance Action Completed; Parts Drawn from Supply?
    1
  107. Maintenance procedures developed in accordance with which principles for planned maintenance are the minimum required to maintain equipment within specifications?
    RCM
  108. Which PMS file contains information relative to PMS requirements for specific equipment for which the command is responsible?
    Master
  109. Which form is used to manually document an addition, change or deletion to a PMR Configuration and/or Scheduling Record?
    OPNAV 4790/CK
  110. Who may change default roles for customized management of the 3-M System program?
    TYCOM
  111. The automated Periodic Maintenance Program (PMP) develops, evaluates and implements which type of deferral for each PMR added to the CMP?
    MJC
  112. Which block of the OPNAV 4790/CK would the code of the shipboard Work Center responsible for the equipment be entered in?
    Block 2
  113. Who will assign the default permissions and viewable content for each SKED user account?
    3MC
  114. Which form is used to report completion (or partial completion) of alterations, maintenance actions that resulted in a configuration change, and to correct discrepancies and errors in the configuration files?
    OPNAV 4790/CK
  115. Which level of maintenance is normally performed by Navy personnel on board tenders, repair ships, Shore Intermediate Maintenance Activities (SIMAs), aircraft carriers, and fleet support bases
    Intermediate
  116. Which action code can be used for maintenance action reporting to describe Maintenance Requirement Could Have Been Deferred?
    A
  117. Which action code can be used for maintenance action reporting and means “High Cost Repairs”
    M
  118. Which form should be used to report equipment changes?
    4790/CK
  119. Which action code is only to be used by Intermediate Maintenance Activities in the Final Action Block for rejected work?
    6
  120. Who is the functional manager of the 3-M System?
    3M System Coordinator
  121. Which function in SKED 3.2 facilitates computation of PMS accomplishment data and generation of reports relative to maintenance status?
    Weekly closeout
  122. Which section of the OPNAV 4790/CK identifies the system or equipment involved in the configuration action?
    Section I
  123. Which secondary NEC must an E-6 have to be assigned as the 3M System Coordinator?
    NEC 9517
  124. What supersedes all previous planned or preventive maintenance systems or programs?
    Planned Maintenance System
  125. How many items are provided by the Planned Maintenance System (PMS)?
    7
  126. Which action code can be used for maintenance action reporting to describe Maintenance Action Completed; Required Parts Not Drawn from Supply (local manufacture, pre-expended bins, etc.)?
    2
  127. Which board was established by Congress as a board to periodically examine naval vessels and make recommendations to the Secretary of the Navy if any should be stricken from the Naval Vessel Register?
    INSURV
  128. Which action code can be used for maintenance action reporting and means “The Equipment Being Reported Had a Time Meter”
    T
  129. Which action code is not to be used with INSURV, safety, or priority 1 or 2 deferrals screened for accomplishment by the TYCOM or IUC?
    4
  130. Which system, if used effectively, will result in a higher degree of equipment readiness?
    3-M
  131. What is an index of a complete set of MRC’s applicable to a ship system, subsystem, or equipment?
    MIP
  132. Who is responsible for maintaining the PMS Master File?
    3MC
  133. To ensure standardization of the measurement of 3-M program performance, and to enhance communications at all levels of command, the procedures and criteria in which series shall be used?
    COMFLTFORCOMINST 4790.3
  134. Who are responsible for ensuring the proper installation and operation of PMS within the ships under their command?
    TYCOM's
  135. NAVSEA S9081-AB-GIB010/MAINT along with which other publication should be consulted for a description of the NAVSEA Reliability Centered Maintenance (RCM) analysis process?
    MIL-STD-3034
  136. A final formal ship-wide PMS installation, which represents the full PMS package installation will correspond with which plan in regards to the ship?
    Commissioning
  137. Current Ship's Maintenance Project (CSMP) data, even if unclassified, must be treated as which type of data?
    Business sensitive
  138. How many tools are used to report MDS data elements?
    6
  139. Which section of the Class Maintenance Plan (CMP) describes the strategic plan and the role of maintenance in sustaining current and future readiness and material condition to ensure ships remain relevant and reach their expected service life?
    Plan overview
  140. Which level of briefing will provide refresher training in the concept and management aspects of PMS for the benefit of the Commanding Officer, Executive Officer, 3M System Coordinator, and Department Heads?
    Top Management
  141. Who should ensure that material deficiencies are being continuously prosecuted and adjudicated with the appropriate priority and assignment?
    ISIC
  142. How many categories of Class Maintenance Plan (CMP) maintenance tasks are there?
    2
  143. Which type of inspection provides an opportunity for the ship to demonstrate a high material self-awareness as reflected in accurate documentation of its deficient conditions?
    Inspection and Survey
  144. The Fleet Maintenance Effectiveness Review (FLEETMER) process applies which type of Reliability-Centered Maintenance (RCM) methodology?
    Backfit
  145. What/whom is responsible for coordinating and executing Maintenance Effectiveness Reviews (MER’s) per approved processes/procedures and to ensure those resources available for reviewing and improving maintenance are efficiently utilized?
    NAVSEA
  146. What is “the sole source of work to be accomplished by industrial activities, FMAs, and organizational level activities”?
    CSMP
  147. How many primary Maintenance Data System (MDS) inspection objectives are there?
    4
  148. Personnel attending the 3-M Coordinator/Inspector (J-500-0029) course must be previously qualified up to which PQS level via NAVEDTRA 43241 prior to class convening?
    305
  149. Which NAVSEA system are On Site Analysis Reports (OSAR’s) uploaded to for advanced analysis and to aid in overall system health determination?
    SMMIS
  150. Prior to the PMS installation, equipment configuration information will be verified by whom?
    CDM
  151. Common assessment procedures shall be developed and periodically reviewed using which type of maintenance?
    RCM
  152. New or modified Common Assessment Procedures shall be developed as what?
    MRC's
  153. Discrepancies associated with and requests for modifications to procedures or associated Class Maintenance Plan (CMP) tasks shall be reported via which 3-M system?
    TFBR
  154. Common Assessment Procedures satisfy the needs of work determination, inspections, certifications, and assist visits in a standardized documentation used across carriers, submarines, and surface ships and by all other activities. How many types of commonality are invoked
    2
  155. Which compliant process does Backfit Reliability-Centered Maintenance (RCM) follow?
    MIL-STD-3034
  156. Ship’s maintenance information is reported by fleet personnel to what for processing into the Ships' Maintenance and Material Management (3-M) System Database?
    NAVSEALOGCEN
  157. Which online database is used for ships’ to predict failure rates of components, determine areas that need improvement and track equipment performance?
    3-M
  158. How many primary types of maintenance data are reported and retained in the 3-M system database?
    7
  159. The Ships' 3-M Reference offers users the ability to access how many different 3-M reference code tables?
    40
  160. Which system was designed to make retrieving maintenance and material management information quick and easy?
    OARS
  161. Who must ensure that adequate 3-M Program training is conducted for all personnel within the command associated with maintenance, configuration and logistics support management?
    TYCOM's
  162. Which publication provides the 3-M knowledge and fundamentals required for workstations with both PMS and automated MDS requirements?
    NAVEDTRA 43241K
  163. What is primarily used to manage 3-M Organizational Level Maintenance?
    CSMP
  164. Which publication requires each class of ship to have a NAVSEA approved tailored Class Maintenance Plan (CMP)?
    OPNAVINST 4700.7
  165. The INSURV number is assigned to each deficiency identified during an inspection or trial for how many reasons?
    4
  166. NAVSEALOGCEN Det Norfolk/San Diego has the responsibility for installing PMS aboard ship. The installation of PMS is performed in how many phases?
    2
  167. Documentation of INSURV inspection deficiencies will be accomplished per which publication?
    COMUSFLTFORCOMINST 4790.3
  168. Reliability Centered Maintenance (RCM) provides a structured approach to the design and review of the maintenance program and ensures every maintenance task meets basic criteria. How many basic types of criteria are there?
    4
  169. A final formal ship-wide PMS installation is performed approximately how many weeks prior to placing submarines and nuclear powered surface ships in service?
    2
  170. How many items does the PMS installation package consist of?
    5
  171. A final formal ship-wide PMS installation is performed approximately how many weeks prior to commissioning for all non-nuclear-powered ships?
    2
  172. What is used by maintenance managers to manage and control the accomplishment of deferred maintenance and for the research of financial, industrial, operational, and analytical purposes in support of ships?
    CSMP
  173. Which database serves as the Navy's central repository for Ship Configuration and Logistic Support Information (SCLSI)?
    CDMD-OA
  174. Information available from the 3-M Maintenance Data System can be of value in how many different areas?
    17
  175. What is used to determine the effectiveness of the command's 3-M program in managing the accomplishment of maintenance?
    Inspection
  176. Which 3-M course provides leading Logistics Specialists assigned to R-Supply (Force) equipped ships with the required knowledge and skills to perform duties?
    A-551-0027
  177. Which period is a finite period of time usually corresponding to a patrol period for SSBN’s or aligned with maintenance availabilities taking the IDTC into account for the SSN’s?
    Monitoring
  178. Which section of the Class Maintenance Plan (CMP) shall list and describe all maintenance expected to be performed on ship systems and equipment so that all maintenance and availability routine tasks can be effectively planned and executed?
    Maintenance requirements
  179. The recommended maintenance requirement changes from Fleet Maintenance Effectiveness Review (FLEETMER) are documented as what?
    TFBR’s
  180. Which 3-M Systems Central Database is the focal point for receipt and distribution of maintenance and material data?
    NAVSEALOGCEN
  181. Which 3-M course was created to train personnel in common software services that provide interface between client/server application programs and the operational environment
    A-531-0021
  182. Which classification is the 3-M Systems Central Database designated as?
    Unclassified
  183. Specifically, for those work notifications (OPNAV/2K) being created by INSURV, which alpha character does the JSN begin with?
    R
  184. Which system provides the maintenance and material managers throughout the Navy with the means to plan, acquire, organize, direct, control, and evaluate manpower and material resources expended or planned for expenditure in support of maintenance?
    MDS
  185. What provides the technical oversight, technical documentation, requirements, and analysis for the Performance Monitoring Team (PMT) program?
    SEA 05U7T/PMS392T
  186. The maintenance requirements and inspections that are monitored by Performance Monitoring Teams (PMT’s) are fully integrated in which system aboard ships?
    PMS
  187. Maintenance and material information in numerous reports and formats are available through the 3-M central database to any command requiring the information. These reports yield information concerning how many types of information
    4
  188. Which submarine program was established by the Chief of Naval Operations (CNO) as a method of collecting objective engineering evidence of ship system performance?
    PMT
  189. It is the responsibility of each Work Center Supervisor to ensure that the CSMP accurately describes the material condition of the Work Center. How many items are imperative for each maintenance action?
    4
  190. Which database is the source for configuration and logistic support data available to ships and other fleet and shore activities?
    CDMD-OA
  191. Which form will inspection deficiency items be written on?
    OPNAV/2K
  192. Which type of equipment must PMS actions continue to be accomplished on until all ship's force personnel are permanently berthed ashore and/or on their assigned berthing barge (as applicable) when phasing out PMS coverage of equipment in concert with the decommissioning plan?
    Firefighting
  193. The TYCOM shall ensure which type of complete package is provided by the ship to the Navy Inactive Ship Maintenance Facility (NISMF) prior to reporting to the applicable NISMF?
    Automated Work Request (AWR)
  194. The TYCOM or ISIC under TYCOM direction shall conduct a complete inspection of each command under their cognizance, not to exceed how many months, to determine the effectiveness of the 3-M program within that command?
    24
  195. How many months prior to its decommissioning date shall ships stop Maintenance Data System (MDS) reporting?
    2
  196. How many weeks prior to transfer to a foreign Navy must ships document all outstanding maintenance for inclusion in the CSMP?
    2
  197. Documentation and validation of which type of data is the cornerstone of configuration management resulting in improved logistics and repair support aboard ship?
    MDS
  198. Who will specify procedures to be followed for the disposal of classified and/or unclassified PMS material?
    TYCOM's
  199. Who is responsible for ensuring PMS objectives are met in accordance with Fleet and TYCOM directives?
    Commanding Officer
  200. Removal and reissue/disposal of related hardware, software, and documentation not specifically addressed within the ship's decommissioning plan shall be accomplished by direction from whom?
    TYCOM
  201. Which publication is required for developing maintenance requirements for ships, ship systems, and equipment?
    NAVSEAINST 4790.27
  202. Which memorandum are the deficiencies and recommendations resulting from a Performance Monitoring Team (PMT) inspection published in?
    OSAR
  203. Which type of techniques are now used to assess the performance of many critical submarine systems, primarily the submarine Hull, Mechanical, and Electrical (HM&E) Systems?
    CBM
  204. All new or modified maintenance requirements and procedures for use by government or contractor personnel aboard carriers, submarines, and surface ships shall be developed or modified in accordance with which publication?
    NAVSEAINST 4790.27
  205. Specifically, for those work notifications (OPNAV/2K) being created by INSURV, how many data elements using the MFOM model will be entered?
    10
  206. The examination of naval vessels is conducted as which type of inspection?
    Material Inspection (MI)
  207. Which type of visit is designed to aid managers by determining how efficiently the command's 3-M program is operating and to help identify areas with potential problems?
    Assist
  208. How many primary PMS inspection objectives are there?
    3
  209. Fleet Maintenance Effectiveness Review (FLEETMER) is a lean process using the concepts of which type of maintenance to efficiently analyze and update the entire maintenance plan for selected systems and equipment in a collaborative environment of maintenance stakeholders?
    RCM
  210. Which standard codes forum serves as a communications link within the Naval Community where recommended changes, modifications and deletions are submitted, discussed and approved/disapproved prior to release version implementation?
    MMBU
  211. Which program assists in identifying and resolving fleet material issues, improving system reliability, reducing Total Ownership Cost (TOC), and assessing system health across the fleet?
    PMP
  212. The data collected per the Supplemental Report Forms (SRF) attached to the “K” MRC’s as well as the deficiency reports are entered into which engineering analysis system?
    PMP
  213. All newly developed Class Maintenance Plans (CMP’s) shall incorporate which level of planned maintenance?
    Organizational
  214. How many years worth of data exists in the Submarine Maintenance Monitoring Information System (SMMIS)?
    10
  215. Which procedures are used to evaluate the material condition of Navy ships, systems, and equipment in support of Condition-Based Maintenance for work determination, inspections, certifications, and assist visits (CBM/ICAV)?
    CAP’s
  216. How many goals is the Fleet Maintenance Effectiveness Review (FLEETMER) designed to accomplish?
    3
  217. OPNAVINST 4790.16A institutes which type of maintenance as the CNO strategy for maintaining ship, aircraft, and infrastructure material designed to optimize maintenance program costs throughout the life cycle?
    CBM
  218. Which type of maintenance provides both the maintenance engineering principles used to determine objective evidence of need and the methodology for determining and continuously improving applicable and effective maintenance requirements and associated maintenance assessment procedures and tools?
    RCM
  219. Maintenance Requirement Card (MRC) Common Assessment Procedures shall be prepared using which New PMS Editor application?
    NAVSEA
  220. Which process identifies gaps in maintenance requirements, modifies tasks to make them applicable and effective and meet the principles of Reliability-Centered Maintenance (RCM)?
    FLEETMER
  221. How many things must personnel have a clear understanding of in regards to the ships’ 3-M system?
    3
  222. How many items are factored into the selection of systems for Fleet Maintenance Effectiveness Review (FLEETMER)?
    3
  223. The Ships' 3-M online database is a historical repository of corrective maintenance actions spanning back to which year?
    1995
  224. Each Class Maintenance Plan (CMP) shall be Conditioned Based Maintenance (CBM) developed with all maintenance requirements based on which principles?
    RCM
  225. The Ships' 3-M/OARS Basic Training Course is essentially broken down into how many main topic areas?
    2
  226. What describes all preventive maintenance actions and maintenance support requirements, including material condition assessment requirements, approved modernization, and shipyard routines?
    CMP
  227. Which system is the nucleus for managing maintenance aboard all ships and shore stations of the Navy?
    3-M
  228. Which type of plan is developed to provide the maintenance task requirements information needed to plan, schedule, and control Intermediate and Depot-level planned maintenance effectively?
    CMP
  229. Scheduled Class Maintenance Plan (CMP) maintenance tasks are developed, reviewed, and justified as applicable and effective through RCM analysis according to which publication?
    MIL-STD-3034
  230. What/whom is responsible for maintaining a 3-M System training plan designed to meet the needs of the Fleet?
    NETC
  231. What/whom is the program manager for fleet-wide 3-M training?
    CSS
  232. Which program was designed to introduce and train individuals on the usage of OARS and the 3-M database?
    Ships' 3-M On-line
  233. Scheduled Class Maintenance Plan (CMP) maintenance tasks may include how many primary tasks?
    3
Author
Coreyk58
ID
359032
Card Set
Administration - Comprehensive
Description
Updated