500 pc

  1. 51a
    Airframes
  2. 51b
    Corrosion
  3. 51c
    Weld shop
  4. 51d
    • Machine shop
    • Sailors and civilians
  5. 51e
    A/C Tire and Wheel
  6. 51f
    Composites
  7. 51h
    Civilian/airframes
  8. 51q
    civilian / composites
  9. 51n
    civilian / machine shop
  10. 520
    hyd
  11. 530
    NDI
  12. What priority is placed on 500 Work Request
    • 1- NMC or PMC A/C and SQN deploying within 30days 
    • 2- repair of critical assets (LRCA) or SE
    • 3- Repair of Non-critical LRCA or SE
    • 4- Repair of Salvaged Material / non aeronautical work
  13. what is required for a w/r
    parts/ material, work request, publication/ reference
  14. what does DED stand for 
    -POC's
    -What a/c
    -authorization frequency
    • Damage engineering disposition 
    • -package includes pictures and measurements
    • -Brenda Bupp
    • -F-18 specific
    • -Engineer authorizes instruction for one time use (can be authorized for multiple use) or BCM. 
    • -Documented over email
  15. ELARS
    p-3 specific
  16. where is the REI documented
    • Documented and tracked in P-8 Track Website
    • -P-8 specific (same as DED)
    • - Engineer replies with TEI
  17. Conditions of an OPEN X-RAY
    • CO briefed directly within 24 hrs minimum
    • Fire Dept 24hr min
    • Notify COC (main PC included)
    • 1MC Call right before shooting
    • Notify Radiation Safety Officer (AM1 Ulrich, LT Ramos, Am1 Cross)
    • Must be w/in 2hr of X-ray site
    • qualified radiographer in charge (RIC) on site for evolution
  18. Condition of CLOSED X-RAY? (shielded)
    • performed in the vault
    • call the PC Desk as soon as notified
  19. Function of NDI CDIs
    to account for tools only
  20. 51e personnel quals?
    All personnel must be a/c tire and wheel safety qualed
  21. what is special about P-8 tire removal
    every 5th tire removal, rim gets overhauled
  22. what must be in the CA block when signing off hydraulic MAFS that needed a Hyd Sample
    method of testing and navy class
  23. WUC for general aeronautical MAFs
    050
  24. WUC for general non-aeronautical MAFs
    090
  25. What is PMIC?
    Pub for T/M/S high times
  26. What is a Dirty Can?
    Cannibalization w/out paperwork
  27. where can ELARS be found
    NATEC
  28. Induction process for Strain Gauge (51F)
    • The person submitting should have:
    • -W/R
    • all 7 strain gauges (s1-s7) each of them has different part numbers (primary and Secondary)
    • -make sure the location where the strain gauges are to be installed have been cleaned (51F CDI verifies this)
    • -Once the strain gauges have been installed, do not touch for 24hrs. 
    • -The CDI rechecks after 24 hours
    • -Fail- repeat the process
    • -Pass- Gets sealed
Author
TexasTequila
ID
357460
Card Set
500 pc
Description
Updated