Home
Flashcards
Preview
2022 01 January CAS
Home
Get App
Take Quiz
Create
2 Items in RSLSA/CP VMI program
Model L
RHR
Structure of CP/RSLSA VMI program
1. On months 10-20, Off months 0-10
2. Safety Stock - 10
3. Raw Material - 20
Who made CP's seal subs with the bad stub acme threads?
United
Omni Alliance Contract: PAC
Petroleum Arrangement Contractor - Petronas
Omni Alliance Contract: 3 models
1. PO to Omni, SLB mfg.
2. SLB or Omni mfg with SLB IP.
3. SLB subcontracted for service
Omni Alliance Contract: LIBOR
London InterBank Offered Rate (interest rate)
What do we need on all payments?
Bank Receipt
Guy at Hunting helping us
Corey Savoie
5 CP Screens
Endure
Assure
Secure
Selecture-ICD
Capture-wire wrap
New Ops Manager at CP
Adie
New Engineer at CP Screens?
Thia
TPAO
Turkali project
What kind of electrodes for Comm Nipple?
Graphite, not Copper
PCSB
Petronas Carigali Sdn Bhd
Malaysia initiative for wellhead equip
Project Shine
Currently only 1 vendor in Malaysia doing wellheads
SOLAR
Another word for Malays
Bumi
Qualification plan for Aflas seals at CP this year (3)
-4" ATR H1
-4" ATP H1
-6" ATP H2
Where does inverted bonded seal go?
Brazil, Petrobras.
Product to qualify at Omni in H1
Hydrostatic Sliding Sleeve
Author
Jared023
ID
357104
Card Set
2022 01 January CAS
Description
work
Updated
2022-04-04T05:31:28Z
Show Answers
Home
Flashcards
Preview