2022 01 January CAS

  1. 2 Items in RSLSA/CP VMI program
    • Model L
    • RHR
  2. Structure of CP/RSLSA VMI program
    • 1. On months 10-20, Off months 0-10
    • 2. Safety Stock - 10
    • 3. Raw Material - 20
  3. Who made CP's seal subs with the bad stub acme threads?
    United
  4. Omni Alliance Contract:  PAC
    Petroleum Arrangement Contractor - Petronas
  5. Omni Alliance Contract: 3 models
    • 1. PO to Omni, SLB mfg.
    • 2. SLB or Omni mfg with SLB IP.
    • 3. SLB subcontracted for service
  6. Omni Alliance Contract: LIBOR
    London InterBank Offered Rate (interest rate)
  7. What do we need on all payments?
    Bank Receipt
  8. Guy at Hunting helping us
    Corey Savoie
  9. 5 CP Screens
    • Endure
    • Assure
    • Secure

    Selecture-ICD

    Capture-wire wrap
  10. New Ops Manager at CP
    Adie
  11. New Engineer at CP Screens?
    Thia
  12. TPAO
    Turkali project
  13. What kind of electrodes for Comm Nipple?
    Graphite, not Copper
  14. PCSB
    Petronas Carigali Sdn Bhd
  15. Malaysia initiative for wellhead equip
    Project Shine
  16. Currently only 1 vendor in Malaysia doing wellheads
    SOLAR
  17. Another word for Malays
    Bumi
  18. Qualification plan for Aflas seals at CP this year (3)
    • -4" ATR H1
    • -4" ATP H1
    • -6" ATP H2
  19. Where does inverted bonded seal go?
    Brazil, Petrobras.
  20. Product to qualify at Omni in H1
    Hydrostatic Sliding Sleeve
Author
Jared023
ID
357104
Card Set
2022 01 January CAS
Description
work
Updated