Basic Final

  1. How many RS in West Valley
    4
  2. RS-S is Radially fed by                  
    RS-E
  3. RS-L is in                 
    West LA
  4. How many RS in East Valley
    4
  5. Northridge is included in what area
    WV
  6. What is the name of RS-D
    Fairfax
  7. 287/138 line bank is unique to                   
    RS-B Century
  8. True/False

    RS-E Toluca has 69kv circuits
    True
  9. Metro Field truck headquarters
    RS-F
  10. SLA field truck HQ
    RS-B
  11. Gramercy SS is located where
    SLA
  12. How do you call 911 from a DWP phone
    9-911
  13. ETB emergency line
    74111
  14. Linear motion of a conductor through a magnetic field produces a                   
    sine wave
  15. True/False

    1 Peak AC = .707 peak DC
    True
  16. How are voltmeters connected
    To the secondary windings of potential transformers
  17. True/False

    Lax is located in WLA
  18. Transmission system is nominal                     
    69kv and above
  19. An employee who is certified to receive Work Authorities from an Issuing Authority or their Field Representatives
    AUTHORIZED PERSON
  20. APT are used for the following:
    • • Restrict operation or other action so personnel and/or systems and components are protected.
    • • Warn that the tagged system or component is in a condition for test or maintenance activities.
    • • Indicate if the system or component is under the operating Jurisdiction of an organizational unit other than the Issuing Authority
  21. Clearance - which statement is not true
    • all sources of energy
    • correct is "specific sources of energy"
  22. Ok To
    Grants permission for specific acts under specific conditions on specific conditions
  23. Load Dispatch provides instructions
    clearly, correctly
  24. True/ False

    Start work closest to the hazard and work away from the hazard
    True
  25. Grounding is required before conducting work on a circuit or piece of equipment                under a
    CLEARANCE
    above 7.5kV
  26. True/False

    On lines and cables 69kV and above, the ground switch is closed on Load Dispatcher orders after a
    CLEARANCE is issued
    True
  27. With adjoining CLEARANCES, the point of overlap will be tagged with two 
                       
    DO NOT OPERATE APTs
  28. Provide a substantial obstacle to the operation of a CB or other handle
    Orange caps
  29. When projecting a ground through a set of closed disconnects, the disconnects will be tagged with the
                     as the portable grounds
    same APT number
  30. Not an approved/authorized abbreviation for regulator
    "Reg"
  31. True/False

    “Out of Service” stamp is in blue or black ink
    True
  32. True/False

    Each new day that the station is attended all brought forwards are logged under the new day and
    cancelled on the previous day
    True
  33. The □□□□ CLEARANCE stamp is issued by the Load Dispatcher to the station, and the operator logs it and
    issues                to Authorized Persons
    secondary clearances
  34. The number of boxes with slashes through them for the primary clearance stamp indicate the number
    of                  issued by the station under the primary clearance
    secondary or working clearances
  35. True/False

    Conferring with the ACO is not part of a type 1 inspection
    True
  36. In an emergency situation, the type 1 inspection....
    can be limited to only the equipment associated with the emergency
  37. True/False

    If time is a factor, the work crew may leave the station, but the operator must perform a type 1 inspection
    before beginning any switching
    True
  38. A type 2 inspection is usually conducted                 for each station
    monthly
  39. It is not normally necessary to put the RTU on local...
    before beginning a station inspection
  40. Wearing clothing made from            is recommended but not required
    natural fibers
  41. True/False

    An employee must show a department security guard their ID if on department property and/ or on shift.   
    -“You do not have to show ID when off duty except when you are on DWP property”
    True
  42. A power bank in a DS converts 34.5kV to              
    4.8kV
  43. The arc interrupting/extinguishing material that occupies the space between open contacts in a CB or other piece of equipment
    dielectric medium
  44. Ammeters are fed by a maximum current of          from the secondary coil of a current transformer.
    5 amps
  45. True/False

    The service to customers can be negatively affected by energizing a bank from the low side
    True
  46. Characteristics of fuses
    • reliable
    • non re-useable
    • non selective
    • inexpensive
  47. Protection should be used on equipment that regularly has faults
    Relays
  48. Applied after all CBs are closed
    Bank in Service caps
  49. In an ungrounded 4.8kV delta configuration, the nominal voltage from phase to ground is                
    2.77kV
  50. Output voltage from the secondary windings on a PT
    120v
  51. True/False

    Equipment under a CLEARANCE is isolated from specified sources of energy
    True
  52. Personnel not considered Field Representatives
    System Protection
  53. All primary clearances should originate from the                  
    Energy Control Center
  54. A secondary clearance is also known as a              
    working clearance
  55. Operators generate APTs for all of the following except
    • 34.5kV circuits entering the station (lines and cables) are issued APTs under the load dispatchers
    • jurisdiction
  56. An OK TO work hot with a hold in case of relay on a line is given under 
                     
    dual jurisdiction
  57. Varying log books are located at the
    • OCC
    • DS
    • RS
    • SS
  58. The CLEARANCE TO stamp signifies a
                      
    secondary or working clearance
  59. True/False

    Customer Stations are usually located on private property and provide service to only one customer.
    -“Which of the following is correct?”
    True
  60. A declaration made by the issuing Authority that involved circuit, circuit component, or equipment has been Disconnected and/or Isolate from specified sources of energy and will remain so Disconnected and/or Isolated
    Out of Service - out of service equipment is not part of the power system
  61. Define "As is"
    OO-1
  62. True/False

    OK TO stamps are always preceded by the entity receiving the work authority
    True
  63. True/False

    When there are adjoining clearances, the operator, and only the operator, may operate the disconnects that
    are the border between the two clearances
    True
  64. There is no such thing as a
    secondary OK TO
  65. Slashes in the boxes of a primary OK TO stamp indicate the number of OK TO’s issued on a                
    specific piece of equipment
  66. True/False

    In a gas company station a feeder can be supplied from the 4.8kV transfer bus unregulated and regulated and from the 4.8kV reactor bus unregulated
    True
  67. For the □□□□ OK TO ____ stamp, the blank if filled in with the               
    work performed
  68. A qualified person, trained to safely and competently hold work authorities, has demonstrated knowledge of policies, practices, and procedures related to work authorities
    Authorized person
  69. An Authorized Person can work on non-system equipment up to              
    300V and below
  70. An OK TO work hot on a 34.5kV line is under the                 jurisdiction
    Load Dispatcher’s
  71. In a Gas Company Station a              in the feeder position limits fault current to the regulators
    reactor
  72. Regulators regulate voltage at the 
                  
    load center
  73. True/False 

    Proper voltage improves equipment efficiency
    True
  74. Most important reason for a station
    inspection
    To confirm the status of equipment and switching conditions
  75. Voltage at the load center is the same as the power bank’s output voltage at a distributing station minus
    the line losses when the regulators are 
                  
    blocked on neutral
  76. Simulates the voltage drop between the regulator and load center
    Line-drop compensator
  77. Local work
    performed on non system equipment
  78. True/False

    A CLEARANCE that is overheld or brought forward is treated the same as any other clearances
    True
  79. True/False

    On a 230kV bus, the clearance is issued before closing ground switches or applying portable grounds upon
    receiving the Load dispatchers orders
    True
  80. Installing               is the most practical solution to adjust for the voltage drop on an overloaded
    feeder circuit
    line capacitors
  81. APTs are              signs that have preprinted instructions and markings used to restrict operation of a
    piece of equipment
    temporary
  82. True/False

    For brought forwards in the log book, the previous day’s entry that is brought forward is cancelled
    True
  83. The slashes in an OK TO primary stamp indicate how many OK TOs there are...
    on a specific piece of equipment or circuit.
  84. In an AC circuit, true power equals the product of          and the         
    apparent power, power factor
  85. True/False

    In a DS transformer, the power (volts x amps) is equal to the power out minus losses
    True
  86. Vectors have both            and           
    magnitude, direction
  87. In a capacitive AC circuit, the current sine wave         the voltage sine wave--ICE
    leads
  88. True/False

    Single phase apparent power is equal to the current multiplied by the voltage –P=IE
    True
  89. Main power banks at receiving stations are not wye-delta, they are wired 
                   
    wye-wye
  90. Distribution Station banks are wired
    delta-delta
  91. True/False

    Autotransformers are not self-regulating
    True
  92. Transformers can be overloaded        for 2 hours
    125%
  93. Transformers can be overloaded        for 60 seconds
    370%
  94. True/False

    Hot spot temperatures (often associated with the winding temperature) exceeding 95⁰C reduces the efficiency and life expectancy of transformers
    True
  95. What increases the rate of cooling on Transformers
    Increasing surface area, air movement, and/or oil circulation
  96. Control current flow in a circuit
    CB
  97. Air is a good insulator at              
    room temperature
  98. True/False

    LTC banks are not used for voltage control at generating stations and switching stations.
    True
  99. True/False

    Line potential transformers are not used for voltage control
    True
  100. maintain proper feeder voltage
    CMVM
  101. Coordinates system voltage
    ECC
  102. If subtransmission lines don’t have voltage control,               are the most affected
    34.5kV customer stations
  103. True/False

    A 1% change in voltage will cause a 3% change in illumination for a incandescent light bulb
    True
  104. A line drop compensator simulates 
                
    impedance
  105. f a feeder regulator is inoperative, the operator must contact the....
    ACO, ETB and load dispatcher
  106. True/False

    Meters reading +VAR indicate VARs leaving the piece of equipment the metering is associated with
    True
  107. ...must be kept and filed for each drawing that is updated/changed
    3 obsolete drawing
  108. For updating drawings, deletions are in           and additions are in         
    green, red
  109. Print sizes smallest to largest
    D<DR<A
  110. In wiring diagrams, the            view is usually the one shown unless specified otherwise
    rear
  111. One line operating diagram
    sizes are                and             
    D, DR
  112. Resistance, capacitive reactance, and inductive reactance, are all measured in               
    ohms
  113. In the department’s three phase electrical system, the sine waves are                  apart
    120⁰
  114. Open delta wiring reduces the power output to            
    58%
  115. In a wye configuration, line voltage is equal to the product of the...
    phase voltage and 1.73
  116. Buccholz relays (sudden pressure) trip both              of the bank
    high and low sides
  117. The               of the primary winding determines how much current flows in transformers
    impedance
  118. Station service can be wired             through 2 cans
    open delta
  119. At an RS, a 230/34.5 bank is wired 
                    
    wye-wye
  120. Determines the capacity of a transformer
    Temperature
  121. Is used to determine load conditions at the load center
    Line drop compensator
  122. True/False

    If a CB opens too quickly, destructive overvoltage can be created
    True
  123. At a DS, a no load tap changer is adjusted to        the voltage when the regulators are consistently at
    maximum       
    raise, boost
  124. LTC line bank controls        at an        
    voltage, RS
  125. LRC banks control voltage at        
    Distribution Stations
  126. True/False

    34.5kV capacitors can be found in Distribution Stations, Receiving Stations, and subtransmission
    True
  127. True/False

    With 3-pole gang operated DISCs, a line CB is not included in a bus CLEARANCE when the DISCs
    between the bus and the CB are open, even if line DISCs are opened
    True
  128. True/False

    □□□□ CLEARANCE IN THE FIELD
    always gets a slash upon issuance
    True
  129. True/False

    A clearance outstanding gets carried forward and cancelled on the previous day
    True
  130. True/False

    The voltage drop on a feeder can be reduced by: shortening the feeder, installing a line capacitor, placing
    a synchronous condenser to full boost, or reducing the load
    True
  131. Excessive operation on a regulator is indicative of the          being too narrow and/or the          
    being too short
    bandwidth, time delay
  132. True/False

    Line Patrol Mechanics, ESM, and SSO are allowed to switch in a customer station.
    True
  133. True/False

    Changes in regulator output is determined by fluctuations in customer load
    True
  134.            causes the regulator motor to operate
    CMVM
  135. True/False

    Inductive-capacitance in not part of AC circuit impedance
    True
  136. Department or contract employee trained, certified, and signed off on by a supervisor. Also a QEW
    authorized person
  137. True/False

    Excessive operation of a regulator is prevented by: the time delay, the band width, and/or the CMVM.
    Not by the feeder load
    True
  138. Bucholz relay protects the bank from faults in the               
    zone of protection
  139. True/False

    A fault on a 4.8kV bus is protected by Bank relays
    True
  140. A directional overcurrent relay trips at the           
    local end
  141. True/False

    If a feeder is locked out and the operator notices that the regulators are bad, the position should be
    isolated, the 4.8kV transfer bus prepared, and the ECC notified
    True
  142. Feeder relay