  1. What Lower Mainland plants must only be operated by the plant operator
    Ruskin & Cheakamus
  2. What Interior plants must only be operated by the plant operator
    Arrowhead Lakes, Falls River, Lajoie, Shuswap Falls, Seton
  3. What Vancouver Island plants must only be operated by the plant operator
    Puntledge & John Hart
  4. How many units and total MW output of ALH
    Arrowhead Lakes Hydro, 2 units, 185MW total
  5. What is the major concern at Arrowhead Lakes
    • Change in flow/forebay levels
    • +433m-10min to restart unit if trip to SNL-RGO if unsuccessful
    • -433m-24min timer starts-RGO immediately-
  6. How many units and total MW output of RUS
    Ruskin, 3 units, 105MW total
  7. What is the major environmental concern at Ruskin
    • Minimum tail-water elevations
    • Oct 15-Nov 30-1.8m
    • Dec 1 -Oct 14-1.7m
  8. How many units and total MW output of CMS
    Cheakamus, 2 units, 157MW total
  9. What is the major environmental concerns at Cheakamus
    • Ramp Rates (Fish)
    • No increase ramp rates
    • Between 40MW-10MW (Plant Total) only decrease 10MW every 5 min (1.5MW per min)
    • Shut-down from 10MW after being there for 5 min
  10. How many units and total MW output of FLS
    Falls River, 2 units, 7MW total
  11. What are the major environmental concerns at Falls River
    • Ramps Rates
    • Feb 15-Mar 15-Ramp up - 1.3cms per 10 min
    • Nov 1 -Apr 15-Ramp down-1.3cms per 10 min
    • Min Flow
    • Aug 1-Oct 15-6.5cms when reservoir is at or above 88.4
    • -1.3cms when reservoir is below 88.4
    • Oct 16-July31-2.6cms when reservoir is at or above 88.4
    • 1.3cms when reservoir is below 88.4
  12. How many units and total MW output of LAJ
    Lajoie, 1 unit, 25MW total
  13. What are the major environmental concerns about Lajoie
    • Ramp Rates and Min Flow-Both done by field staff
    • To change MW output of unit use MW control NOT PRV Limit control
  14. How many units and total MW output of SHU
    Shuswap Falls, 2 units, 6MW total
  15. What are the major environmental concerns at Shuswap Falls
    • Min Flow at Wisley Dam
    • Jan 01-Aug 14-13cms
    • Aug 15-Dec 31-16cms
    • save fish setting
  16. How many units and total MW output of SON
    Seton, 1 unit, 45 MW total
  17. What are the major environmental concerns with Seton
    • Generator Output
    • Apr 01-Jun 30-unit between 32-42MW or shut down
    • Jul 01-Aug 31-unit above 32MW or shut down
    • Sep 28-Nov 15-unit above 32MW or shut down
  18. How many units and total MW output at PUN
    Puntledge, 1 unit, 24 MW total
  19. What are the major environmental concerns with Puntledge
    • Gauge 6
    • Min Flow when between 5.1 (6cms BC Hydro)-19.8cms
    • Above 19.8 there is no restriction
    • Ramp Rates 2.8cms/hr (hard limit) 2.5cms/hr (BC Hydro limit)
    • Gauge 8
    • minimum flow and ramp rates
  20. How many units and total MW output at JHT
    John Hart, 6 units, 126MW
  21. What are the major environmental concerns at John Hart
    • Ramp Rates and Minimum Flows
    • generation can't go more then 3 MW below plant total instructed level
    • if it does, operator must take corrective action (increase generation on other units or call the duty electrician to spill)
  22. What big plants have fisheries or environmental issues
    Rev, Pcn
  23. What is the concern with elko
    maintaining headpond level when flashboards are installed