What type of specifications specifies the manufacture's name/brand name?
CLOSED
-
How many percent of the contract amount is the Payment Bond?
15%
-
In the Architect's Code of Ethics , to whom does the Architect have responsibility to consider needs and aesthetic and functional requirements?
CLIENT
-
Building Administrators are compensated based on:
% of gross monthly rentals
-
Developing a plan of action in a logical that can be displayed graphically as a project planning diagram.
SCHEDULING
-
To keep info.flowing among members of the project team and management:
MANAGING COMMUNICATION
-
What is an additional info. On contract documents issued to bidders before date of bidding:
BID BULLETIN
-
Under BP.344 , Which of the following in NOT generally considered as a basic Physical Planning?
DURABILITY
-
Who sign and seals as-built architectural plans,which are required for obtaining a certificate of occupancy?
ARCHITECT
-
SPP Document replaced the ____ ,
1979 UAP DOCUMENTS
-
The___ printed documents stipulating the procedural and administrative aspects of the contract?
THE GENERAL CONDITION
-
How are projects classified in determining the basis for the Architects Basic Fee?
DEGREE OF PROJECT COMPLEXITY
-
A per diem of not less than ___ plus traveling & living expenses shall be chargeable to the Owner on any occasion where the architect or his duly authorised representative shall be required to perform services at a locality beyond the radius of ___ kilometers from his established office.
500.00 / 50 KILOMETERS
-
Which of the following does NOT constitute the post-construction services of the architect?
REAL PROPERTY EVALUATION
-
For Socialized Housing Projects, minor inter-connecting roads should have a minimum ROW of _____ METERS?
6.5 mts.
-
In PD.1096 ,which condition does not indicate dangerous buildings / structures?
ILLEGAL CONSTRUCTION
-
What is refered to as an outline specifications enumerating the type or trade names of materials to be used?
SCHEDULE OF MATERIALS AND FINISHES
-
This shall be issued by the Owner to the Contractor following the execution of the Contract Agreement?
NOTICE TO PROCEED
-
It was created through Executive Order no. 90. It is the highest policy -making and coordinating office on shelter programs.
HUDCC - housing & urban & dev't. Coordinating council
-
What government entity is responsible in regulating the practice of architecture?
PRC-PRBOA
-
Does a registered and licensed architect mean one and the same?
Yes , an architect must be both licensed and registered
-
Can the term "Architect" & Architect - of - Record " be used Intercharngeably?
No , the Architect is a generic word while AoR is a specific function of a professional architect
-
Will the Architect -of- Record be criminally liable with regards to the plans,projects, and contracts he signed and sealed ?
Yes , AoR assumes the Civil Liability
-
If there are two Architects on a certain project , the Architect -of- Record and the Architect -in-Charge of construction , the building collapses , who is more liable?
It depends on the investigation
-
Can an Architect be the Architect -of- Record and Architect-in-Charge of construction at he same time?
Yes , it is Possible
-
In case of death of the Architect -on-Record ,who can give official provisions to reproduce his / her plans?
Nobody
-
Is it possible for a person who earned a degree in Architecture to take up a Master 's degree in Architecture even if he has yet to become a board passer?
Yes, a bachelor's degree in Architecture is enough.
-
If a successful examinee was convicted by a lower court of a crime involving moral turpitude and has appealed the case to a higher court, can he/she be refused the issuance of a Certificate of Registration?
Yes,the board has the power to refuse issuance.
-
Who will be liable for seeking and soliciting architectural works by a non registered person?
Both the represented & the representative the employer & the emoloyee , All the above
-
Is a partner in an architecture firm liable when an architect-of-record in an architectural firm commits malpractice?
Ye , he will also be liable
-
Where does Physical Planning service fall?
SPECIALIZED ALLIED SERVICES , SPP 203
-
Under what type of services is " sound insulation treatment " ?
SPECIALIZED ALLIED SERVICES , SPP 203
-
In what phase of the architectural design services does the study is conducted?
PRE-DESIGN SERVICES , SPP 201
-
In what type of services do making of brochures / leaflets / fliers / posters and promotional & advertisement campaign are included?
PRE-DESIGN SERVICES , SPP 201
-
What Architectural Service / Phase is the part where the Architect and Client choose the Contractor?
BIDDING/NEGOTIATION PHASE
-
At what stage are specifications done?
CONTRACT DOCUMENT PHASE
-
After completion of working drawings, specifications and other documents and upon submission to client, what stage is next?
CONTRACT DOCUMENT PHASE
-
If an Architect assumes the function of going to the project site for monitoring and supervision,what services is being provided?
CONSTRUCTION MANAGEMENT, SPP205
-
For Specialized allied services, what is the aesthetic designing of the space of a structure?
ARCHITECTURAL INTERIOR SERVICES
-
Which is an unethical action with respect to the Architects responsibility to the people?
TAKE PART IN PAID ENDORSEMENT OF BUILDING MATERIAL
-
You were commissioned to do a Master Plan, What should you do first?
STUDY THE EXISTING LAWS
-
What do you call the person or group appointed by the owner after the completion of the building?
BUILDING ADMINISTRATOR
-
Who does the Architect approach for sound control?
ACOUSTICS ENGINEER
-
For Specialized Allied Services, what is the activity of total planning that encompasses social, physical and environment factors
COMPREHENSIVE ARCHITECTURAL SERVICES ,SPP 206
-
It is the most common method of compensation which is also fair to both client and architect?
PROFESSIONAL FEE plus EXPENSES
-
Mr. Juan dela Cruz commissioned you for a Restaurant project last year. Due ti the success of the restaurant , he wants you to do a 2nd Restaurant using the Same design.Based on the old 1979 SPP , What would be your fee?
80% of Basic Fee
-
A client wanted your services for his New House with a total project cost of Three Million(3,000,000.00) pesos.Based on the 1979 SPP ,What is percentage of your professional fee?
10% of PCC
-
If the Owner continuously order changes to the design, what methods of compensation should be used?
PERCENTAGE FEE AND COST METHOD
-
If an Architect is hired to design a Super Market with construction cost of less than P50M,How much should he/she charge as minimum basic fee based on the old 1979 SPP
7% of PCC
-
If an Architect performs Full Time Supervision,what is his professional fee based on old 1979 SPP
1-1.5% of PCC
-
which among the following should the Architect's fee be NOT be based?
A. Client profile directory
-
How is the Architect renumerated under Design-Build by maximum cost?
7% inclusive of arch.regular fee as per old 1979 SPP
-
What is the percentage of payment for Construction Management based on old 1979 SPP
1.5 - 3% of PCC
-
Who determines time and cost for the project?
OWNER
-
Who gives the directive to start the project?
OWNER
-
Who is responsible for shortening the time and lessening the cost of the project
CONSTRUCTION MANAGER
-
Who is responsible for the soil investigation of the project?
OWNER
-
How many sets of plan are to be given/submitted to the owner?
7 sets
-
What is the difference between RA 545 and RA 9266 in terms of architectural practice?
STRUCTURAL CONCEPTUALIZATION
-
Plans , models and perspectives are
DOCUMENTS FOR PRESENTATION
-
What do you call Working Drawings , Specifications , Estimates and General Conditions?
CONTRACT DOCUMENTS
-
An Architect refuses to give the original plan to the Owner . Why
- A. The owner is entitled only to the blueprint
- B. The architects work is covered by intellectual property rights/law
- C.In order to prevent the Owner from making duplicates and/or constructing without his knowledge
- D.All of the Above
-
You had a residential project for a Client.After the construction,you found out that the Client used your design for another project without your consent.What will you do?
File a case in court
-
Before submitting sketches to a client , what must the first do?
Sign a service agreement
-
A person found preparing architectural plans without the necessary license is guilty of what?
MISDEMEANOR
-
What offense is committed when an architect is found using the seal of another architect?
MISDEMEANOR
-
What offense is committed if a person uses the name of another architect in his practice without the consent of the latter?
MISDEMEANOR
-
The PRC will not issue the Certificate of Registration to a successful examinee if he commits one of the following?
IMMORAL ACT
-
After an expiration of how many years from the date of revocation and upon application and for reasons deemed proper and sufficient , reinstate the validity of a revoked certificate of registration?
2 years
-
Which is an ethical action with respect to the Architect's responsibility to his manufacturer's dealers and agents?
- A. Accepts market discounts credited to
- Client
|
|