-
Who is the Damage Control officer?
CDR Harry
-
Who is the Damage Control Assistant? DCA
LCDR Hoffman
-
Who is the Assistant Damage Control Assistant? ADCA
CWO2 Barfield
-
Who is the ship's fire marshal?
ENS Stephens
-
What are the four stages of a fire?
- Growth
- Fully Developed
- Flash over
- Decay
-
How many GPM and PSI is the P-100 pump rated at?
-
How long does the P-100 pump last?
2.75 hours
-
What are the two standard hoses we have onboard?
-
What does PECU stand for?
Portable exothermic cutting unit
-
What is the PECU used for?
To access difficult spaces to combat fires or rescue personnel
-
How is the PECU operated?
- battery powered
- oxygen driven
-
What is the GPM of the nozzles inside the ship?
95 GPM
-
What is the GPM of the nozzles outside the ship?
125 GPM
-
What type of NFTI do we have onboard?
K90 Talisman
-
Can the NFTI see through glass?
No
-
What are the two types of batteries used on the NFTI and their hours of operation?
- Rechargeable - 4.85 hours
- AA - 3.05 hours
-
What two PKP sizes are onboard?
-
What is the range and time limit of the 18 lb PKP bottle?
-
What is the range and time limit of the 27 lb PKP bottle?
-
What size CO2 bottles do we have onboard?
15 lb
-
What is the range and time limit of the 15 lb CO2 bottle?
-
How many gallons does the portable AFFF hold?
2.5 gallons
-
What is the range and time limit of the portable AFFF?
-
SCBA: What is the purpose of the 1st stage regulator?
reduces the PSI down to 100 PSI
-
SCBA: What is the purpose of the 2nd stage regulator?
reduces the PSI down to .5 PSI
-
How many fixed CO2 flooding systems to we have onboard and where are they?
- 6
- located in all flameable storerooms
-
How do you activate the fixed CO2 flooding system?
- Break Glass
- Pull red T-handle until you see red on the cord
-
What are the two lights indicating on the fixed CO2 flooding system?
- White = power available
- Red = system activated
-
What are the two plugers for on the fixed CO2 flooding system?
- 1st = alarms
- 2nd = ventilation shut down
-
How does the fixed CO2 flooding system combat fires?
Displaces oxygen
-
What is the HALON 1301 pressurized by?
nitrogen
-
What two locations can you activate the HALON 1301 system?
local and remote
-
How do you activate the HALON 1301 system?
- break tamper seal
- pull pin
- squeeze on the handle of the fixed 5lb CO2 bottle
-
How many HALON 1301 stations do we have?
8
-
What are the three plungers for the HALON 1301 system?
- 1st - alarms
- 2nd - ventialation shut down
- 3rd - halon discharged
-
If HALON 1301 is not discharging, what do you do?
Activate by opening time delay bypass valve
-
At what temperature does the Halon bottles decompose at?
900 degress
-
What two gases does HALON decompose into?
- Hydrogen Bromide
- Hydrogen Fluoride
-
How does HALON 1301 combat a fire?
breaks up the chemical chain reaction
-
How long do you allow the HALON to soak for, for a good Halon discharge?
- 15 minutes soak time
- 15 minutes vetillation time
-
What is the response time for the M-8 paper?
20 seconds
-
Where is the comparrison chart for the M-8 paper?
Inside cover of the booklet
-
What is the response time for the M-9 paper?
10 seconds
-
How many sample detectors are there in the M256A-1 kit?
12 sample detectors
-
What are the M-291?
Charcoal sheets
-
What is the purpose of the M-291?
To clean personnel through physical removal, absorbtion, and neutralization
-
For K type shoring to be effective, what angle do they have to be at?
Between 65 and 90 degrees
-
What is the soak time for the EWARP patch?
20 seconds
-
What is the cure time for the EWAP patch?
30 minutes
-
What are the two sizes of EWARP patches?
-
What type of flooding is from space to space?
progressive flooding
-
Where is Repair Locker 2 located?
Near female enineering berthing
-
Where is Repair Locker 4 located?
Aft of dispatch
-
Where is Repair Locker 5 located?
Near aft port side chow line
-
Where is Repair Locker 3 located?
Port side supply male berthing
-
What are the duties of the Ship's Fire Marshal?
- Overall incharge of the Rapid Reponse Team
- Inspect for daily fire hazards, hot/cold work chits, and responsible for gas free engineering program
-
Explain X-Ray material condition
Condition is set when the ship is in almost no danger of attack or natural hazard
-
Explain Yoke material condition
Condition yoke is set and maintained at sea, when entering or leaving port during peacetime, in port during peacetime
-
Explain Zebra material condition
Set during general quarters and any time the ship is in danger such as that caused by fire or flooding
-
If a fitting has to be left open, where should it be logged?
The Closure Log and logged daily
-
What are the three ways to tell if an EEBD has expired?
- Ball bearing is missing
- Guage is NOT in the green
- Expiration date has passed
-
What is the shelf life of the EEBD?
15 years
-
How many Hazard Secerity levels are there?
4
-
What is Hazard Severity level I
Catastrophic (death, loss of asset)
-
What is Hazard Serveity level II
Critical (severe injury or damage, significantly degraded mission capability)
-
What is Hazard Severity III
Marginal (minor injury or damage)
-
What is Hazard Severity IV
Negligible (minimal injury or damage)
-
How many levels of Mishap Probability are there?
5
-
What is Mishap Probability A
Frequent - continuously experienced
-
What is Mishap Probability B
Likely - will occur frequently
-
What is Mishap Probability C
Occasionally- will occur several times
-
What is Mishap Probability D
Seldom - unlikely; can be expected to occur
-
What us Mishap Probability E
Unlikely - improbable; but possible to occur
-
When will DCTT conduct a walkthrough before drill?
One hour prior
-
What closures can be opened/closed during GQ without requiring permission?
Circle X and Circle Y
-
What is the captain's battle circuit?
JA
-
What is the primary damage control circuit outgoing from DCC?
2JZ
-
What is the circuit for 1F, 1B, and 1A?
3JZ, 3JZ2, 3JZ3
-
What is the circuit for repair locker 2?
4JZ
-
What is the circuit for repair locker 3?
5JZ
-
What is the circuit for repair locker 4?
6JZ
-
What is the circuit for repair locker 5?
7JZ
-
What are the circuits for 7F, 7B, 7A?
11JZ1, 11JZ2, 11JZ3
-
What is the damage control intercom sys?
4MC
|
|