SPE 7/12/19 Day 2<

  1. Image Upload 2
    2 thrust bearings and runner
  2. Image Upload 4
    additive mfg visit
  3. Image Upload 6
    ball and seat auto lapping
  4. Image Upload 8
    ball and seat for gl valve
  5. Image Upload 10
    cable slot
  6. Image Upload 12
    casing for gl external pressure test
  7. Image Upload 14
    choke filters ac signals
  8. Image Upload 16
    compensator at top and bottom
  9. Image Upload 18
    diaphragm pump
  10. Image Upload 20
    dipping core
  11. Image Upload 22
    dumping sand
  12. Image Upload 24
    EDM to make pocket
  13. Image Upload 26
    encap mixers 2 hours
  14. Image Upload 28
    encap vesell and mixer
  15. Image Upload 30
    gas lift autoweld
  16. Image Upload 32
    gl mandrel test bay
  17. Image Upload 34
    gl furnace
  18. Image Upload 36
    latch allow kot pin breaks ring moves
  19. Image Upload 38
    mandrel out of furnace
  20. Image Upload 40
    mcm
  21. Image Upload 42
    oval gl mandrel
  22. Image Upload 44
    pouring into ladle
  23. Image Upload 46
    pressure gauge
  24. Image Upload 48
    pressure gauge
  25. Image Upload 50
    raw sand sucked up tube
  26. Image Upload 52
    round gl mandrel
  27. Image Upload 54
    sand testing line
  28. Image Upload 56
    testing stages
  29. Image Upload 58
    thrust pad
  30. Image Upload 60
    to align kick over tool
  31. Image Upload 62
    wax insert room
  32. Image Upload 64
    xt150 most common gauge
  33. Image Upload 66
    zeitecs-shuttle faster
Author
Jared023
ID
347940
Card Set
SPE 7/12/19 Day 2<
Description
als
Updated