SPE 7/11/19 Day 1

  1. Image Upload 2
    • 1.pump
    • 2.Gas Handler
    • 3. ESP gauge
    • 4. Protector
    • 5. Motor
  2. Image Upload 4
    • 1. Core
    • 2. Casting
    • 3. Machined
  3. Image Upload 6
    Top, bottom, middle
    • 1. Drag
    • 2. Cope
    • 3. Core
  4. Image Upload 8
    Diffused vanes
  5. Image Upload 10
    What do these add?
    • 1. makes smoother
    • 2. heat resistant
  6. Image Upload 12
    shroud removed
  7. Image Upload 14
    Vane inserts
  8. Image Upload 16
    Core tooling
  9. Image Upload 18
    what are nozels?
    burners
  10. Image Upload 20
    automated tray removal
  11. Image Upload 22
    assembled cores
  12. Image Upload 24
    Vane inserts
  13. Image Upload 26
    automated vane inserts
  14. Image Upload 28
    auto clean and dip
  15. Image Upload 30
    curing oven
  16. Image Upload 32
    impeller cores
  17. Image Upload 34
    assembled cores
  18. Image Upload 36
    pouring
  19. Image Upload 38
    cope and core (double)
  20. Image Upload 40
    loading cores
  21. Image Upload 42
    pattern plate
  22. Image Upload 44
    waiting to be poured
  23. Image Upload 46
    Pulling gas out of cold core
  24. Image Upload 48
    pattern plates in tool room
  25. Image Upload 50
    finished esps
  26. Image Upload 52
    Protectors (chambers)
  27. Image Upload 54
    rotor bearing
  28. Image Upload 56
    terminal block
  29. Image Upload 58
    metal bellow
  30. Image Upload 60
    straightener
  31. Image Upload 62
    storage carousel
  32. Image Upload 64
    changes chuck sides
  33. Image Upload 66
    60 ton press, lams into housing
  34. Image Upload 68
    pins and 2 phases done
  35. Image Upload 70
    heating for epoxy
  36. Image Upload 72
    putting on motor leads
  37. EDB
    Economic Development Board
  38. CI Champ
    Jason
  39. ME in stages (from Re-think)
    Ribhav
  40. Most common flow
    mixed
  41. Common core setup
    • Top
    • Vein
    • Bottom
  42. S8000 means
    8000 bpd
  43. Cold Core (3)
    • 1. Binders
    • 2. More accurate
    • 3. Cures with gas
  44. 3 steps to stage
    • 1. Tooling
    • 2. Core.
    • 3. Stage
  45. How long is life of tooling?
    40,000 runs
  46. SWTC
    Singapore Well Testing Center
  47. PPCS
    Pressure Pumping and Chemical Singapore (coiled tubing/cement)
  48. Man hours/stator
    40
  49. Government agency helping develop automation
    Simtech
  50. Girl from Rethink
    Minjin
  51. # of slots
    18
  52. 3 types of protectors
    • 1. bag
    • 2. metal bellows
    • 3. labyrinth
  53. VGSA
    Vortex Gas Separator Assembly
Author
Jared023
ID
347863
Card Set
SPE 7/11/19 Day 1
Description
SPE
Updated