SPE 7/11/19 Day 1

    • 1.pump
    • 2.Gas Handler
    • 3. ESP gauge
    • 4. Protector
    • 5. Motor
    • 1. Core
    • 2. Casting
    • 3. Machined

  1. Top, bottom, middle
    • 1. Drag
    • 2. Cope
    • 3. Core
  2. Diffused vanes

  3. What do these add?
    • 1. makes smoother
    • 2. heat resistant
  4. shroud removed
  5. Vane inserts
  6. Core tooling

  7. what are nozels?
    burners
  8. automated tray removal
  9. assembled cores
  10. Vane inserts
  11. automated vane inserts
  12. auto clean and dip
  13. curing oven
  14. impeller cores
  15. assembled cores
  16. pouring
  17. cope and core (double)
  18. loading cores
  19. pattern plate
  20. waiting to be poured
  21. Pulling gas out of cold core
  22. pattern plates in tool room
  23. finished esps
  24. Protectors (chambers)
  25. rotor bearing
  26. terminal block
  27. metal bellow
  28. straightener
  29. storage carousel
  30. changes chuck sides
  31. 60 ton press, lams into housing
  32. pins and 2 phases done
  33. heating for epoxy
  34. putting on motor leads
  35. EDB
    Economic Development Board
  36. CI Champ
    Jason
  37. ME in stages (from Re-think)
    Ribhav
  38. Most common flow
    mixed
  39. Common core setup
    • Top
    • Vein
    • Bottom
  40. S8000 means
    8000 bpd
  41. Cold Core (3)
    • 1. Binders
    • 2. More accurate
    • 3. Cures with gas
  42. 3 steps to stage
    • 1. Tooling
    • 2. Core.
    • 3. Stage
  43. How long is life of tooling?
    40,000 runs
  44. SWTC
    Singapore Well Testing Center
  45. PPCS
    Pressure Pumping and Chemical Singapore (coiled tubing/cement)
  46. Man hours/stator
    40
  47. Government agency helping develop automation
    Simtech
  48. Girl from Rethink
    Minjin
  49. # of slots
    18
  50. 3 types of protectors
    • 1. bag
    • 2. metal bellows
    • 3. labyrinth
  51. VGSA
    Vortex Gas Separator Assembly
Author
Jared023
ID
347863
Card Set
SPE 7/11/19 Day 1
Description
SPE
Updated