Home
Flashcards
Preview
004
Home
Get App
Take Quiz
Create
What is a CG-3788 B?
Enlisted employee review worksheet bubble sheet
AFFF Ratio
Old 94% water and 6% AFFF
We use now 97% Water and 3% AFFF
Wherer is the garrison cap placed when not worn?
Under the belt on the right side with the CG insignia facing out
If person who attached the Danger tag is unavailable who can remove it?
CO can designate the EO or OPS to clear tags
Can the instrument be used if an out-of-commission label is used?
Nope
What pattern on the vari-nozzle is used for electrical fires?
Fog
What is an out-of-calibration label?
Orange label used to identify instruments that are out-of-calibration and are not reliable
Who can remove a danger tag?
The person attaching the tag shall be the only one or EO or OPS w/CO approval
How wide is a PEL line?
4 inches
What does "PP"" symbol represent in EAL?
Parts Pending
Minimum separation between black shielded cables and a red processor?
5 cm (2")
Minimum separation between black shielded signal cables and red cables?
5 cm (2")
Minimum separation between a black cable exiting inspectable space and red cables?
5 cm (2") or 15 cm if in parallel runs over 30 meters
Minimum separation between black unshielded signal cables and red cables?
15 cm (6")
Minimum separation between black unshielded signal cables and a red processor?
15 cm (6")
Minimum separation between red/black equipment without a common cabinet?
30 cm (1 foot)
Minimum separation between a telephone and red data processing equipment?
1 meter (39")
Minimum separation between a RF transmitter and red cables?
1 meter (39")
Where can you use a 100 feet extension cord?
Only on flight deck, Hanger, Well decks. Floating dry dock.
Where would you find RADHAZ Control drawings for cutters and shore units?
NE-TIMS
Naval Engineering Technical Information Management System
What size RADHAZ signs are used for normal shipboard use?
5 inches
What is a type 1 bond strap?
Corrosion resistant steel 1/4" wire rope w/lugs
What is a type IV (4) bond strap?
Flat copper braid
What is a type II (2) bond strap?
Flat copper resistant steel with mounting holes.
RF impedance across a type 1 bond at 30 MHz?
Less than 25 ohms
Type 3 (III) bond strap
Flat Copper
How often are ESD assessment "spot checks" by base C4IT Leadership?
Annually during years that a LCI is not performed.
CG-5269
Report of Survey form
What are the minimum standards for CG handheld radios?
Intrinsically safe and be certified for class I, Division 1, and Groups D,F, and G operation.
Who is responsible for the overall adherance to the tool control program?
ESD Supervisor and ESD Maintenance Supervisor
When should the technical assessment be conducted?
3-6 months prior to the Long Range Maintenance Plan (LRMP) review
On the ESD inspection checklist what must a section average to get a passing grade?
An average of 70% or higher in any system
Who is the technical authority for OSI?
FORCECOM
When shall large antennas be replaced?
6 year cycles dockside
What is the reccomended frequency for an ALMIS MDL auto report generation?
Weekly
EAL Symbol "!" means what?
In discrepancies status column it indicates a deferred maintenance discrepancy over 30 days. Also indicates action required
Who can permanently delete a discrepancy?
A maintenance releaser can restore and/or permanently delete a discrepancy.
Required action addresses on CASREPs?
Senior Operational Commander
Immediate Operational Commander
Servicing Product Line Manager
When should ESD Supervisors notify C4IT department of discrepancies upon ESD relief?
Within 1 week of relieving the ESD Supervisor
How often are visual technical inspections?
Upon new installation, construction, or modernization of red/black equipment
What are maintenance tasks considered while in an extension status?
overdue
When shall electronic discrepancies in EAL be addressed by the ESD Maintenance Supervisor (MS)?
Within one business day
When is the ESD Supervisor notified of an upcoming assessment?
Assessment team leader informs ESD supervisor at least 30 days prior.
How often are ESD assessments?
Annually
How long does a unit have to verify SPETERL validation package?
2 weeks
Who approves maintenance discrepancies that exceed 30 days for C4IT assets?
Maintenance Officer
The request to cannibalize a small boat must be routed through who?
Sector Engineering Officer
What is considered to be a temporary system for Tempest purposes?
Systems installed for less than 60 days. No Tempest related requirements.
How often are Tempest accreditations?
5 years from initial and every 5 years after that.
When are action plans to correct discrepancies submitted by ESD supervisor to ESU/C4IT?
30 days
Author
ccliff23
ID
346691
Card Set
004
Description
004
Updated
2019-04-25T15:16:54Z
Show Answers
Home
Flashcards
Preview