MG82

  1. XTL 5000 HIGH power requirements
  2. XTL 5000 LOW power requirements
  3. XTL 5000 IFR test: Speak into microphone in a clear loud voice giving a ten count and deviation is 1kHz; what do you do?
  4. What branch does not have CWO?
    US Air Force
  5. What is the form number for antenna resistance checks?
  6. Port 2 on 29' MFD?
  7. Number of tag-out logs kept on cutters?
  8. Safety observer must remain within what distance of the climber?
  9. What are the 2 types of weather proofing sleeves?
  10. What type of equipment is GIMCP not used for?
  11. What type of equipment is GIMCP not used for?
  12. Year all ratings opened for women?
  13. How long do you keep Tag-Out logs?
  14. CO can give permission to whom to remove Danger Tags?
  15. How many volts for "danger high voltage" sign?
  16. Let-go current?
  17. Electronic equipment owned and managed by the ELC
  18. What is the life expectancy of the 2-2-1 weatherproofing method?
  19. Coast Guard classifies VHF frequency
  20. Shorting probe voltage rating?
    25,000 volts
  21. Rubber gloves voltage rating?
  22. Rubber floor matting rating?
  23. 2x PEL limit
  24. 3x PEL limit
  25. How do you reinstall transducer bolts?
  26. Who cannot you not get underway without?
  27. What cutter rammed a submarine?
    • The USCG Paulding
    • December 17, 1927 USS S-4
    • and USCGC Campbell
    • 22 February, 1943 U-606
  28. When does a member receive a special set of marks?
  29. Weatherproofing temp range?
  30. Tool control is managed by who?
  31. What CASREP category does the CG not use?
    1
  32. What does a 96 code on a piece of test equipment mean?
  33. Never use vulcanizing tape below what temp?
  34. The MRC Codes:
    D
    W
    M
    Q
    S
    A
    C
    R
    • D=Daily
    • W=Weekly
    • M=Monthly
    • Q=Quarterly
    • S=Semi-annual
    • A=Annual
    • C=Overhaul Cycle
    • R=Situation Requirement
    •      (100 hr., prefiring, prior
    •       to getting underway, etc.)
  35. When a single maintenance requirement
    has need for more than one penodicity they will be numbered as “Q-lR”, “M-lR”, “M-2 R”, etc.; the “R;’ in the case meaning “______,” indicates a situation that is defined in an accompanying note.
    Related
  36. In cases where classification

    of an individual MRC is required due to content, the following entry is found in the “Procedure” block: “Maintenance Procedure with this requirement is CLASSIFIED. _________"
    MRC is stowed in _____"
  37. The completed MRC Quarterly Schedule shall be signed by the __________ in the
    “____________” block.
    Department Head

    “Quarter After Overhaul” block.
  38. At the end of each work week, the Work Center Supervisor will _________ all maintenance requirements on the MRC Quarterly Schedule that have been completed and will _______  afl requirements that were not accomplished.
    cross-out (X)

    circle (0)
  39. The _______________ is responsible for the rescheduling of all circled requirements on the MRC Schedule.
    Department Head
  40. Any MRC requirement which cannot be accomplished during the current quarter, in addition to being circled, shall be identified on the back of the _________ with the reason it was not accomplished.
    quarterly schedule
  41. The completed Quarterly Schedule is removed from the holder after the
    close of each ________ and retained as a Planned Maintenance record. This record may be discarded by ______, when the same number ______ after the next major overhaul has been completed, thereby providing a complete cycle of history.
    quarter

    quarters

    quarter
  42. The Weekly Schedule (____________), is a visual display of planned maintenance scheduled for accomplishment in a given Work Center during that week.
    OPNAV Form 4700/6
  43. The _____________________ provides a means for recording the expenditure
    of resources (men, material and time)
    associated with certain categories of maintenance

    actions.
    • Maintenance Data Collection System
    • (MDCS)
  44. This information is also retrievable for use in maintenance problem and logistic support analysis and for developing a Current
    _______________ file which will assist
    in improving the planning and coordination of the ship’s workload.
    Ships Maintenance Project (CSMP)
  45. Using a Work Supplement  Card to document the delay code __ will be used to show the delay status from that work center WPL & C reports.
    00
  46. Multiple Units. Multiple Unit work
    requests on items such as binoculars, printing, photographing, plaques, sound-powered phones, clocks, etc., are permitted by using the words “______” or “______” in block 9 of the work request submitted on
    a 4790/2K form. Block 9 of the pre-punched 4790/2F card will always be blank when associated with this type work request. These multiple items will always be documented as a single maintenance action unless rejection of individually serialized items is involved.
    “various”

    “miscall”
  47. What is a good reading for a CEMT 390 HF antenna?
  48. Completion of a work request can be reported using the 4790/2F and entering
    the code’’__” in block G.
    3O
  49. The FSN is generally found in the ______________ within the Allowance
    Parts List/Allowance Equipage List (APL/AEL) for the equipment/component being worked on. When only the part number is known, the NSN may be obtained from the ________________.
    Coordinated Shipboard Allowance List (COSAL)

    Master Cross Reference List (MCRL)
  50. When an item is identified only by the Manufacturer’s Part Number for which no NSN has been assigned, the part number preceded by the _______________ will be entered.
    • Federal Supply Code
    • of Manufacturers (FSCM)
Author
CDMT
ID
338859
Card Set
MG82
Description
GS2000
Updated