ATS 6 ORM

  1. What does ORM stand for?
    Operational Risk Management
  2. How many parts are in the ORM Process? What are they?
    • 3
    • Decision making process at all levels
    • Increases the ability to make informed decisions
    • Minimizes risk to acceptable levels
  3. How many ORM principles are there? What are they?
    • Accept the risk only when the benefits outweigh the costs.
    • Accept no unnecessary risk.
    • Anticipate and manage risk by planning.
  4. How many ORM Process levels are there? What are they?
    • 3
    • Time critical
    • In depth
    • Deliberate
  5. What is the 5 step flow of the ORM Process?
    • Identify the hazards
    • Assess the risks
    • Make risk decisions
    • Implement controls
    • Supervise
  6. How many categories of Hazard Severity are there? What are they?
    • 4
    • CAT I – May cause death, loss of asset or result in grave damage
    • CAT II – May cause severe injury
    • CAT III – May cause minor injury
    • CAT IV – Presents minimal threat
  7. What are the subcategories of Mishap Probability?
    • A – Likely to occur
    • B – Probably will occur in time
    • C – May occur in time
    • D – Unlikely to occur
  8. What does RAC stand for?
    Risk Assessment Codes
  9. What are the Risk Assessment Codes?
    • 1-Critical
    • 2-Serious
    • 3-Moderate
    • 4-Minor
    • 5-Negligable
  10. What is a Hazard?
    A condition with the potential to cause death, injury equipment damage, or mission degradation.
  11. What is a Risk?
    Chances of adverse outcome or bad consequences; such as injury, illness, or loss.
  12. What is a Risk Assessment?
    A process of detecting hazards and assessing risks.