API 510 WHO DOES IT?

  1. Who responds to any inspection results that require corrective action?
    The owner/user.

    Reference 1.1.2
  2. Who decides if API exempted vessels are to be included in the inspection program?
    The owner/user

    Reference 1.2.2
  3. Who holds the overall responsibility of complying with API 510?
    The Owner/user

    Reference 4.1.1
  4. Who is responsible to develop a QA Inspection/Repair Management system?
    The owner/user

    Reference 4.1.2
  5. Who is required to take a Jaeger J-1 eye test?
    The inspector.

    Reference 4.1.2
  6. Who is responsible to develop an effective MOC process?
    The owner/user.

    Reference 4.1.3
  7. Who is responsible to develop a program for Integrity Operating Windows?
    The owner/user

    Reference 4.1.4
  8. During repairs and alterations, who is responsible for quality control?
    The repair organization

    Reference 4.3
  9. Who is responsible to assure the owner that the testing, inspection, repairs, and examinations (TIRE) meet code?
    The inspector

    Reference 4.4
  10. Who is directly involved in inspection activities?
    The inspector

    Reference 4.4
  11. Who evaluates and accepts NDE examination results?
    The inspector

    Reference 4.4
  12. Who makes recommendations for repairs, replacements, or fitness for continued service?
    The inspector

    Reference 4.4
  13. Who performs NDE in accordance with specs?
    The NDE Examiner

    Reference 4.5.1
  14. Who determines the qualification requirements for persons performing NDE?
    The owner/user

    Reference 4.5.2
  15. Who maintains the NDE examiner's certification records?
    The Techs employer

    Reference 4.5.3
  16. Who notifies the inspector or engineers of vessel integrity issues?
    All others

    Reference 4.6
  17. Who establishes a tracking system for inspection audit findings?
    The owner
  18. Who develops the inspection plan for vessel and relief devices?
    The Inspector AND/OR engineer
  19. Who chooses to conduct RBI assessments?
    The owner
  20. Who reviews prior vessel history prior to inspections?
    The inspector
  21. Who needs to familiarize themselves with characteristics and causes of potential damage mechanisms?
    The inspector
  22. Who approves deviations from an inspection plan?
    The Inspector OR engineer
  23. Who performs the internal inspection?
    The inspector
  24. Who can assist with the internal inspection?
    Qualified other
  25. Who determines if it's necessary to remove deposits or linings?
    The inspector AND corrosion specialist
  26. Who performs on-stream inspections?
    The Inspector OR NDE examiner
  27. Who must approve on-stream inspection work performed by examiners?
    The inspector
  28. Who specifies the training requirements for non-AI's (inspectors) who perform external inspections?
    The owner/user
  29. Who accepts non-inspectors to perform externals?
    The inspector
  30. Who notifies the inspector of any vessel deterioration found?
    All others
  31. Who performs external inspections?
    The inspector OR qualified others
  32. Who takes thickness measurements?
    The inspector OR NDE examiner
  33. Who reviews corrosion data for possible anomalies?
    The INspector
  34. Who reviews corrosion data if short-term corrosion rates vary significantly?
    The inspector AND corrosion specialist
  35. Who assures those taking thickness measurements are trained and qualified?
    The owner
  36. Who must be aware of CUI suspect areas? And that CUI is unpredictable?
    The inspector
  37. Who must be aware CUI can be localized and doing UT's during internals may be unsuccessful?
    The inspector
  38. Who determines locations of CMLs for vessels with localized corrosion?
    The corrosion specialist
  39. Who gets involved if the number of CMLs will be significantly reduced or eliminated?
    The corrosion specialist
  40. Who determines the type of expected damage and selects an NDE method?
    The inspector and Corrosion specialist OR engineer
  41. Who specifies when qualified UT angle beam examiners are needed?
    Owner
  42. Who should be aware of sources of measurement inaccuracies during NDE?
    The inspector and NDE examiner
  43. Who reviews the use of a component pressure test in lieu of complete vessel hydro?
    The engineer
  44. Who determines the pressure for tightness test?
    Owner
  45. Who verifies the water quality and that the vessel is drained and dried before/after a hydro of 300 SS?
    The inspector
  46. Who reviews the potential risks of a pneumatic pressure test?
    The engineer
  47. Who develops pneumatic pressure test procedures?
    The engineer
  48. Who approves substituting NDE for a pressure test after alteration or major repair?
    The Inspector AND engineer
  49. Who determines if a pressure test is needed after a non-major repair?
    The inspector
  50. Who verifies new materials for repairs and alterations comply with those specified?
    The inspector
  51. Who PMIs new materials during repairs and alterations?
    The inspector OR NDE examiners
  52. Who determines the sampling percentage when verifying new materials?
    The inspector OR owner
  53. Who selects the amount of additional PMI to do when wrong material is found in existing vessel?
    The inspector
  54. Who assesses preferential corrosion in welds?
    The inspector
  55. Who assess's crack like flaws and environmental cracking?
    The engineer OR corrosion specialist
  56. Who inspects new vessels at the time of installation?
    The inspector
  57. When the vessel owner and location change, who checks to see if adequate documentation is provided?
    The inspector
  58. Who determines the external inspection interval?
    The inspector OR engineer
  59. Every 10 years, who reviews and approves the RBI assessments with intervals beyond 10 years?
    The inspector AND engineer
  60. Who determines the external inspection requirements for retired by in place equipment?
    The owner/user
  61. Who determines the internal/on-stream inspection interval?
    The Inspector OR engineer
  62. Who approves the use of on-stream inspection in lieu of internal?
    The inspector
  63. Who maintains a fully documented QA process
    The PRD repair organization
  64. Who maintains a fully documented training program?
    The PRD repair organization
  65. Who determines the relief device interval?
    The Inspector OR engineer
  66. Who approvals the deferral of inspection tasks?
    The Inspector AND owner
  67. Who is able to defer relief device interval lesser 10% or 6 months without other approvals?
    The inspector
  68. Who approves the deferral of inspection repair recommendations?
    The inspector AND inspection supervisor
  69. Who changes or deletes inspection recommendations?
    The Engineer OR inspection supervisor
  70. Who selects which corrosion rate (short vs long) reflects the current conditions?
    The inspector
  71. Who selects which corrosion rate (short vs long) reflects the current conditions?
    The Inspector and Corrosion specialist
  72. Who estimates the corrosion rate for a new vessel or vessel with change of service?
    Corrosion specialist
  73. Who approves the thickness measuring procedure for readings for MAWP calc?
    The inspector
  74. Who uses Sect VIII Div 2 evaluation for pitting or LTAs?
    The engineer
  75. Who considers increasing the vessel required thickness for high consequence services?
    The engineer
  76. Who maintains vessel and relief device records?
    Owner
  77. Who has access to operating and maintenance records that affect vessel integrity?
    The inspector
  78. Who prepares equipment repair plans?
    The inspector OR engineer
  79. Who authorizes all equipment repairs? (Excluding Sect VIII Div 2)
    The inspector
  80. Who authorizes all repairs to Sect VIII div 2 vessels?
    The Inspector AND engineer
  81. Who authorizes alterations?
    The inspector AND engineer
  82. Who designates the hold point during repairs and alterations?
    Inspector
  83. Who provides general authorization of limited or routine repairs?
    Inspector
  84. For repairs, who approves all methods of design, material, WPS, NDE, and testing?
    Inspector OR engineer
  85. For major repairs, temporary repairs, and alterations, who approves the methods, materials, WPS, NDE, and testing?
    The inspector AND engineer
  86. Who approves all repair and alteration work at hold points?
    inspector
  87. Who approves all repair and alteration work at completion of work?
    the inspector
  88. Who approves all nozzle installations?
    the engineer
  89. During repairs and alterations, who decides if PMI is required due to questionable material documents?
    The inspector
  90. Who must be satisfied that the temporary repair is adequate for vessel continued service?
    the inspector and engineer
  91. Who allows temporary welded repairs to remain in place past "next opportunity"?
    The inspector AND engineer
  92. Who determines if a crack will not propagate from under a fillet weld patch?
    the engineer
  93. Who approves the use of fillet-welded patch repairs?
    The inspector AND engineer
  94. Who approves the design and documentation of full encirclement lap band repair?
    the inspector AND engineer
  95. Who determines if a crack will not propagate from under a full encirclement lap patch?
    The engineer
  96. Who authorizes the repair welding of cracks at stress concentrations?
    engineer
  97. For insert plate repairs, who approves the use of NDE procedures as alternate to RT?
    The inspector
  98. Who reviews the weld spacing when install an insert plate? (distance to existing welds)
    The engineer
  99. Who reviews and approves the repair procedures for SS cladding?
    The inspector AND engineer
  100. Who considers the atomic hydrogen mitigation for a repair plan of welding SS clad or Overlay?
    Engineer
  101. Who monitors the repairs made to SS cladding or overlay?
    inspector
  102. Who uses welders and WPS's qualified to Sect IX or specified construction code?
    Repair organization
  103. Who verifies that welding is done within the welders range and WPS range?
    Inspector
  104. Who maintains record of qualified WPS's and WPQ's?
    Repair organization
  105. Who do the welding records need to be available to prior to welding?
    The inspector
  106. Who approves exceptions to preheat temperatures?
    Engineer
  107. Who monitors preheat temperatures
    inspector
  108. Who develops a procedure for local PWHT in lieu of a full encirclement PWHT?
    Engineer
  109. Who reviews the use of preheat in lieu of PWHT?
    engineer
  110. WHo reviews the use of controlled deposit welding in lieu of PWHT?
    engineer
  111. Who verifies that PWHT alternatives used are in compliance with specs and code?
    inspector
  112. Who sets the NDE acceptance standards after welding is complete?
    Inspector OR construction code
  113. who approves the use of alternate NDE methods after repairs and alterations?
    Engineer AND inspector
  114. Who performs calculations for rerates?
    Engineer OR manufacturer/other
  115. The vessel rerate must be acceptable to who?
    engineer