LCS EOOW Board

  1. Gas Free Engineering NSTM
    074 Vol III
  2. JP-5 NSTM
    542
  3. Diesel Engines NSTM
    233
  4. Gas Turbine NSTM
    NSTM 234
  5. Heat Stress Reference
    OPNAVINST 5100.19 Chapter B-2
  6. When to conduct heat stress survey
    • @PHEL I-III & Watch <= 4 hrs: Space DB Temp > 100F
    • @PHEL I-III & Watch > 4 hrs: Space DB Temp > 90F
    • @PHEL IV-VI: Space DB Temp 85F or higher
    • Before ECC Drills if > 3 hrs
    • If a heat injury occurs
    • if CO requests
    • If required for follow-on survey
  7. When is follow-on heat survey required?
    • Where WB & DB Temperatures are NOT recorded each hour: At the end of each watch or work period until heat stress condition abates
    • Where WB/DB Temps are recorded each hour: Only when DB increases by 5F and/or WB increases by 3F
  8. Time Weighted Mean
    Allows watchstander to spend a longer total amount of time at watchstation provided there are breaks to enter an air conditioned space or booth
  9. DFM vs JP-5 Difference
    • DFM is paraffin-based (lubricant)
    • JP-5 is kerosene-based
  10. LCS 2 Lube Oil
    Mobil DEL-VAC 1640
  11. LCS Diesel Engine Oil Sampling Frequency
    • 1. Operating Engines (consult PMS card)
    • a. Daily: Viscosity or Fuel Dilution/Thickening
    • b. Weekly or when oil is in warning/unacceptable condition: Viscosity comparison (Kittiwake)
    • 2. New Oil (prior to onload)
    • a. Clear & Bright
    • b. Viscosity by Kittiwake OTC
  12. Typical Viscosity in Lube Oil
    Would consult table in 262
  13. 9000 Series Oil (Diesel)
    Test for viscosity/fuel dilution
  14. What is an FSS Sample and when is it required?
    • Fuel Separator Sump Sample
    • Visual (C&B) Test 
    • 5 mins after operation
    • every hour
  15. EEBD
    • Good for 15 years
    • 10 secs to put on
    • 10 mins to egress
  16. Pass/Fail for 9000 series oil viscosity
    Anything above 2 is Marginal/Warning/Unacceptable
  17. F-76 CCFD Passing Criteria
    • 2.64 mg/L
    • 40 ppm
  18. How to BS & W
    • L/O: Put 50mL lube oil + 50mL solvent in centrifuge tubes
    • Spin for 31 mins
    • F/O: Put 100mL into centrifuge tubes
    • Spin for 16 mins
  19. What do if L/O is cloudy?
    • Sit for 30 mins
    • Heat water to water bath to 120F
    • Transparency test
  20. Explain visible sediment test
    • Sit sample upright for 10 mins
    • Sit sample sideways 10 mins
    • Observe for sediment > 1/8" OR
    • Observe for solid unbroken line
  21. What samples are taken off FOCM and when?
    • 5 mins after start/Every 8 hours
    • FWD/CFD
  22. When do we test filter/separator towers (F-76) and what tests?
    • 5 mins after initialize transfer
    • CFD/FWD/C&B
  23. When do we WIP Storage/SVC tanks?
    • Weekly
    • Every 7 days when not in use
  24. WIP Test Pass/Fail Criteria
    • Storage: Above 3" strip down to 1" or until C&B passes from discharge of stripping/xfer pump
    • Service: Above 1" strip down to below 1" & SAT BS&W or C&B
  25. Lube Oil Sample: Sumps larger than 1 gallon
    • Must be tested daily
    • Also 24 hrs prior to start
    • Prior to onload
    • 24hrs after strikedown
    • operating in unusual conditions/after casualties
  26. BS & W Standards
    • Sat: Sediment < .1% & Combined < .2%
    • Warning: Sediment <.1% & Combined .2 to less than .4%
    • UNSAT: Above .1% sediment or .4% combined
  27. Sample fails BS & W
    • Online: Stay online for 7 days, notify CO and troubleshoot
    • offline: Need CO permission to start
  28. UNREP Fuel Testing Requirements from commercial supplier
    • Flashpoint
    • API
    • BS&W
  29. NATO UNREP Fuel Testing Requirements
    • Start/Mid/Finish: BS&W: .1% Max
    • Every 15 mins: Clear & Bright
  30. Ship storage fuel testing requirements
    Prior to underway and weekly: WIP test
  31. fuel service tank testing requirements
    • 8 hours before use: C&B
    • weekly: wip
  32. Filter Separator Transfer testing
    • 5 mins after transfer start
    • Diesel: C&B
    • GT: CFD/FWD (2.64 mg/L / 40ppm)
  33. FOCM testing
    • 5 hours after start and every 8 hours after
    • CFD/FWD
  34. Filter Separator sampling
    • 5 mins after transfer
    • every 4 hours after
    • C&B
Author
esmenikmati
ID
330564
Card Set
LCS EOOW Board
Description
LCS 2 EOOW BOARD
Updated