Soil erosion prevention and sedimentation control requires thoughtful ______ to be effective.
Planning
-
A SESC permit and plan is required at a minimum for all earth changes that disturb ______ or more acres or that are located within ______ feet of the water's edge of a ______ or ______.
-
It is the responsibility of the permit applicant to develop (or hire someone to develop) a ______ - ______ SESC plan.
site - specific
-
SESC plans must contain specific information. In regards to SESC measures, the ______ and description for installing and removing all proposed temporary SESC measures must be included as well as the ______ and location of all proposed permanent SESC measures must be shown on the plan.
-
USGS maps are also known as ______ maps or ______ maps.
-
______ lines connect points of equal surface elevations.
Contour
-
The contour ______ is the vertical distance between adjacent contour
lines on the map.
Interval
-
A ______ is defined as the area of land that drains to a given point.
watershed
-
The three common ways to express slope on a plan or map are as a ______, a ______ or in ______.
-
______ provides a reasonably accurate means of measuring distance.
Pacing
-
Sensitive areas include such things as ______, ______ and ______ that require special protection.
-
Critical erosion areas are areas that are more ______ to erosion or will be ______ to stabilize.
-
Each project must be ______ (and the inspections ______) by a person trained under Part 31 and 91.
-
-
A ______ - ______ meeting between the inspector, permittee, contractor, project engineer, and the SESC agent can eliminate many potential problems.
pre-construction
-
During construction, temporary SESC measures must be ______ daily.
Maintained
-
Inspections by the SESC inspector should be both ______ and ______.
Scheduled and unscheduled
-
If the project is not completed and permanently stabilized before fall, ensure that ______ measures are in place and ______ throughout the winter.
-
SESC controls must minimize on-site ______, off-site ______, and reduce all ______ leaving the site to ______-______velocities.
- Erosion
- sedimentation
- runoff
- non-erosive
-
Temporary control measures should be ______ and ______ prior to starting the earth change.
-
Permanent control measures should be installed as early as ______ in the construction schedule and always within ______ days after reaching final grade.
|
|