Refurbishment Remove and Refit

  1. Tail light each
    0.33 Hours
  2. Head light each
    0.5 Hours
  3. Window Glass (side window),  Includes Back fill (includes 3 tubes of MS 1 per window).
    5 Hours
  4. Front Windscreen 1 piece each (includes 14 tubes/screen).
    6 Hours
  5. Front Windscreen 2 piece/half (includes 10  tubes).
    5 Hours
  6. Hopper x2
    2.5 Hours
  7. Engine Door
    2.5 Hours
  8. Locker Door
    1.5  Hours
  9. Fit a standard MAN size skirt panel
    1.25 Hours
  10. Remove and refit an ADL panel
    1.25 Hours
  11. Fit a large panel such as those on a Kiwi Bus Build.
    2 Hours
  12. Fit 1 piece Kiwi Scania Bumper.
    2 Hours
  13. Fit 3 piece Kiwi Scania Bumper.
    3 Hours
  14. Decommission and recommission Scania/Volvo
    1.5 Hours
  15. Decommission and recommission MAN
    .05 Hours
  16. Electrical checks Scania/Volvo coach
    1.25 Hours
  17. Electrical checks Scania/Volvo City Bus
    0.75 hours
  18. Electrical  checks MAN
    1.25 Hours
Author
john20
ID
297848
Card Set
Refurbishment Remove and Refit
Description
Quote
Updated