What percent ratio of time is on the job vs industry training?
80% vs 20%
-
Requirements for certification are developed by who on the recommendation of who?
- Alberta Apprenticeship and Industry Training Board
- Provincial Apprenticeship Commitee
-
What are the two main duties of the LAC?
- Monitor Apprenticeship programs
- Make recommendations to PAC
-
What are the two main duties of the PAC?
- Monitor LAC activities
- Make recommendations to Board
-
The works with industry, employer, and employee organizations and technical training providers to:__________
- Alberta Advanced Education and Technology
- Facilitate industry's development and maintenance of training and certification standards
-
Who is responsible for Apprenticeship Safety?
Shared between the government, employers, employees, apprentices, and the public.
-
Employer required safety training is whose responsibility?
The employer and the apprentice
-
Define Annular Space.
Distance between the penetrating item and the surrounding opening.
-
Define Backing Material.
Material used to set the depth of fire stop systems.
-
Define combustible.
A material that fails to meet the acceptance criteria.
-
Define draft stopping.
Materials used to prevent the movement of air, gasses, and smoke such as red caulking.
-
Define endothermic reaction.
Absorption of energy during a chemical reaction.
-
Define exothermic reaction.
Production of energy during a chemical reaction.
-
Define F-rating.
The time a fire stop system is rated for. (Fire protection rating)
-
Define Fill, Void, or Cavity Material.
The fire stop material.
-
Fire separation.
A fire wall, floor or ceiling.
-
Define fire compartment.
An enclosed space in a building.
-
Define fire damper.
A flap in a duct to stop smoke and flame.
-
Define H-Rating.
The resistance to fire hose spray during a fire.
-
Define Intumescent.
Expands when exposed to heat.
-
Define L-Rating.
Measurement of air leakage during a fire.
-
Define Membrane Penetration.
An opening made through a fire assembly.
-
Define Passive Fire Protection.
A system designed to confine smoke and fire.
-
Define Point of Contact.
Where the penetration touches the opening wall.
-
Define T-Rating.
The time required for the unexposed surface to rise by 325 degrees.
-
Define Through Penetration.
An item passing entirely through a fire wall.
-
What is the ULC?
The Underwritings Lab of Canada.
-
Define the first letter in the Numbering System Penetrations.
- F - Floor
- W - Wall
- C - Combined
-
Define the second letter in the Numbering System Penetrations.
- A - Concrete < 5" thick
- B - Concrete > 5" thick
- C - Framed Floors
- J - Concrete / Block Walls < 8" thick
- K - Concrete / Block Walls > 8" thick
- L - Framed Walls
-
Define the Number Series' in the Numbering System Penetrations.
- 0000 - No penetration item
- 1000 - Metallic Pipe / Conduit
- 2000 - Non-Metallic Pipe / Conduit
- 3000 - Electrical Cables
- 4000 - Cable Trays
- 5000 - Insulated Pipes
- 6000 - Electrical Ducts
- 7000 - Mechanical Ducts
- 8000 - Multiple Items
- (Items cannot be combined)
-
Define the 1st letter in the Numbering System Joints.
- FF - Floor to Floor
- WW - Wall to Wall
- FW - Floor to Wall
- HW - Head of Wall
- CW - Curtain Wall
- BW - Bottom of Wall
-
Define the 2nd letter in the Numbering System Joints.
-
Define the Number Series in the Numbering System Joints.
- 0000 - 2" Joint Width
- 1000 - 2" to 6" Joint Width
- 2000 - 6" to 12" Joint Width
- 3000 - 12" to 24" Joint Width
- 4000 - > 24" Joint Width
|
|