CRJ 200 Flows

  1. Circuit Breakers
    Closed
  2. Nosewheel Steering
    OFF
  3. Hydraulic Pumps
    OFF
  4. Landing Gear Lever
    DOWN
  5. Flight Spoiler Lever
    0

    if one or more spoiler panels are not retracted, ensure spoiler area is clear prior to applying hydraulic power.
  6. Flaps Lever
    SET ACTUAL POSITION
  7. Radar
    OFF
  8. ADG Manual Release
    STOWED
  9. Battery Master
    ON
  10. APU/AC Electrics
    AS REQUIRED/ESTABLISHED
  11. AHRS (both)
    MAG
  12. Emergency Equipment
    CHECKED
  13. Gear and Safety Pins
    ON BOARD
  14. Airplane Documents
    CHECKED
  15. Hydraulic Pump 3A
    ON

    Prior to turning 3A pump on, confirm nose door area clear. When flight controls and nosewheel are confirmed clear.
  16. Nosewheel Door
    CLOSED
  17. FMS Initialization
    COMPLETE
Author
JFrane
ID
239093
Card Set
CRJ 200 Flows
Description
Flows
Updated