-
Draw the hierarchy of Documents
-
Purpose of the UFSAR
Describes what is in the plant and somewhat ho we operate it
-
Contents of T.S.
- -Definitions
- -Safety Limits
- -LCO's
- -Design Features
- -Administrative Controls
-
contents of an LCO
- Applicability: Modes, Temp, Pressure, etc.
- Actions: Condition, Required Action, Completion Time
- SR: Surveillance, Frequency
- Gives confirmation that the equipment is operable
-
How do LCO's relate to a system
Meeting the LCO’s ensures that the Safety Analysis is valid
-
Discuss the purpose and scope of 73DP-9ZZ14: Surveillance Testing Procedure
- Purpose: Implement the ST program per TS
- Scope: High Level; Govern the ST programApplies to all SR’s defined in TS and TRM
-
individual responsibilities of the ST program owner
- Establish accountability of SR’s
- Review Changes
- Maintain thorough knowledge
- Owning action plans
- provide clarification
- identify performance trends
- own the Master ST List
-
Describe the function of the ST and Activity Tracker (STAT) Program, including:
What ST’s are not included in the program?
How are those tests controlled?
- Not in Program:
- Equipment not in Appendix E; Not included in MMS
- Equipment in which ST periodicity is less than 1 week
- Control:
- Controlled through ST procedure itself, or within department procedures that control scheduling of that ST itself.
-
How does the design basis are related to ST requirements
Ensure that the equipment meets terms for operability, which in turn ensures that the safety analysis is valid.
|
|