THE MAJOR RESPONSIBILITY OF WHAT IS TO PROVIDE MATERIAL IN SUPPORT OF THE OPERATION AND MAINTENANCE OF AERONAUTICAL EQUIPMENT?
NAVY SUPPLY SYSTEM
WHAT ASSIGNS A FORCE ACTIVITY DESIGNATOR (FAD) TO ALL ACTICVITIES IN THE NAVY ESTABLISHMENT FOR DETERMINING PRIORITIES FOR MATERIAL SUPPORT?
UNIFORM MATERIAL MOVEMENT AND ISSUE PRIORTY SYSTEM
WHAT INVOLVES A DIRECT RELATIONSHIP BETWEEN THE TWO COMPLEX OPERATIONS OF MAINTENANCE AND SUPPLY?
MATERIAL MANAGEMENT
A MEETING WILL BE HELD AT LEAST HOW OFTEN BETWEEN SUPPLY, O-LEVEL, AND I-LEVEL MAINTENANCE REPRESENTATIVES, AND UNIT QA NAMDRP PERSONNEL TO DISCUSS NMCS, PMCS, EI/PQDR EXHIBITS, AND OTHER HIGH PRORITY RELATED REQUIREMENTS?
WEEKLY
WHAT IS CHARGED FOR THE RFI REPLACEMENT OF A NON-RFI ASSET THAT IS BCM'D AND RETURNED TO THE WHOLESALE SUPPLY SYSTEM?
NET PRICE
WHAT IS CHARGED FOR ISSUES WHEN THE REQUISITIONER DOES NOT MAKE A TURN-IN?
STANDARD PRICE
WEAPON SYSTEM COSTING IS ACCOMPLISHED AT WHAT?
NAVICP
WHAT IS A PROCEDURE WHERE ALL SUPPLY ACTION DOCUMENTS IN SUPPORT OF MAINTENANCE ARE ENTERED AND MERGED WITH THE MATERIAL REPORTING HISTORY FILE FOR REPORTING TO COMNAVAIRSYSCOM?
MATERIAL REPORTING
MATERIAL REPORTING DATA WILL BE VALIDATED AND SUBMITTED TO THE LOCAL NDCSC WITHIN WHAT TIME FRAME AFTER THE SUPPLY TRANSACTION IS COMPLETED?
1 WORK DAY
WHAT SYSTEM IS THE AUTHORIZED MEDIUM FOR DIRECTING THE ACCOMPLISHMENT AND RECORDING OF MODIFICATIONS AND ONE-TIME INSPECTIONS OF EQUIPMENT?
TDSA
WHAT PROMULGATES POLICY AND PROCEDURES FOR THE MANAGEMENT OF AIRCRAFT TIRES AND TUBES?
NAVAIR 04-10-506
WHAT PROVIDES FOR INSTANCES WHERE REMOVAL OF A FAILED AIRCRAFT COMPONENT IS NOT FEASIBLE OR ADVISABLE PRIOR TO RECEIPT OF THE REPLACEMENT COMPONENT; THEREFORE, QUALIFIES AS AN ITEM TO BE RETAINED IN PLACE?
NAVICP CRIPL
WHAT IS A DETAILED STATEMENT OF AN I-LEVEL REPAIR FACILITY'S COMPONENT REPAIR CAPABILITY?
INDIVIDUAL COMPONENT REPAIR LIST (ICRL)
WHAT CONTAINS HIGH USAGE, MAINTENANCE RELATED CONSUMABLE MATERIALS, WHICH HAVE BEEN EXPENDED FROM THE SUPPLY DEPARTMENT STOCK RECORDS AND FINANCIAL ACCOUNTS?
PRE-EXPENDABLE BIN UNIT
TOTAL AVERAGE TURN AROUND TIME WILL BE LIMITED TO A MAXIMUM OR HOW MANY DAYS FOR EACH NIIN IN EACH CASE?
20 DAYS
WHAT ITEMS ARE THOSE ORDERED FOR A SPECIFIC CUSTOMER JOB ORDER AND IN THE QUANTITIES REQUIRED FOR SCHEDULED WORK BASED ON A BILL OF MATERIAL?