  1. To the greatest extent possible, how should maintenance be performed?
    On a preplanned scheduled basis.
  2. Using equipment generates what type of maintenance?
    Corrective (unscheduled)
  3. What are the two basic types of scheduled and unscheduled maintenance?
    On-equipment and off-equipment.
  4. Maintenance cross-tells are used for what purpose?
    to highlight trends, benchmarks, or safety conditions relating to maintenance equipment, personnel, training, or processes.
  5. What should typically be included in a maintenance cross-tell report in addition to details such as national stock numbers, part numbers, and specific location of problem areas?
    relevant background information and history
  6. What are two major goals of Intermediate Repair Enhancement Program (IREP) meetings?
    increase local repair capability where appropriate and to reduce the overall cost of operations.
  7. In order of increasing capability, what are the three separate levels of maintenance?
    Organizational, intermediate, and depot.
  8. Which level of maintenance is performed off-equipment at the backshop level?
    Intermediate level.
  9. What level of maintenance is used for complex repairs and is located at a major repair facility?
    Depot level.
  10. What combined maintenance approach modifies or eliminates the intermediate (off-equipment) function, where possible, by consolidating that repair function at the depot level?
    Two-level (2LM).
  11. What type of maintenance facility is a hybrid of 2LM and 3LM and combines intermediate-level maintenance from multiple bases to one location?
    Regional repair center.
  12. What type of specialized regional repair facility provides intermediate-level maintenance for selected commodities?
    Centralized Repair Facility (CRF).
  13. How can a successful R&M program be defined?
    One that promotes the ability to identify and correct system deficiencies before they affect combat capability.
  14. What is the primary scope of the Product Improvement Working Group (PIWG)?
    To address product deficiencies affecting R&M that the field unit cannot resolve and resolve DRs that the single manager assigns to them.
  15. Who takes the lead in identifying, tracking, assessing, and correcting R&M deficiencies on their assigned air and space equipment and also co-chairs the PIWG?
    Single Manager.
  16. As an end user, what is your primary focus in the DR process?
     To identify deficiencies and properly submit reports.