To the greatest extent possible, how should maintenance be performed?
On a preplanned scheduled basis.
-
Using equipment generates what type of maintenance?
Corrective (unscheduled)
-
What are the two basic types of scheduled and unscheduled maintenance?
On-equipment and off-equipment.
-
Maintenance cross-tells are used for what purpose?
to highlight trends, benchmarks, or safety conditions relating to maintenance equipment, personnel, training, or processes.
-
What should typically be included in a maintenance cross-tell report in addition to details such as national stock numbers, part numbers, and specific location of problem areas?
relevant background information and history
-
What are two major goals of Intermediate Repair Enhancement Program (IREP) meetings?
increase local repair capability where appropriate and to reduce the overall cost of operations.
-
In order of increasing capability, what are the three separate levels of maintenance?
Organizational, intermediate, and depot.
-
Which level of maintenance is performed off-equipment at the backshop level?
Intermediate level.
-
What level of maintenance is used for complex repairs and is located at a major repair facility?
Depot level.
-
What combined maintenance approach modifies or eliminates the intermediate (off-equipment) function, where possible, by consolidating that repair function at the depot level?
Two-level (2LM).
-
What type of maintenance facility is a hybrid of 2LM and 3LM and combines intermediate-level maintenance from multiple bases to one location?
Regional repair center.
-
What type of specialized regional repair facility provides intermediate-level maintenance for selected commodities?
Centralized Repair Facility (CRF).
-
How can a successful R&M program be defined?
One that promotes the ability to identify and correct system deficiencies before they affect combat capability.
-
What is the primary scope of the Product Improvement Working Group (PIWG)?
To address product deficiencies affecting R&M that the field unit cannot resolve and resolve DRs that the single manager assigns to them.
-
Who takes the lead in identifying, tracking, assessing, and correcting R&M deficiencies on their assigned air and space equipment and also co-chairs the PIWG?
Single Manager.
-
As an end user, what is your primary focus in the DR process?
To identify deficiencies and properly submit reports.
|
|