T-6B checklists

  1. Lineup Check
    • 1. Landing/taxi light- on
    • 2. Transponder- mode to alt
    • 3. Nose wheel steering- off
    • 4. Probes anti-ice- on
    • 5. EICAS display- check (BOTH)
  2. After Takeoff
    • 1. Gear- Up (BOTH)
    • 2. Flaps- Up (As required) (BOTH)
  3. Operations Check
    • 1. Hydraulic Pressure- check
    • 2. Electrical systems- check
    • 3. Fuel quantity/balance- check
    • 4. OBOGS- check flow indicator for normal operations (BOTH)
    • 5. Engine Instruments- check
    • 6. Pressurization- check
    • 7. Position- report
  4. Climb (Passing 10,000 feet)
    • 1. OBOGS- check flow indicator for normal operations (BOTH)
    • 2. DEFOG- as required
    • 3. Vent control lever- as required
    • 4. Pressurization- check
  5. Pre-Stalling, Spinning, and Aerobatics Check
    • 1. Loose items- stowed (BOTH)
    • 2. Engine instruments- check
    • 3. Fuel balance- check less than 50 pounds
  6. Descent
    • 1. PFD- check (BOTH)
    • 2. Altimeters- set (BOTH)
    • 3. MASTER ARM- as required
    • 4. DEFOG- as required
    • 5. Vent control lever- as required
  7. Before Landing
    • 1. DEFOG- off
    • 2. Engine instruments- check
    • 3. Gear- down (BOTH)
    • 4. Brakes- check, as required
    • 5. Flaps- as required (BOTH)
    • 6. Speed brake- verify retracted
Author
Anonymous
ID
176782
Card Set
T-6B checklists
Description
memorized inflight checklists
Updated