When you tested the installation the test result was 0.2 M. You proceededto certify the installation on a Certificate of Compliance as it complied withAS/NZS 3000.Describe the actions and further tests you took to verify that the installationcomplied with AS/NZS 3000. Include in your description the permittedminimum value of any test results.
The actions have to show: Disconnecting the water heater:(1 mark)= Retesting the installation as per (c) above.(1 mark)= A minimum of 1 MI test value for the installation(½ mark)= Testing between phase/neutral and earth of the water heater.(1 mark)= A minimum value of 10,000I for the water heater