During normal full power operation of Unit Two, the following alarms are received indicating loss of DC power:
UA-09 2-5
UA-13 4-1, 5-10, 6-2, 6-10
A-01 1-6, 2-5, 2-B, 5-5, 6-4
A-02 4-4
A-03 1-3, 2-2
A-04 1-8, 5-1
A-05 1-7, 2-6, 3-6, 5-3, 5-6
A-06 1-6, 5-6, 5-8
Which 125 VDC distribution system has been lost?
A. 2A-1.
B. 2A-2.
C. 2B-1.
D. 2B-2.
A. 2A-1.
Per Attachment 1 of AOP-39.0 it can be determined that DC panels 4A, 6A and 12A have been lost. Per Figure 2, these panels are powered from the 2A·1 portion of the 125/250 VDC Division I system.