More CPT's test

  1. Standpipe Attack

    - Default layoff?
    - Timiing Rules
    • - Officer: Irons, TIC, 3 spare bottles
    • Driver: 100' 2 1/2" w/ forg timp, spanner wrenches
    • Third: 1 3/4" line w/ gated wye

    - Do not initiate until Reverse Supply engine is within 5 minutes

    - 10 minutes to get water on the fire.
  2. Where are the procedures for reporting vehicle fires?
    - Operations Policy #326

    - RiskWeb
  3. C.A.V.A.L.I.E.R.
    • - Constuction / Collapse
    • - Attack point / Agent
    • - Ventilation
    • - Appliances
    • - Location & characcteristics
    • - Items of note
    • - Energy
    • - Rescue / Risk
  4. Monitor Attack

    1. Default lay off?
    2. Clamp where?
    3. Spikes how deep?
    4. Monitor operations?
    5. Default EP? / Tips?
    • 1. BLP, monitor, barrel, tips, fog tip, monitor base, distributor, 1 full slot load, spike, mallet, rope bag
    • 2. 10'-15' behind appliance
    • 3. 1/8" deep
    • 4. 30 degree angle is ideal, stay above 20 degrees
    • 5. 125 psi + FL / 1 3/4" tip
  5. What information is included in the transfer of command?
    • -Incident conditions
    • - Action plan
    • - Progress
    • - Safety considerations
    • - Deployment & assignments
    • - Uncommitted resources
    • - Appraisel of needs for additional resources
Author
sdellinger
ID
13341
Card Set
More CPT's test
Description
part II
Updated