State the purpose of the Condensate System
Primary Functions
- Primary Functions:
- 1. Transfers condensate from the HW to the S/G for reuse.
- 2. Preheats the condensate for greater overall plant efficiency
- 3. Provides suction requirments for MFPs.
- 4. Purifies condensate prior to startup.
-
State the purpose of the Condensate System
Secondary Functions
- 1. Make up to stat or cooling water system (electrical generator)
- 2. Provides seal injection to variuos condenser feedwater pumps.
- 3. Makeup to Gland seal water tanks
- 4. Flushing and regen water to Demin. Beds
- 5. Exhausted hood spray
- 6. Makeup to Aux. Boiler
-
State the purpose and the capacity of the condensate storage tank including the Tech Spec minimum requirements.
- make up to the condensate system on the loss of water inventory.
- Supplies Aux feedwater
- Initial filling and venting of the condensate system (secondary system and S/G)
- Tank Capacity - 385,000
- -has the capability to pump water from one tank to the other but is rarely used.
- Tech Spec equal to or lesser to 240,000 gal to make sure there is enough water for the aux feedwater
-
Describe the hotwells as to location, design, and level control.
- Located in the bottom of the condenser
- Main Condenser - excepts exhaust from the Low Pressure Turbines and the steamdumps
- Condenser Vacuum- lcv 2-3 dumpback if lvl is too high. If the lvl gets to low lcv 2-9 will open allowing water to flow in via vacuum drag. Must be mantained in range to provide enough suction head for the hotwell pumps.
-
Describe the Hotwell Pumps as to type, capacity, and power supply.
- 6.9KV unit boards or 480V
- 6700gm at 600ft total discharge head
- centrifugal pumps, vertically mounted, 4 stage
- mechanical seals - keeps water from leaking from the pump cooling supplied by gland seal water system
-
Identify the logic required to be met before a hotwell pump can be started.
- Start Interlocks
- FCV 205 and FCV 210 or FCV 211 and FCV 216 must be open.
- *one set of inlet valves and outlet valves must be open to establish flow
- manual start only
- Trip
- automatic
- loss of flowpath
- electrical fault
- manual
-
State the purpose of the condensate Demineralizers
- Removes corrosion products, radionuclides, impurites
- 6 Demin tanks (only used during startup)
- 5 have Demins (resins)
- 1 is empty
- chemicals are injected for pH & oxygen removal
-
Identify the conditions which will require the condensate demineralizers bypass valve FCV-14-3 to be opened
High pressure differential *(60PSID)
-
Identify the two purposes for flow transmitter FE-2-35 and explain how its input signal is measured.
- flow transmitter 2-35 (FE2-35) measured by the difference in pressure of the upstream & downstream tapoffs
- 1.Used to control FCV 2-35 (condensate recirc. valve.) to ensure minimum of 5500gpm
- HWP Protection
- Ensure there is flow through GSC for HX and MFPT
- Keeps demin beds compacted
- 2. to clean up the condensate by removing oxygen
-
Describe the condensate demineralizer booster pumps as to type, capacity, and power supply.
- 3 ConDI Booster Pumps
- Horizontal, single stage, centrifigul, 6700 gal TDH 150ft.
- Located in the basement of the turbine building
- 480V motors, 2 pumps are placed in service on startup. The 3rd pump is started at >70% power
-
Identify the logic required to be met before a condensate demineralizer booster pump can be started.
- Starter Interlocks
- 1.) Suction valve must be fully opened
- 2.)The suction pressure must be greater than 20 psig
- 3.)No FW isolation signal
- 4.)Must have addiqute Bus E available
- 5.)Local push button must be reset
- Pump Trips
- 1.)Low suction pressure < 20psig for 3 seconds
- 2.)Electrical fault
- 3.)Main turbine trip
-
Explain the purpose of the gland seal steam condenser.
- Condense the steam leak off from the MT and MFPT seals and exhaust non-condensible gases to the atmosphere
- 1 fan is running to keep at 22"-25" water vacuum. 2nd fan is on standby for 17" water vacuum.
-
Explain how flow through the gland steam condenser is controlled.
FCV 2-260 stays completely closed until 30 lbs of water pressure is reached. Then the valve opens to divert flow so that flow doesnt exceed 3,000gpm
-
State the purpose of the steam generator blowdown heat exchangers
removes heat from the steam generator blowdown so that it can be injected upstream of the ConDI.
-
Explain how flow is ensured through the 2nd stage steam generator blowdown heat exchanger
through a flow control orifice
-
State the purpose of the main feed pump turbine condensers
- to condense the MFPT exhaust steam
- Vacuum is maintained by a 4" line connected to the condenser (connected to the main condenser)
-
Identify the conditions which will cause the main feed pump turbine condenser valves to automatically close
- If both pumps are running and one trips off the associated inlet/outlet valves will close while the 2nd remains open. If both trip at the same time then both sets of valves will stay open for both pumps.
- If only one pump is running the last valve to trip will remain open.
|
|